NDT Acceptance Criteria by Asset: Finding the Code That Decides Accept or Reject

NDT acceptance criteria come from the construction code or product specification for the asset, never from the code that describes the test method. A pressure vessel is judged under ASME Section VIII, process piping under ASME B31.3, power piping under B31.1, a boiler under Section I, a new tank under API 650, a pipeline girth weld under API 1104 and a steel building under AWS D1.1.

ASME Section V and the ASTM practices tell an inspector how to perform radiography, ultrasonics, magnetic particle, penetrant or visual examination. They do not say whether an indication is acceptable. That decision belongs to the document the asset was designed and built to, and the purchase order or engineering design can tighten it. In service the question changes again: API 510, API 570, API 653 and the National Board Inspection Code govern inspection and repair, and an indication found in an operating vessel is not automatically a rejectable defect, because the owner's engineer may assess it for fitness for service. So the first step in any acceptance question is the same: establish the asset, the code and edition it was built to, whether it is new construction or in service, and what the contract adds. The table and sections below map the common industrial assets to the clauses where their criteria actually sit.

Source: ASME BPVC Section V, Section VIII Division 1 (UW-35, UW-51, UW-52, Mandatory Appendices 4, 6, 8 and 12) and Section I (Part PW); ASME B31.3 (Table 341.3.2) and B31.1 (para. 136.4); API 650 (Section 8), API 653, API 1104 (acceptance standards for nondestructive testing); AWS D1.1 and AWS D1.5 (inspection clauses); ASTM E446, E186 and E280 reference radiographs; MSS SP-53, SP-54, SP-93 and SP-94. Clause numbers as in the current editions; the edition named in the contract or construction code governs.

Technically reviewed by Anoop Rayavarapu — ASNT NDT Level III (UT, RT, MT, PT, VT)
Where the NDT acceptance criteria live, by asset
AssetConstruction code or specificationWhere the acceptance criteria areIn-service document for repairs and inspection
Pressure vessel (non-nuclear)ASME BPVC Section VIII Division 1UW-51 (full radiography), UW-52 (spot radiography), Mandatory Appendix 4 (rounded indications), Appendix 12 (ultrasonic), Appendices 6 and 8 (MT, PT), UW-35 (visual)API 510 or the National Board Inspection Code
Process pipingASME B31.3Table 341.3.2, by imperfection and fluid service, for visual and radiographic examination; ultrasonic acceptance in the code's ultrasonic examination rules, with Appendix R as an alternativeAPI 570
Power pipingASME B31.1Para. 136.4, method by methodOwner's program; NBIC for boiler external piping repairs
Power boilerASME BPVC Section IPart PW: radiographic and ultrasonic acceptance standards, plus the referenced appendicesNational Board Inspection Code
Atmospheric storage tank (new)API 650Section 8: radiography, magnetic particle, penetrant, ultrasonic, visual and vacuum-box testingAPI 653 (repairs, alterations, reconstruction)
Pipeline girth weldAPI 1104, invoked by 49 CFR 192 and 195 and by ASME B31.4 and B31.8API 1104 acceptance standards for nondestructive testing, with an optional alternative based on fitness for purposeOperator's integrity management program
Structural steel buildingAWS D1.1Inspection clause: visual table plus radiographic and ultrasonic acceptance criteria for statically and cyclically loaded connectionsEngineer of record; repairs to the same code
Steel highway bridgeAWS D1.5 (AASHTO/AWS)Inspection clause, with stricter rules for tension and fracture-critical membersOwner agency's bridge program
Steel castingPurchase order with ASTM or MSS referencesSeverity levels against ASTM E446, E186 or E280 reference radiographs; MSS SP-53, SP-54, SP-93, SP-94 for valve castingsProduct specification or repair procedure
The construction code is the floor. An owner specification, the engineering design or a purchase order can make any of these limits stricter, and the stricter rule then applies.

Method documents and acceptance documents are different things

The single most common error in contractor procedures is citing ASME Section V as the acceptance standard. Section V Article 2 governs how a radiograph is made, Article 4 how an ultrasonic weld examination is set up and scanned, Articles 6 and 7 how penetrant and magnetic particle tests are performed, and Article 9 how a visual examination is done. Not one of them contains a reject limit. They exist so that every construction code can point to the same technique rules and then apply its own acceptance standard. The same split applies to ASTM practices such as E709 for magnetic particle or E165 and E1417 for penetrant: they describe the test, and a product specification supplies the criteria.

When a report says a weld was accepted to Section V, it has not said anything a reviewer can check. A defensible report names the construction code, the edition, the clause or table used, and the examination method and technique, so an auditor can trace each accept or reject decision back to a written limit. For the technique side of the major methods, see ASME Section V Article 2, Article 4, Article 6 and Article 7.

How to establish which code governs an asset

For a pressure vessel, the manufacturer's data report and the nameplate state the code, division and edition, and the data report records which joints were radiographed and to what extent. For piping, the line class or piping specification in the engineering design names the code and the fluid service category, and the inspection and test plan should turn that into examination percentages and acceptance references. For a tank, the data sheet and the purchase order name API 650 and any annexes. For structural steel, the contract documents and the engineer of record set the code and any supplementary requirements.

Where the paperwork is missing, the question is not answered by the inspector's habit. A Level III or the owner's engineer has to establish the design basis and record it before acceptance criteria are written into a procedure. A vessel nozzle built to Section VIII, the attached line built to B31.3 and a pipe support welded to AWS D1.1 can sit within arm's reach of each other and carry three different acceptance standards, so the inspection and test plan should assign the governing code weld by weld rather than leave it to the technician on the day.

Who examines, who inspects and who accepts

Acceptance criteria are applied by people in defined roles, and the roles are not the same from code to code. ASME B31.3 separates examination, which the fabricator's or erector's examiners perform, from inspection, which the owner's Inspector carries out to confirm that the required examinations and tests were done. On a Section VIII or Section I item the manufacturer examines and the Authorized Inspector verifies before the data report is signed. AWS D1.1 distinguishes the contractor's own fabrication and erection inspection from verification inspection performed for the owner, and a contract that names only an inspector has usually bought the first role without the second.

Pipeline work adds an operator's right that surprises contractors: API 1104 lets the company reject a weld that appears to meet the acceptance standards if, in its opinion, the depth of an imperfection may be detrimental. API 650 names the purchaser throughout its examination rules, for example as the party whose approval allows ultrasonic examination in place of radiography. In every case the technician applies the written criteria and reports what was found accurately, and the code decides whose signature closes the item.

Pressure vessels and boilers

Section VIII Division 1 sets radiographic acceptance in UW-51 for fully radiographed joints and in UW-52 for spot radiography, where a failed spot triggers two further spots and, if either of those fails, the whole weld increment is rejected, to be rewelded or fully radiographed. Rounded indications on fully radiographed joints are judged with the charts in Mandatory Appendix 4. Ultrasonic acceptance, where Division 1 calls for ultrasonic examination, sits in Mandatory Appendix 12, and the penetrant and magnetic particle criteria are in Appendices 8 and 6. Our guide to Section VIII Division 1 acceptance criteria works through them, and PT and MT acceptance in Section VIII covers the surface methods in detail.

Power boilers are built to Section I, which keeps its own examination and acceptance rules in Part PW rather than borrowing Division 1 wholesale. The differences matter in practice: boiler tube-to-header welds, attachment welds and pressure-part butt welds are each treated differently, and a vessel procedure cannot simply be relabelled for boiler work. See ASME Section I weld acceptance criteria.

Process and power piping

ASME B31.3 states its limits in Table 341.3.2. The table lists imperfections such as cracks, lack of fusion, incomplete penetration, internal porosity, slag inclusions, undercut, surface porosity, concave root surface and reinforcement height, and gives a limit for each by fluid service category and for severe cyclic conditions, while High Pressure Fluid Service has its own rules in Chapter IX. The table covers visual and radiographic examination; ultrasonic acceptance sits in the code's ultrasonic examination rules, and Appendix R offers alternative ultrasonic criteria based on flaw size. Examination extent is separate from acceptance: for Normal Fluid Service the code sets random radiography or ultrasonic examination of a percentage of circumferential butt welds, and progressive examination when a sample fails. See ASME B31.3 weld acceptance criteria.

ASME B31.1 power piping uses a different structure. Para. 136.4 sets the acceptance standards method by method, for visual, magnetic particle, liquid penetrant, radiographic and ultrasonic examination, and the mandatory minimum examination depends on the pipe's service conditions and size. A B31.3 acceptance clause copied into a B31.1 boiler external piping job is wrong even when the numbers happen to look similar. See ASME B31.1 weld acceptance criteria.

Storage tanks and pipelines

New atmospheric storage tanks built to API 650 are examined under its Section 8. Shell butt-weld radiography follows the standard's spot-radiograph pattern, with acceptance referring to the ASME Section VIII Division 1 radiographic standard, and magnetic particle and penetrant examinations refer to the Section VIII appendices. Bottom and roof welds are tested for leaks by vacuum box or other tightness methods, and ultrasonic examination can be used in place of radiography under the standard's annex for it. Repairs, alterations and reconstruction of tanks in service move under API 653, which then points back to API 650 for many acceptance questions. See API 650 weld inspection and acceptance criteria and API 653 shell minimum thickness.

Pipeline girth welds in US gas and liquid service are generally judged under API 1104, which federal pipeline safety rules incorporate by reference and which ASME B31.4 and B31.8 call for. API 1104 contains its own acceptance standards for each NDT method and an alternative acceptance approach based on fitness for purpose, which requires additional qualification and engineering work. The API 1104 weld acceptance criteria guide and API 1104 vs AWS D1.1 cover the detail.

Structural steel, bridges and castings

Buildings and general structural steel are welded and inspected to AWS D1.1. Its inspection clause sets visual acceptance in a table that distinguishes statically loaded from cyclically loaded connections, and gives separate radiographic and ultrasonic acceptance criteria for each loading type. The ultrasonic criteria are expressed through indication rating and length, which is why a D1.1 ultrasonic procedure cannot be run with a Section VIII calibration approach. Our AWS D1.1 weld acceptance criteria guide and AWS D1.1 UT acceptance criteria cover the building code.

Steel highway bridges are built to AWS D1.5, the AASHTO/AWS Bridge Welding Code, which is stricter for welds in tension and for fracture-critical members. See AWS D1.5 bridge weld acceptance criteria. Castings sit outside the welding codes altogether: the purchase order names a reference radiograph standard and a severity level for each discontinuity category, or for valves the MSS practices for radiography, magnetic particle, penetrant and ultrasonic examination. See casting NDT acceptance criteria.

Acceptance by method across codes

Some questions arrive by method rather than by asset: what are the ultrasonic acceptance criteria, or the radiographic ones. The honest answer is that there is no single set. Ultrasonic acceptance in AWS D1.1 is built on indication rating against a reference reflector and on discontinuity length, while Section VIII Appendix 12 rejects cracks, lack of fusion and incomplete penetration outright and limits other indications above the reference level by length relative to thickness, and the piping codes write ultrasonic rules of their own. Radiographic acceptance shares a common vocabulary of elongated indications, rounded indications and aligned groups, but the length limits and the treatment of porosity differ code by code.

Two method-based guides lay the main codes side by side so a reviewer can see where they part company: ultrasonic testing acceptance criteria by code and radiographic acceptance criteria by code. They are reference material, not substitutes for the clause: the acceptance clause in a procedure should always quote the governing code and edition.

Newer techniques do not move the acceptance code

Phased array, TOFD, computed radiography and digital detectors change how data are collected, not which document judges them. The construction code still supplies the limits, and where a code wants different limits for a different technique it says so: B31.3 offers flaw-size-based ultrasonic criteria in Appendix R, and Section VIII Division 1 permits ultrasonic examination in place of radiography under conditions it sets out.

What the newer techniques add is a qualification burden. The procedure, the scan plan and often a demonstration on representative flaws have to show that the technique detects and sizes what the acceptance criteria assume. The ultrasonic rating tables in AWS D1.1 were built around conventional pulse-echo work, for example, so a phased array or TOFD technique follows the specific annex or alternative-technique route the edition provides, with any approval by the Engineer that route calls for, rather than a direct read-across.

Repairs are re-examined under the code that rejected them

Every construction code sends a rejected weld back through repair and re-examination, but the details differ enough to matter in a procedure. Section VIII Division 1 refers weld repairs to UW-38 and requires the repaired area to be re-examined; at the manufacturer's option the repaired weld may be examined ultrasonically under Mandatory Appendix 12 instead of being re-radiographed, with the user's concurrence for material over 1 in. (25 mm) thick and a note on the Manufacturer's Data Report. Spot radiography adds the additional-spot rule described above, and B31.3 adds progressive examination when a random sample fails. API 1104 restricts crack repairs and requires repaired areas to be inspected by the means used originally and to meet its acceptance standards, while API 650 keeps extending the radiographic search outward from a failed spot until the limits of the defective welding are found.

A repair record should identify the original indication, the excavation, the repair welding procedure, the method and technique used for re-examination and the result against the same clause. Without that chain a reviewer cannot show that a repaired weld was judged by the criteria that rejected it, and a second repair in the same location, which API 1104 for one treats as a separate case needing its own qualified procedure, can pass unnoticed.

When the code gives no acceptance criteria

Some examinations are performed with no construction-code limit behind them: thickness surveys on a corroded line, baseline scans before a change of service, an owner's request to check a repair area by a method the code never required, or inspection of equipment that was never stamped. In those cases someone still has to write down what will be reported, what will be called rejectable and who decides. Leaving it to the technician produces reports that cannot be compared from one outage to the next.

The usual answer is an owner specification or a project-specific procedure, written or approved by a Level III and accepted by the owner before the work starts, that states the recording level, the evaluation level and the decision route for anything found. For in-service thickness data the limit is normally the minimum required thickness the owner's engineer has calculated, not a weld acceptance table. Our project-specific NDT procedures service covers that gap, and the same approach applies when a contract names a code edition the procedure has not yet been updated to.

Construction acceptance versus in-service findings

Construction codes decide whether new work is acceptable. They were never written to judge a flaw found ten years into service, and applying them that way either condemns equipment that is fit to run or misses the damage mechanism that matters. In service, API 510, API 570, API 653 and the National Board Inspection Code govern who inspects, how often and how repairs are made, and the owner's Authorized Inspector decides on the results. An indication outside the construction limits may be repaired, monitored or assessed by the owner's engineer under API 579-1/ASME FFS-1.

The inspection company's job in that situation is to characterise the indication accurately: its type, location, through-wall extent and length, with the technique and sizing method stated, so the engineer has data that will stand scrutiny. Atlantis performs that NDE and data review on API programmes; it does not make the fitness-for-service decision, which stays with the owner's engineer and inspector.

Editions change clause numbers as well as values

An acceptance clause can only be traced if its edition is stated, because committees renumber as well as revise. The B31.1 table that sets mandatory minimum examination was Table 136.4 in the 2016 edition; the 2022 edition lists it as Table 136.4.1-1 and adds Table 136.4.1-2, which relates weld imperfections to the methods that reveal them. AWS D1.1 moved its inspection rules from Clause 6 to Clause 8 in the 2020 edition, and the 2025 edition revised the visual criteria again. API 650 reached its 14th edition in August 2025, API 653 remains the fifth edition of 2014 carried forward by four addenda, and the federal pipeline rules still incorporate an earlier API 1104 edition than the 22nd now in print.

Two working rules follow. The procedure names the edition the contract or regulation invokes, not whichever copy is on the shelf, and work already performed stays assessed under the edition in force when it was done. When an edition changes partway through a project, treat the change as a document revision with an effective date, so that nobody judges one week's welds and the next week's against different tables without knowing it.

Where Atlantis fits

Our ASNT NDT Level III writes and reviews NDT procedures whose acceptance clauses cite the right construction code, edition and clause, qualifies and demonstrates techniques, and reviews contractor reports and radiographs against the governing criteria. See NDT procedure development, procedure qualification and demonstration and NDT Level III consulting.

In the United States, Atlantis technicians perform ultrasonic, magnetic particle, penetrant and visual inspection at the client's site. Atlantis does not perform radiography in the United States; where the code allows, ultrasonic testing is used for volumetric examination, and our Level III can review radiographs produced by a licensed radiography contractor. Inspectors learning to apply these criteria can start with Level II training and the free practice tests, and companies can build the acceptance clause into their report templates with NDT reports in Atlantis ERP.

Does ASME Section V contain acceptance criteria?

No. Section V sets examination methods and technique requirements for radiography, ultrasonics, magnetic particle, penetrant, visual and other methods, and the referencing construction code supplies the acceptance criteria. A procedure that cites Section V as its acceptance standard has left out the part an auditor checks, so the code, edition and clause or table should be named.

Which code gives the acceptance criteria for process piping welds?

ASME B31.3 Table 341.3.2. It lists the weld imperfections and their limits by fluid service and for severe cyclic conditions, for visual and radiographic examination; ultrasonic acceptance is set in the code's ultrasonic examination rules, with Appendix R as an alternative. The engineering design can make the limits stricter, and the examination extent, such as random radiography, is set separately in the code's examination requirements.

Are API 650 tank weld acceptance criteria the same as ASME Section VIII?

Partly. API 650 refers to the ASME Section VIII Division 1 radiographic and surface-examination standards for acceptance, but it sets its own examination plan, spot locations, vacuum-box testing and alternatives. The tank standard decides what is examined and where, and the referenced ASME rules decide whether an indication found is acceptable.

Can construction-code acceptance criteria be used for in-service inspection?

Not as a final judgement. Construction limits decide whether new work is acceptable. For equipment in service, the inspection code (API 510, API 570, API 653 or the NBIC) governs, and an indication outside construction limits may be repaired, monitored or assessed for fitness for service by the owner's engineer under API 579-1/ASME FFS-1.

What should an NDT report state about acceptance criteria?

The governing construction code and edition, the clause or table applied, the method and technique, each relevant indication with its location, type and size, and the accept or reject decision against the written limit. Recording acceptable relevant indications as well as rejectable ones lets a later examination distinguish growth from a new indication.

Who decides which acceptance criteria apply on a mixed-code job?

The design basis decides, and the inspection and test plan records it weld by weld. The owner's engineer or a Level III should establish the construction code for each component before work starts; the technician applies the criteria assigned, rather than choosing between codes on site.