NDT Consulting Services — ASNT Level III (Level 3) + API ICP Experts Globally

Atlantis NDT delivers expert NDT consulting services worldwide. ASNT NDT Level III and API 653-certified consultants for inspection contractors, owner-operators, and EPCs across the USA, India, Middle East, Europe, Australia, and Asia. Whether you search for an "NDT Level 3 consultant" or an "NDT Level III consultant," it is the same certification and the same team. Affordable, accessible, fully customizable. Free 30-min consultation + tailored quote within 24 hours.

Scope of Atlantis NDT Consulting

Atlantis NDT consulting covers: (1) ASNT NDT Level III consulting — outsourced Level III on retainer or per-project, multi-method (UT, RT, MT, PT, VT, ET, PAUT, TOFD); (2) Written-practice authoring per SNT-TC-1A 2024 + CP-189-2020 + ISO 9712:2021; (3) Procedure qualification record (PQR) authoring per ASME Section IX + AWS D1.1; (4) ISO 17020 + ISO 17025 + ISO 9001 inspection-body + cal-lab + QMS alignment + audit prep.

Code + Compliance Framework

Atlantis NDT consultants navigate the full code stack: ASME B&PV Sections V (NDE) + VIII (pressure vessel) + IX (welding) + XI (in-service nuclear); ASME B31.1/3/4/8/12 piping series; API 510/570/571/579/580/581/653/936/1169; NACE MR0175 + MR0103 sour-service; ISO 17635/17636/17640/17643/17638; EN 13445/13480; IACS Rec-20 marine; AWS D1.1/3.6/D17.1 welding. Dual-scheme inspector cert (ASNT + ISO 9712) for global mobility.

Industries Served

Atlantis NDT consultants serve refining (Aramco, ADNOC, Shell, ExxonMobil, Marathon, Valero, Phillips 66), petrochem (BASF, INEOS, Dow, LyondellBasell, SABIC), marine + offshore (Petrobras, Woodside, Equinor, Total, FPSO operators), aerospace (Boeing, Airbus, Lockheed, Pratt & Whitney, Safran), power generation (NTPC, EDF, TVA, Duke), LNG (Qatargas, Cheniere, Sempra), mining (BHP, Rio Tinto, Vale), hydrogen developers, CCS projects, and offshore wind (Ørsted, RWE, Iberdrola).

Atlantis NDT Integrated Stack

Consulting engagements integrate with the full Atlantis NDT ERP (asset register + cert tracking + audit-ready records), Digital Twin platform (3D asset model + damage-mechanism overlay), Reporting Software (mobile + offline field capture), Atlantis NDT LMS, Atlantis NDT Academy, and 3D Scanning Services. The technicians a Level III eventually signs off on build their pathway through Atlantis NDT training and certification.

Delivery Model

Three delivery models: (a) On-site mobilisation across North America, confirmed in your RFQ; (b) Remote procedure authoring + Level III sign-off, 24-hour turnaround; (c) Hybrid — local Level II + Atlantis Level III remote oversight. Free 30-min discovery call scopes asset class + damage mechanisms + code stack + delivery model preference.

Anonymised Customer Outcomes

Anonymised reference call on request.

Free Consultation

Atlantis NDT publishes no pricing — pricing varies by region, scope, delivery model. Request your free 30-minute consultation with Anoop Rayavarapu (ASNT NDT Level III multi-method, API 653, ISO 9001 Lead Auditor). Tailored quote within 24 hours. See also Consulting USA, Consulting India, Consulting Middle East, verticals, ISO 9001 + 17020 + 17025 alignment.

In more detail

Atlantis consulting covers written practice authoring, NDT procedure development and demonstration, examination writing and grading, retained or interim Level III cover, programme audits and gap assessment, programme build for new inspection firms, and Level III succession. Work runs across SNT-TC-1A, CP-189, NAS 410, EN 4179 and ISO 9712. Method scope decides who can sign what.

Every engagement resolves to a document somebody has to defend. The written practice is the root: SNT-TC-1A requires the employer to prepare one and have it approved by the employer's Level III, and every certificate the company issues traces back to it. Procedures sit under that, approved by a Level III and, where the referencing code demands it, demonstrated before an inspector under ASME Section V Article 1 T-150. Examination records sit under those. The regime is chosen by the customer contract, not by preference: aerospace and Nadcap work invokes NAS 410 or EN 4179, contracts naming ANSI/ASNT CP-189 impose a standard written in shall rather than a recommended practice written in should, and ISO 9712 replaces the employer scheme with third-party certification held by the individual. Scope from the artefact backwards and the regime becomes an input, not an argument.

The consulting engagement catalogue — what each produces, what triggers it, and how long it runs
EngagementThe artefact at the endWhat triggers itRegime that governs itShape of the work
Written practice authoringAn adopted, employer-signed written practiceFirst client audit, or a scheme edition changeSNT-TC-1A, CP-189, NAS 410One document cycle, then annual review
Procedure developmentApproved technique procedures, per methodNew code, new geometry, a rejected procedureASME Section V T-150, AWS D1.1, ISO 17635Per procedure, with demonstration where required
Examination oversightQuestion banks, answer keys, graded and retained papersQualification cycle, new hires, recertificationSNT-TC-1A / CP-189 examination clausesPer campaign, on your qualification calendar
Retained Level III coverA named Level III of record, continuously availableNo Level III on staff; contract requires oneDesignation recorded in the written practiceOngoing, sized to procedure and exam volume
Interim Level III coverContinuity of approval authority, plus a handover packResignation, long absence, acquisitionSame designation route, time-boxedWeeks to months, ending in a handover
Programme audit / gap assessmentFindings mapped to clause, owner and closure dateClient audit announced, or accreditation soughtThe regime the auditor will actually applyFixed review, then closure support
Programme buildA complete certification programme from zeroNew inspection firm, new method, new regionChosen regime, declared up frontStaged build to the first qualified technician
Succession planningNamed deputy, transferred records, no authority gapLevel III approaching retirement or exitEmployer written practiceOverlap period, then documented handover
Only the employer certifies personnel. Every row above is technical work an outside Level III performs for an employer that keeps the certificate, the records and the audit exposure.

The engagement catalogue, in full

Consulting enquiries land as one of eight jobs, and naming which one you have shortens everything that follows. Written practice authoring. Procedure development and demonstration. Examination oversight. Retained Level III cover. Interim cover after a departure. Programme audit and gap assessment. Programme build from zero. Succession before a named Level III leaves. Each ends in a specific artefact somebody has to defend in front of an auditor or a client, and each is scoped backwards from that artefact rather than forwards from a task list.

Two more sit alongside the eight and are frequently the real requirement behind an enquiry. NDT report validation is an independent technical review of inspection reports before they are issued, or after a client has challenged them — faster than a programme engagement and often the thing that was actually broken. Independent second opinions on disputed calls belong in the same category: one technical question, answered in writing, with the reasoning attached so it survives being forwarded.

The catalogue also has an edge, and it is worth stating. Where the honest answer is that no consultant is needed — the programme is sound, the finding is routine, the existing records already support the decision — that is the answer given. An engagement producing a document nobody uses is worse than no engagement at all, because it becomes a document an auditor will read and hold you to.

Written practice: the document everything else hangs from

The written practice is the root document. SNT-TC-1A requires the employer to prepare a written practice for qualifying and certifying its own NDT personnel, and requires that document to be on file and approved by the employer's Level III. Every certificate the company issues, every qualification decision and every examination score traces back to it. It is also, without exception, the first document a client or accreditation auditor asks to see when they walk in.

A defensible written practice states the methods and levels covered, training hours and documented experience by level and method, examination structure and passing criteria, near-vision and colour-contrast requirements, the recertification cycle, and records retention. Where it goes wrong is rarely omission — it is drift. A practice written against one edition, examinations run against another, and technicians qualified under rules the current document no longer contains. Candidates sitting Basic examinations after 1 January 2026 work to the 2024 editions of SNT-TC-1A and CP-189, which replaced the 2020 editions in ASNT's reference list.

Authoring is one document cycle; keeping it current is an annual review triggered by scheme changes, new methods, new contracts and new regions. Written practice development covers what goes into the document and how an employer formally adopts it. The regime it is written against, and what SNT-TC-1A does and does not require, is set out at the SNT-TC-1A compliance hub.

Procedure development and the demonstration that qualifies it

Procedures sit directly under the written practice, and a Level III approves them. ASME Section V Article 1 T-150 requires written procedures for the examinations it governs, and requires a revised procedure to be prepared and approved by a Level III whenever an essential variable changes. That clause is the reason procedure control fails quietly rather than loudly: a technique is adjusted in the field, an essential variable moves, and the procedure on file no longer describes what was actually done on the job.

Where the referencing code section requires it, a procedure is also demonstrated — run on representative geometry, controlled by a Level III, witnessed by the inspector, and documented. Most ASME sections require demonstration to the Authorized Inspector rather than formal qualification, and the distinction matters because the two generate different records. Procedures are written narrowly enough to be demonstrable and broadly enough to cover the work you actually sell, which is a drafting skill rather than a code lookup.

Multi-method programmes need this repeated per method and per technique. UT, PAUT, TOFD, RT including digital and computed radiography, MT, PT, VT and ET each carry their own essential variables and their own demonstration expectations. A procedure set assembled from mixed sources — some inherited from a previous employer, some copied from a client, some written in-house years ago — is the most common finding in a first client audit and the slowest to close.

Examination oversight: writing, administering, grading, retaining

SNT-TC-1A assigns the Level III responsibility for approving and grading the examinations administered for certification. In practice that means three artefacts: a question bank matched to the method and level being claimed, an answer key, and graded papers retained with scores, dates and invigilation records. Practical examinations add a specimen set with known indications and a recorded result against them, which is the part most often missing when a programme is inspected.

The examination record is where programmes fail an audit most often, and rarely because the examination itself was wrong. It fails because the papers were not retained, because the specific examination did not match the method or level claimed, or because the grading carries no signature behind it. An auditor is not assessing whether your technician can perform UT. They are assessing whether you can prove how you concluded that they could.

Examination oversight is scheduled against your qualification calendar rather than run continuously, which is exactly why it suits an outside arrangement. New hires, recertification cycles and new method additions cluster together; between clusters the workload does not justify a permanent appointment. Under SNT-TC-1A the recommended maximum recertification interval is five years across Levels I, II and III, which makes the calendar predictable enough to plan cover around.

Level III cover: retained, project and interim

Level III cover comes in three shapes, and choosing the wrong one is the usual source of friction later. Retained cover names a Level III of record continuously, sized to your qualification calendar and your procedure churn. Project cover attaches to a defined scope — a contract, a procedure set, a single facility — and ends when that scope does. Interim cover fills a hole that has already opened, and is judged on speed and on what it leaves behind.

Retained cover suits firms whose contracts require a named Level III at all times and whose demand is steady but low. Project cover suits EPCs and fabricators with a defined job and a defined end date. Interim cover suits a firm that has just lost its Level III and now cannot qualify a technician or approve a procedure until somebody is designated. Interim NDT Level 3 cover sets out how that gap is closed, how fast, and what the handover has to contain.

In every shape, the arrangement is documented in the employer's written practice. SNT-TC-1A permits an employer to engage an outside agency Level III for technical work provided the arrangement is written down. NAS 410 goes further: the employer identifies a Responsible Level 3 in writing to act on its behalf in qualification and certification matters, and that person may come from an outside agency. The full role is set out under ASNT Level III consulting services.

Programme build for a firm that has none

Firms starting an inspection capability from zero — a new NDT contractor, a fabricator bringing examination in-house, an operator building an owner-inspector function — need a programme designed in sequence rather than assembled as problems appear. The sequence is fixed: choose the regime, write the practice, define methods and levels, build the procedure set, establish training and experience records, then qualify the first technician against all of it.

Doing it in that order costs a fraction of retrofitting it. Doing it in reverse — hiring technicians, taking work, then discovering no document supports what was signed — is how firms end up requalifying people who were competent all along, because the evidence trail behind their qualification was never built. Competence and provable competence are different assets, and only one of them survives an audit or a client's supplier qualification questionnaire.

Programme build pairs naturally with getting people through the levels in the first place. NDT training covers the classroom and practical hours side, method by method; the programme side covers what those hours must be recorded against for the resulting certificate to mean anything to a customer. Building both together means the first cohort qualifies into a programme that already holds their records correctly, rather than into a filing gap discovered two years later.

Audit and gap assessment against the regime that will actually be applied

A gap assessment is an audit you commission against yourself, run against the regime that will actually be applied to you. That qualifier carries the weight: assessing a programme against SNT-TC-1A when the incoming client contract names CP-189 produces a clean report and a failed audit. CP-189 is an American National Standard written in shall; SNT-TC-1A is a recommended practice written in should. CP-189 also carries additional requirements for experience, examinations and record keeping.

The output is a findings list mapped to clause, owner and closure date — not a narrative report that reads well and changes nothing. Findings cluster in four places: written practice currency, procedure control, examination records, and vision test currency. Each has a different fix and a very different lead time. Knowing those lead times before an audit is announced is most of the value, because a missing vision test is a same-week fix and a missing examination paper is a requalification.

Programme audit and gap assessment covers the review itself and the closure support that follows it. Closure matters more than the finding: an audit that produces a list nobody works through leaves the programme exactly where it was, except that documentation now exists proving the firm knew. That is a worse position than never having run the assessment, which is why closure support is scoped into the engagement rather than sold separately.

Succession, and the gap that opens when a Level III leaves

When a named Level III leaves, existing certifications remain valid and the approving authority disappears. Until a replacement is designated in the written practice, no new technician can be qualified and no procedure can be approved or revised. Work continues normally until the first procedure change or the first new hire — and then it stops, usually on a week when a client is waiting and nobody has time to run a recruitment process properly.

Succession planning removes that cliff. A named deputy, an overlap period, a transferred record set and a documented handover convert a resignation into an administrative change. The handover pack is the part that gets skipped: examination question banks, procedure revision history, demonstration records and the reasoning behind non-obvious technique decisions all live in one person's head until somebody sits down and writes them out.

Where the departure has already happened, interim cover closes the gap while recruitment runs, and the interim Level III builds the handover pack the permanent appointment will inherit. That sequencing matters more than it looks: an interim engagement that leaves nothing behind recreates the identical cliff eighteen months later, with the same client, the same procedure queue and the same week of lost work.

The method scope constraint that decides who can sign what

Level III certification is granted per method, and authority is bounded by the methods held. A Level III certified in UT and MT can approve UT and MT procedures and grade UT and MT examinations. That signature does not extend to RT or ET, however senior the individual or however long they have worked in the industry. Programmes selling six methods need six methods covered, whether by one person holding all six or several holding a few each.

This is the constraint that quietly invalidates arrangements. A firm engages a Level III, adds a method eighteen months later, and the new method's procedures carry a signature that does not cover them. Every scope statement should list the methods in scope, the regime under which each was certified, and the expiry date. ASNT NDT Level III certifications are renewed on a five-year cycle, either through documented recertification points or by re-examination in each method held.

The regime layer sits above the method layer. SNT-TC-1A and CP-189 are employer-based: your company certifies its own people against your own written practice. ISO 9712 inverts that — an accredited body examines and certifies the individual, and the certificate travels with that person between employers. Many inspectors hold both, SNT-TC-1A for US work and ISO 9712 for international mobility. A programme mixing the two without saying so is the finding an auditor writes first.

How an engagement starts

An engagement starts with a scoping call that establishes four things: the artefact you need at the end, the date somebody is waiting for it, the regime your customer contract names, and the methods in scope. Those four determine everything downstream — delivery model, sequence, and which of your existing records can be reused rather than rebuilt from scratch. Firms consistently underestimate how much of their existing evidence is usable once someone knows what to look for.

Most documentation work runs remotely. Written practice authoring, procedure development, examination banks and gap assessment need your documents and your answers, not a site visit. Site presence is reserved for what genuinely requires it: technique demonstrations on representative geometry, practical examinations, and audit attendance. That split keeps engagements lean regardless of where the facility sits, and keeps the schedule driven by your calendar rather than by travel.

Affordable, accessible, fully customizable — and scoped in writing before anything begins. Start with a scoping conversation; demo and quote on request. Bring the contract clause that triggered the enquiry if there is one, because the clause usually names the regime, the methods and the acceptance standard, and settles half the scoping questions before the call has ended.

What engagements does the consulting practice cover?

Written practice authoring and revision, procedure development and demonstration, examination question banks and grading, retained Level III cover, interim cover after a resignation, programme audit and gap assessment, full programme build for a firm starting from zero, and planned succession before a named Level III leaves. Report validation and independent second opinions on disputed calls sit alongside these.

Which certification regimes does Atlantis work across?

ASNT SNT-TC-1A and ANSI/ASNT CP-189 for employer-based US industrial work, NAS 410 and EN 4179 for aerospace and Nadcap-accredited suppliers, and ISO 9712 where a customer requires third-party certification held by the individual. The customer contract selects the regime. Programmes that quietly mix two are the most common finding in a first audit.

Who decides which regime applies to us?

Your customer, through the contract and the purchase order. Aerospace primes and Nadcap accreditation invoke NAS 410 or EN 4179. Contracts naming CP-189 impose mandatory requirements rather than recommendations. Absent an explicit clause, SNT-TC-1A employer-based certification is the default across US industrial work. Declare the choice in the written practice and apply it consistently.

What is the method scope constraint?

A Level III is certified method by method, so authority is bounded by method. A Level III certified in UT and MT approves UT and MT procedures and grades UT and MT examinations, and cannot extend that signature to RT or ET. Programmes covering six methods need those six methods covered by certification, whether by one person or several.

Can a consultant certify our technicians?

No. Under SNT-TC-1A certification is an act of the employer and does not transfer to an agency, even when the agency writes the practice, sets the exams, grades the papers and approves every procedure. The consultant produces and signs the technical work. Your company signs the certificate, holds the training and experience records, and answers to the auditor.

How does an engagement actually start?

With a scoping call that names the artefact you need at the end and the date somebody is waiting for it. From there the regime, the methods in scope, the delivery model and the record set you already hold are established, and a written scope follows. Demo and quote on request; no engagement begins before the deliverable is written down.

Frequently asked

Can an outside consultant certify our NDT technicians?

No. Under SNT-TC-1A, certification is an act of the employer and cannot be transferred to an agency. An outside Level III authors the written practice, prepares and grades examinations, approves procedures and provides method oversight — the entire technical chain. Your company signs the certificate, holds the training and experience records, arranges the vision examinations and retains everything for audit. Auditors ask the employer to produce that evidence, never the consultant.

Which standard should our written practice be written against?

Whichever one your customer contracts name. Aerospace and Nadcap-accredited work invokes NAS 410 or EN 4179. Contracts specifying ANSI/ASNT CP-189 impose a standard written in mandatory language, with additional requirements for experience, examinations and record keeping. Absent an explicit clause, SNT-TC-1A employer-based certification is the default across US industrial work. Declare the choice explicitly in the document and apply it consistently — mixed programmes are the finding auditors write first.

How quickly can a written practice or a procedure be turned around?

Turnaround is driven by how complete your inputs are, not by the drafting. A procedure written against a code you can name, for a geometry you can describe, with acceptance criteria already fixed by contract, moves fast. A written practice for a firm that has to first decide its regime, its methods and its levels takes a cycle of decisions before drafting starts. Site-dependent work — demonstrations, practical examinations — schedules around access.

Do you work outside the United States?

Yes. The United States is the primary market, and engagements run across other Western markets on the same basis. Documentation work is regime-specific rather than location-specific: SNT-TC-1A and CP-189 travel with US contracts, NAS 410 and EN 4179 with aerospace supply chains, ISO 9712 where a customer requires third-party certification. Remote delivery covers most of the work; site presence is scheduled where demonstrations, practical examinations or audit attendance require it.

What do you need from us to start?

The trigger — an audit notice, a contract clause, a resignation, a rejected procedure. Your current written practice if one exists, the methods you perform, the codes your work is governed by, and the customer specification that prompted the enquiry. That is enough to name which of the eight engagements you have and to write a scope. Nothing begins before the deliverable and the date are written down and agreed.

Find NDT Level III Consulting by state, province or country

Each page covers the local industries, the regulators and codes that apply there, the cities we support and how Atlantis NDT works with employers in that region.

United States

Canada

AE

Australia

DK

IE

PL

SE

No outside consultant can certify your technicians — under ASNT SNT-TC-1A, certification is employer-based. An outsourced ASNT Level III does everything up to that line: authors the Written Practice, prepares and grades general, specific and practical examinations, approves NDT procedures, and provides multi-method technical oversight. The employer signs the certificate and holds the record.

NDT consulting engagements fall into five recurring problems. The programme problem: an inspection function that grew job by job and now faces a client audit with no coherent Written Practice and procedures of mixed parentage. The authority problem: work requiring an ASNT Level III signature — procedure approval, personnel qualification — with no Level III on staff. The interval problem: equipment on default inspection intervals that risk-based inspection to API 580 and API 581 would rationalise in both directions. The verdict problem: a finding needing an engineering disposition through fitness-for-service to API 579-1/ASME FFS-1 rather than an automatic repair. The build problem: a new facility or contract needing inspection capability designed before day one. Scope every engagement from the artefact produced at the end — an audit-ready Written Practice, an approved procedure set, an RBI programme a regulator accepts, or an FFS assessment carrying a signed run-or-repair decision.

Source: ASNT SNT-TC-1A (2024 edition) and ANSI/ASNT CP-189 for employer-based certification; ISO 9712 for third-party certification; API 580 and API 581 for risk-based inspection; API 579-1/ASME FFS-1 for fitness-for-service.

Technically reviewed by Anoop Rayavarapu — ASNT NDT Level III (UT, RT, MT, PT, VT, ET) · API 653 · ISO 9001:2015 Lead Auditor
What a contracted ASNT Level III can and cannot do — SNT-TC-1A versus ISO 9712
ActivityContracted outside Level III (SNT-TC-1A / CP-189)Third-party certification body (ISO 9712 / PCN / CSWIP)Who holds the record
Author the Written PracticeYes — drafted for the employer to review and adoptNot applicable; the scheme document takes its placeEmployer
Prepare and grade qualification examinationsYes — general, specific and practical examinationsBody sets and administers its own central examinationsEmployer / certification body
Approve NDT proceduresYes — acting as the employer's designated Level IIIOutside the scope of the certification schemeEmployer
Issue the certification itselfNo — certification is an act of the employer and cannot be delegatedYes — certificate issued to the individual, portable between employersEmployer / certification body
Near-vision and colour-contrast examinationSpecifies the requirement; the employer arranges and records the examinationRequired by the scheme before examinationEmployer / certification body
Recertification decision and records retentionAdvises and evaluates; cannot decide on the employer's behalfBody manages renewal on its own published cycleEmployer / certification body
Under ASNT SNT-TC-1A certification is employer-based: the employer certifies its own personnel and cannot transfer that act to an agency, even when the agency performs all of the technical work. ISO 9712 inverts this — an accredited body certifies the individual, and the certificate travels with the person. This is the single most misunderstood boundary in Level III consulting.

Can we use an outside agency Level III instead of employing one?

Yes. SNT-TC-1A allows an employer to engage an outside agency ASNT Level III for the technical work — Written Practice authoring, examination preparation and grading, procedure approval and method oversight — provided the arrangement is documented in the employer's Written Practice. Responsibility for certifying personnel remains with the employer and does not transfer to the agency.

What responsibilities stay with the employer when the Level III is outsourced?

The employer adopts and maintains the Written Practice, holds training and documented experience records, arranges near-vision and colour-contrast examinations, issues the certificate, decides recertification, and retains the records for audit. A consultant produces and signs the technical work; the employer's name is on the certification. Auditors ask the employer, not the consultant, to produce that evidence.

How is ISO 9712 certification different from ASNT SNT-TC-1A?

SNT-TC-1A is a recommended practice for employer-based certification: the employer certifies its own personnel against its own Written Practice. ISO 9712 is third-party certification — an accredited certification body examines and certifies the individual, and the certificate travels with that person between employers. Many inspectors hold both: SNT-TC-1A for US work, ISO 9712 for international mobility.

When is fitness-for-service to API 579 the right answer instead of repair?

When a finding sits within a known damage mechanism and the real question is run, repair or re-rate rather than automatic replacement. API 579-1/ASME FFS-1 covers general and localised metal loss, pitting, blisters and HIC/SOHIC, crack-like flaws, creep and fire damage at Levels 1, 2 and 3. It needs the structured inspection record — thickness profiles and flaw dimensions — not a PDF.

How does risk-based inspection under API 580 and API 581 change intervals?

RBI replaces fixed intervals with intervals derived from probability and consequence of failure, mapped to credible damage mechanisms per API 571 and calibrated by inspection effectiveness. Intervals move in both directions — extending on low-consequence equipment, shortening where a mechanism is active and prior inspection was ineffective. What an auditor accepts is the documented basis, not the interval alone.

What is a Written Practice, and who is required to have one?

A Written Practice is the employer's own document describing how it trains, examines, qualifies and certifies NDT personnel: methods, levels, training hours, experience requirements, examination content, vision requirements, recertification and records retention. Under SNT-TC-1A every employer certifying its own NDT personnel needs one, and it is normally the first document a client or accreditation auditor requests.

What NDT consulting engagements actually look like

Most consulting enquiries arrive as one of five problems. The programme problem: an inspection function that grew job by job and now cannot pass the audit its biggest client just announced — no coherent Written Practice, procedures of mixed parentage, records scattered. The authority problem: work that requires an ASNT Level III signature — procedure approval, personnel qualification — with no Level III on staff. The interval problem: equipment running on default inspection intervals that a risk-based approach per API 580/581 would rationalise, in both directions. The verdict problem: a finding that needs an engineering disposition — fitness-for-service per API 579 — rather than an automatic repair. The build problem: a new facility, product line or contract that needs inspection capability designed before day one, not retrofitted after the first nonconformance.

How engagement works

Consulting is scoped from the artefact you need at the end: an audit-ready Written Practice, an approved procedure set, a qualified crew, an RBI programme with intervals a regulator will accept, an FFS assessment with a run/repair decision an engineer signed. We state what we will examine, what we will produce, and what remains your side — typically the operational records only you hold. Remote review handles most documentation work; site presence is reserved for what genuinely requires it, which keeps the engagement lean regardless of geography.

Choosing the right service line

If the trigger is an audit or a contract requirement, start with outsourced Level III services — the Written Practice and personnel qualification usually sit at the root. If the trigger is inspection cost or interval pressure, start with RBI programme design. If the trigger is a specific finding, go straight to fitness-for-service assessment. Unsure is also an answer — describe the situation and we will tell you plainly which of the five problems it is, including when the honest advice is that you do not need a consultant.

Deciding how to resource inspection at all? building an in-house NDT team versus contracting it out sets out the volume threshold and the obligations each route carries. If you are selecting a contractor, what actually predicts contractor quality.

Related reading

Where Level III consulting sits in this list

The consulting practice spans RBI programme design, fitness-for-service assessment under API 579, code consulting and procedure development. The single most requested engagement is different from all of them: acting as the named ASNT Level III for a company that does not employ one. That has its own page — NDT Level 3 consulting services — because the commitment, the deliverables and the audit exposure are unlike a project-scoped consulting job.

Consulting by industry

Programme problems are sector-shaped — the regime, the damage mechanisms, the auditor. The practice by industry: Maritime & Shipbuilding · Aerospace Manufacturing · Aviation MRO · Nuclear · Oil & Gas.

Consulting by region

Regional pages group the markets and set out how certification and programme requirements differ across them: Gulf Coast · Rockies & Plains · Texas Inland · Canada.