Affordable NDT ERP in Carson — Fully Customizable, All Business Apps Included

Atlantis NDT ERP — affordable, accessible, fully customizable. All integrated business apps included out-of-the-box. Built for Carson inspection companies: ASNT NDT + ISO 9712 + API ICP + AWS CWI + NACE CIP dual-scheme certification tracking, work orders + dispatch, calibration management with NIST/NPL traceability, invoicing + multi-currency accounting, CRM + sales pipeline, payroll + HR, document control per ISO 9001 + 17020 + 17025, mobile + offline field capture, audit-ready records.

Modules + Features for Carson Inspection Companies

pre-configured modules: inspector cert tracking (ASNT + ISO 9712 + API ICP + AWS CWI + NACE CIP + CSWIP + PCN + ASNT 9712 (formerly ACCP) + NAS 410 + EN 4179 aerospace + JSNDI/KSNT/AINDT/ABENDI/ISNT regional schemes), equipment + calibration cert tracking (NIST + UKAS + NPL + PTB + BAM traceability), work-order management + dispatch, field-service mobile + offline app, customer + supplier management, inspection report generation (per ASME V + API 510/570/653 + IACS Marine + custom-client formats), document control + procedure library + Level III sign-off workflow, audit-trail recording, multi-currency invoicing + accounting, payroll + HR + time-sheet + project management + fleet management + CRM + e-commerce B2B portal.

Code + Compliance Framework

Audit-defensible records per ISO 9001:2015 + ISO 17020 (inspection body) + ISO 17025 (calibration laboratory) + ISO 17024 (personnel cert body). Every inspection, procedure revision, inspector cert and calibration cert is timestamped with reviewer approval recorded. ASME B&PV V + VIII + IX + XI; ASME B31.1/3/4/8/12 piping; API 510 + 570 + 571 + 653 + 936 + 1169; NACE MR0175 + MR0103 sour-service; ASTM E-series; ISO 17635/17636/17640; EN 13445/13480; IACS Rec-20 marine. Dual-scheme cert (ASNT + ISO 9712) for global mobility.

Integrations

Atlantis ERP has an open REST API, so it connects to SAP, Maximo, NetSuite or any other system that accepts API connections; each integration is scoped with you during implementation. Cloud SaaS + multi-tenant or single-tenant on-prem options for highly regulated customers (defense, nuclear).

Free Consultation + Tailored Quote in Carson

Atlantis NDT publishes no pricing — pricing varies by region, team size, module scope, integration depth. Request your free 30-minute consultation with Atlantis NDT founder Anoop Rayavarapu (ASNT NDT Level III in UT, RT, MT, PT and VT). Output: tailored scoping + module map + integration scope + implementation timeline + tailored quote. Affordable, accessible, fully customizable. See also Atlantis NDT ERP hub, ASNT Level III consulting, ISO 9001 and ISO 14001 quality system.

Carson: an active refining giant standing next to a refinery being torn down

Carson hosts Marathon's Los Angeles Refinery, a two-site complex spanning both Carson and Wilmington that has been reported as a single operating entity for years and stands as the largest crude-processing complex on the West Coast by throughput. The plant is actively pursuing modernization work and is moving permit applications for further projects through the South Coast Air Quality Management District, which is not the posture of a facility winding down.

A short distance away, inside the same city, sits a second Los Angeles-area refinery — formerly run by a separate Houston-based integrated refiner, now shut down and in the hands of real-estate developers evaluating commercial and industrial redevelopment of the site, with groundwater remediation still ongoing beneath it from contamination going back decades. Carson is therefore running two entirely different asset lifecycles at once: an active refinery pursuing growth projects, and a shuttered one being prepared for demolition and reuse.

That duality is a genuine operational split for an inspection company. Marathon's side calls for the usual refinery discipline — API pressure-equipment and piping programs, ASME Section V examination, turnaround scheduling. The shuttered site's side calls for something else entirely: structural condition assessment ahead of deconstruction, verification that tanks and vessels have been properly purged and degassed before demolition crews touch them, and inspection scope tied to a redevelopment timeline rather than a refining calendar.

The broader lesson from Carson is that a city can stop being a single market the moment one of its two anchor plants changes state. A company that built its Carson account plan two years ago, when both sites were operating refineries, is now serving a market that is half turnaround work and half demolition-adjacent verification — and those two halves are billed, staffed and reported on completely differently. Inspection companies that keep the two workstreams in one undifferentiated pipeline will misprice one or both; the ones that model them as separate lines of business, sharing a city but not a client relationship, price both correctly.

Carson is the crude-processing half of Marathon's Los Angeles Refinery, the largest refinery on the West Coast at roughly 365,000 barrels per calendar day, which Marathon merged with its Wilmington site into one operation in 2019. An NDT ERP serving this market has to carry the evidence those operators audit against — Cal/OSHA Process Safety Management for Refineries (8 CCR §5189.1), OSHA PSM 29 CFR 1910.

The 425-MW Watson Cogeneration Plant sits on 21.7 acres alongside it supplying refinery steam and power. Air Products runs a hydrogen plant on Alameda Street feeding refinery hydrotreaters by pipeline, and Kinder Morgan operates crude and product storage here. Phillips 66's 235-acre Carson site stopped refining in late 2025, so demand now splits between live FCC, coker and alkylation service and decommissioning across a 650-acre Carson-Wilmington footprint. Operators including Marathon Los Angeles Refinery (Carson crude site), Phillips 66 Carson site (refining ceased Q4 2025), Watson Cogeneration Plant set the pre-qualification bar their contractors inherit. The system of record for that evidence is the ERP, not a spreadsheet a technician maintains between jobs.

Source: Per-city industrial and compliance research file; ASNT SNT-TC-1A employer certification framework

NDT ERP in Carson — what the system has to evidence
FactorWhat appliesWhy it matters
Sectors servedPetroleum refining, Bulk fuel terminals and pipeline logistics, Industrial gases and hydrogen production, Cogeneration and industrial power, Refinery decommissioning and demolitionSets which methods, report formats and codes the system must handle
Codes audited againstCal/OSHA Process Safety Management for Refineries (8 CCR §5189.1), OSHA PSM 29 CFR 1910.119, API 510 / 570 / 653, NBIC NB-23, ASME Section VIII Div 1 and B31.3Each demands retrievable evidence, not a claim of compliance
What must be retrievable on demandTechnician certification currency · equipment calibration status · the report against the asset that generated itThese three are what an auditor asks for first
DeploymentCloud or on-premise · configured to the codes above · offline field captureField crews lose connectivity; the record cannot depend on it

What must an NDT ERP track for inspection firms in Carson?

Evidence against Cal/OSHA Process Safety Management for Refineries (8 CCR §5189.1), OSHA PSM 29 CFR 1910.119, API 510 / 570 / 653, NBIC NB-23, ASME Section VIII Div 1 and B31.3. That means each technician's certification currency by method and level, each instrument's calibration status on the day it was used, and every inspection report bound to the asset and the job that produced it. An auditor asks for those three before anything else.

Can an inspection company in Carson run this alongside its existing accounting?

Yes. The ERP owns operations — jobs, technicians, equipment, reports — and pushes finished invoices to the accounting system, which keeps the chart of accounts, tax and reconciliation. For US firms that usually means QuickBooks; the split is documented in the QuickBooks integration guide rather than forcing a migration nobody asked for.

Does it work offline for field crews in Carson?

Yes. Field capture runs offline and syncs when the device reconnects, because turnaround decks, tank interiors and remote sites have no usable signal and a record that depends on connectivity is a record that gets rewritten from memory hours later. Offline capture is the difference between a contemporaneous record and a reconstruction.

How long does implementation take for a firm in Carson?

The configuration follows the codes and workflows above rather than a fixed template, so the timeline is set by how much existing data has to be migrated and cleaned — certification records and calibration history are the two that consume the time. Firms usually run the first job cycle in parallel before cutting over.

What happens to inspection records if a technician leaves?

They stay with the asset and the job, which is the point. Employer-based certification ends when the holder leaves, but the reports they signed remain part of the asset's inspection history and are still auditable. A system that stores records per technician rather than per asset loses that history on every departure.

Related: the NDT ERP overview, personnel certification tracking, equipment calibration tracking, QuickBooks integration and the RFP requirements checklist. Firms preparing for an audit should also read the NDT programme gap assessment.

NDT ERP software for inspection companies working in Carson

The right NDT ERP for a Carson inspection company is one that can run two very different kinds of work out of the same office: live refinery turnaround and on-stream work at Marathon's Los Angeles Refinery, and preservation, layup and pre-demolition verification at the Phillips 66 site, which stopped fuel production in the fourth quarter of 2025. The Atlantis ERP solution is set up for exactly that split, with separate job types, quotation templates and cost centres per line of work, and a single record of technicians, instruments and reports underneath.

Most small NDT companies in the South Bay run on a stack that grew one problem at a time: a quoting spreadsheet, a whiteboard or shared calendar for crew dispatch, a folder of certificate PDFs, a calibration log kept by whoever owns the van, and an accounting package that only finds out about a job when someone types the invoice. That works until a client auditor asks which UT instrument was on a given report, whether the technician's Level II was current on that date, and which procedure revision they worked to. The Atlantis ERP answers those three questions from the job record itself, because the report, the technician, the instrument serial number and the procedure reference are captured together when the work is done, not reconstructed afterwards.

This section goes deeper than the overview above. It walks through how each part of the system maps to real Carson work, what is built in, what gets configured during implementation, and where the companion products fit. If you would rather see it on your own data, ask for a demo scoped to your Carson work.

Carson now has two refinery lifecycles, and your software has to price them differently

Phillips 66 has said it began idling its Los Angeles refinery facilities in Carson and Wilmington in late 2025, that full idling of all units would run over the following months, and that it intends to keep operating permits in place and hold units in a safe, clean and well-maintained state while it pursues redevelopment approvals for both properties. For an inspection contractor that is not a lost customer, it is a different customer. Layup condition checks, verification that vessels and tanks are properly isolated and cleaned, structural condition surveys ahead of deconstruction, and baseline documentation for redevelopment are all real scopes, but they are billed, staffed and reported differently from a turnaround.

Inside the Atlantis ERP you model that with project records. Each project carries an NDT job type, site, client PO, contract, the methods and codes in scope, acceptance criteria, assigned equipment and technicians, job status, and the safety induction and work permit fields a refinery gate expects. You can set up one job type for turnaround and on-stream work and another for preservation and decommissioning support, each with its own quotation layout and cost centre. The financial dashboard then shows revenue, cost of sales and gross margin for each stream, so you can see whether the preservation work is actually paying for itself instead of guessing at year end.

  • Turnaround and on-stream work: short mobilisation windows, large crews, many methods on one job, heavy overtime.
  • Preservation and layup work: smaller crews on longer, lower-intensity schedules, with visual and thickness scopes and a lot of photographic evidence.
  • Pre-demolition verification: structural condition and isolation checks tied to a redevelopment timeline rather than a refining calendar.

Technician certification tracking software for Carson crews

Technician certification tracking in the Atlantis ERP is built in, not a spreadsheet bolted on. Every certification is a record with its scheme (SNT-TC-1A, CP-189, ISO 9712, PCN, CSWIP or other), level from trainee through Level III, method, certifying body, issue, expiry and renewal dates, industry sector, OJT hours, training hours, exam result and attachments. Status is computed automatically as active, expiring soon (inside 90 days), expired or revoked, and there are dedicated Expiring Soon and Expired menus so nobody has to filter a list by hand.

Vision tests are tracked the same way: near vision (Jaeger J1 or J2), far vision, colour perception and contrast, with examiner, clinic, certificate file and expiry. Examination sheets record general, specific and practical scores against a passing score that defaults to 70 percent, and certificate templates per scheme hold the validity period in months, whether a vision test or exam is required, and minimum OJT and training hours. That matters when you run a written practice under SNT-TC-1A and a client's auditor wants to see that your Level II MT tech actually met your own documented hours.

The employee NDT profile carries the technician flag, highest level, methods certified, radiation safety training, radiation badge number and medical fitness expiry. Daily checks create warning tasks 90 days before a certificate or vision test runs out, and configurable email alerts go to whoever you choose, with look-ahead days and resend intervals you set. The detail that saves you on a refinery job: timesheets warn when a technician's certificate is not valid, so an expired cert gets caught when hours are logged, not three weeks later when the client's QA rejects the report package.

Calibration management software for UT, PAUT and RT equipment

Calibration management is handled in the Asset Management app, which tracks every instrument, probe and source-related item by serial number. Each record holds equipment type, assigned person, condition, asset tag, firmware, accessories, lifecycle state (new, active, in calibration, in repair, rented out, retired, disposed), calibration frequency and status. Rental rates can be recorded, which is useful for the Carson companies that rent out flaw detectors and PAUT sets between their own jobs.

Calibration records carry the provider, certificate number, standard, range, uncertainty, whether the lab is accredited, the result (pass, fail or conditional) and the next due date. A separate calibration certificate register stores the lab accreditation number, valid, expiring or expired status, the PDF, and expiry alerts. When a dispatcher assigns an instrument that is out of calibration to a job, the system warns them before the crew leaves the yard.

Equipment moves through an issue and return workflow with supervisor and manager approval, and the condition is recorded at issue and at return. Reservations prevent two jobs claiming the same serial number, and every inbound and outbound movement is logged. The maintenance log covers preventive, corrective, repair, cleaning, firmware update and probe replacement entries with condition before and after. Consumables such as couplant, penetrant and developer, magnetic particle media, PPE and stationery have reorder levels and a low-stock flag, which stops the classic turnaround failure of a crew arriving on night shift with no developer.

Crew dispatch and scheduling software for refinery turnarounds

Crew dispatch in the Atlantis ERP runs through Team Assignments. Each job moves from planned to dispatched to in field to submitted to closed, with the site's GPS coordinates and mobilisation and demobilisation dates on the record. You work in calendar, kanban or list views, whichever your dispatcher prefers.

The technician availability calendar holds assigned, leave, training, sick and unavailable entries, and overlaps are blocked. Double-booking of a technician or of an equipment serial number is blocked too. For each person you can see status, current assignment, utilisation percentage and next available date, which is exactly what you need at 6 p.m. when a Carson unit supervisor calls for two more UT techs on the morning shift. Time Off feeds the same availability calendar, so approved leave shows up in dispatch without anyone re-entering it.

California adds a payroll wrinkle that out-of-state contractors often underestimate: overtime is triggered by hours in a workday, not just hours in a week. Timesheets in the Atlantis ERP record work type (inspection, travel, standby, setup), method, billable flag, rate multiplier, site, client and equipment serial, with approval. The rate multiplier is how you carry overtime and premium time from the timesheet into billing, and the exact payroll rules are configured during implementation to match your California obligations.

NDT reporting software built into the ERP

The Atlantis ERP includes NDT reporting as a built-in app, and the same engine sits behind the standalone Digital Twin Reporting Software. It covers 17 report types, each with its own numbering sequence: UT, RT, MT, PT, VT, ECT, IRIS, PAUT, MFL, TOFD, PWHT, PMI, hardness, UT thickness, ferrite, holiday/coating and computed radiography.

The data is method-specific rather than a generic form with a comments box. UT reports carry a probe calibration table. RT reports carry source, technique, IQI type and placement. MT captures technique and particle type, PT captures method and developer, PAUT carries focal laws, MFL carries scan mode and item lines, and UT thickness captures readings by direction. Weld and job lines record defect type and orientation, and every report closes with an overall result of acceptable, not acceptable, or acceptable with remarks. Work order, request, WPS, contract, drawing numbers, procedure and standard references are all captured on the report.

Reports move from draft to in progress to review to approved to sent, with inspector, reviewer and approver signatures and a field for a third-party or authorized inspector's name and signature. Company templates are versioned in Excel, Word, PDF or HTML with your logo, header and footer, and Excel templates fill automatically by mapping fields to cells, so a Carson client that insists on its own spreadsheet format still gets it without anyone retyping. The offline field app installs as a web app, works without signal inside a tank or on a congested pipe rack, stores drafts and photos locally, captures an on-screen signature, previews the PDF and syncs when the device is back in range.

Marine inspection reports for the port side of the South Bay

Carson sits a few miles from the Port of Los Angeles and the Port of Long Beach, and plenty of South Bay NDT companies take vessel, barge and marine terminal work between refinery jobs. The reporting app has a marine mode for that. It adds a vessel cover page and photo, the inspection location and dates, and on PDF output it merges the classification-society certificate from a built-in library (DNV, ABS, Lloyd's Register, BV, RINA, IRS, ClassNK), the inspector's Level II certificate and the calibration certificate for the instrument used. Inspection photos are laid out in a 2-up grid.

The practical gain is that a surveyor receives one PDF that already contains the evidence they would otherwise email you to ask for. For a small company doing a handful of marine jobs a month, that is the difference between invoicing on completion and chasing paperwork for a week.

Procedure control that a Level III can defend at audit

Written procedures are where many small companies are weakest, because the approved revision lives in someone's inbox. The Procedures app keeps a register with document number, revision, method (UT, RT, MT, PT, VT, ET, TOFD, PAUT, LT, AE, hardness, PMI, CR, DR and more), scope, material, applicable standard such as ASME Section V, acceptance criteria, and either the body text or an uploaded file.

Each procedure runs through draft, submitted, reviewed, approved and published, with rejected and archived states and a recorded reason for any rejection. Prepared-by, reviewed-by and approved-by are stored with dates, approved revisions are locked, and a snapshot of every revision is kept, so you can show exactly what the procedure said on the day a report was written. Approvers get email notifications and reminders for pending approvals. There is also an AI-assisted first draft that falls back to a built-in template when needed; it saves typing, but a Level III still reviews and approves every procedure before it is used.

NDT quoting and invoicing software that follows the job

Quotations carry the job type, site, project dates and applicable codes, a global discount, and NDT service products flagged with method and category. The PDF is branded to your company, and clients can accept and sign online, after which the quote converts to a sales order. That suits refinery procurement desks that want a clean, signed scope before a PO number is issued.

Invoices carry the NDT project, job or PO number, site, invoice type and industry sector, with subtotals for labour, equipment and consumables. Lines hold cost centre, method, equipment serial, technician, rate type and days or hours, and billable timesheet hours with their rate multiplier feed straight into billing. Payments, reminders and taxes are configured per country and state during implementation. Field expenses and per diems logged in Expenses can be re-billed to the job, and the financial dashboard gives a 12-month view of revenue, cost of sales, gross margin, operating expenses, EBITDA, outstanding invoices, bills and expenses. Quote on request; tell us your headcount and methods and we will scope it.

Spreadsheets vs generic ERP vs the Atlantis ERP for a Carson NDT company

NeedSpreadsheets and shared foldersGeneric ERPAtlantis ERP solution
Technician certs by scheme, level and methodManual list, easy to miss an expiryUsually a custom field or add-onBuilt in, with auto status, 90-day warnings and timesheet check
Vision tests and exam scoresScanned filesNot modelledBuilt in, with Jaeger, colour and exam scores
Instrument calibration and issue/returnVan logbookGeneric asset registerSerial-level records, calibration register, dispatch warning
Double-booking of techs and instrumentsCaught on the day, if at allDepends on configurationBlocked
Method-specific NDT reportsWord templatesNot included17 report types with approval workflow and offline app
Procedure revision controlEmail and file namesGeneric document storeRegister with approval workflow and revision snapshots
Invoicing tied to technician and equipmentTyped from timesheetsPossible with customisationLines carry method, serial, technician and rate type

Integrations, dashboards and the rest of the stack

The Atlantis ERP has an open REST API and integrates with SAP, Maximo, NetSuite, QuickBooks or any system that accepts API connections, with each integration scoped during implementation. A separate REST API serves field devices: jobs assigned to the technician, equipment issued to them, report submission and sync.

Dashboards give you NDT KPIs such as equipment calibration due and overdue, certificates expiring and expired, and issued equipment that is overdue for return, alongside the financial dashboard. Company certifications, such as your ISO registration and other accreditations, sit in the same system with their own alert days. Fleet records note whether a vehicle can carry radioactive sources, the transport licence number and expiry, and assignment to project and driver with dates and mileage, which is useful for any Carson RT contractor running source trucks between refinery gates.

On the sales side, the CRM records service line, lead source, NDT service type, industry sector, site country and estimated technicians and days, with an NDT lead score from 0 to 100. Leads import from CSV, business cards can be photographed and turned into leads, and AI marketing tools draft campaign emails and drip sequences that can run on your own server. For asset owners who want inspection data in 3D, Atlantis Digital Twins maps indications and damage onto the model and trends thickness and remaining life, and technicians can practise on the Practical NDT 3D simulator. Browse every module on the ERP apps page.

How a Carson implementation usually runs

Implementation starts with the part of your operation that hurts most, which for most South Bay contractors is certification and calibration evidence, because that is what a refinery pre-qualification audit hits first. We load your technicians, certificates, vision tests and instrument register, set your alert recipients, and connect Team Assignments so dispatch starts checking both automatically.

Reporting comes next: your existing report layouts become versioned templates, Excel formats that clients insist on are mapped field to cell, and the offline field app goes onto technicians' phones and tablets. Quotations, invoicing, cost centres and the job types for turnaround and preservation work follow, and any integration to accounting or a client system is scoped and built last, once the data it depends on is clean. Anoop Rayavarapu, ASNT NDT Level III and founder of Atlantis NDT, reviews the NDT-specific configuration so it reflects how inspection work actually runs. To start, book a scoping call.

Frequently asked questions

What is the best NDT software for a small inspection company in Carson?

The best choice for a small Carson company is one system that holds certifications, calibration, dispatch, reports and invoicing together, rather than five tools. The Atlantis ERP solution does that, is affordable and fully customizable, and is sized to your team with a quote on request.

Can the ERP separate turnaround work from preservation and decommissioning work?

Yes. You set up separate job types, quotation templates and cost centres, and the financial dashboard reports revenue and margin for each, so you can see which line is profitable.

Does it stop an out-of-calibration instrument going to a refinery job?

It warns the dispatcher when assigned equipment is out of calibration, blocks double-booking of the same serial number, and the calibration register shows valid, expiring and expired certificates with alerts.

Can it handle California daily overtime on timesheets?

Timesheets carry work type, billable flag and a rate multiplier that feeds billing, and your specific California payroll rules are configured during implementation.

Does the NDT reporting software work inside a tank with no signal?

Yes. The field app is an installable web app that stores drafts and photos locally, captures signatures, previews the PDF and syncs when the device reconnects.

Does Atlantis offer NDT training for Carson technicians?

Atlantis offers ASNT SNT-TC-1A-based NDT training, and the ERP's eLearning portal can host Level I, II and III course content. The ERP can record other certificates your technicians hold, such as CP-189, ISO 9712, PCN or CSWIP.

Can it connect to our accounting system or a client's maintenance system?

Yes. The open REST API integrates with QuickBooks, NetSuite, SAP, Maximo or any system that accepts API connections, scoped during implementation.