Inspection Management Software for Wood River
Wood River sits opposite the Phillips 66 Wood River Refinery in adjacent Roxana, a 345,000 bpd plant on the east bank of the Mississippi about 15 miles north of St. Louis. It runs crude and vacuum distillation, naphtha reforming, FCC, alkylation, hydrocracking, hydrodesulphurisation and delayed coking, and Phillips 66 consolidated full ownership out of the WRB Refining joint venture with Cenovus from October 2025. The surrounding tank farms make Wood River-Patoka one of the Midwest's principal crude delivery hubs, so tank bottom and pipeline integrity work is continuous. Olin's Winchester plant at East Alton is the other large employer; Alton Steel ceased operations in January 2026.
Wood River sits opposite the Phillips 66 Wood River Refinery in adjacent Roxana, a 345,000 bpd plant on the east bank of the Mississippi about 15 miles north of St. Louis. An NDT ERP serving this market has to carry the evidence those operators audit against — OSHA PSM 29 CFR 1910.
It runs crude and vacuum distillation, naphtha reforming, FCC, alkylation, hydrocracking, hydrodesulphurisation and delayed coking, and Phillips 66 consolidated full ownership out of the WRB Refining joint venture with Cenovus from October 2025. The surrounding tank farms make Wood River-Patoka one of the Midwest's principal crude delivery hubs, so tank bottom and pipeline integrity work is continuous. Olin's Winchester plant at East Alton is the other large employer; Alton Steel ceased operations in January 2026. Operators including Phillips 66 Wood River Refinery (Roxana), Phillips 66 Wood River coker and hydrocracker complex, Wood River-Patoka crude and products terminals set the pre-qualification bar their contractors inherit. The system of record for that evidence is the ERP, not a spreadsheet a technician maintains between jobs.
Source: Per-city industrial and compliance research file; ASNT SNT-TC-1A employer certification framework
| Factor | What applies | Why it matters |
|---|---|---|
| Sectors served | Petroleum refining, Crude oil pipeline hub and tank terminals, Delayed coking and hydrocracking, Ammunition manufacturing, River barge and dock operations | Sets which methods, report formats and codes the system must handle |
| Codes audited against | OSHA PSM 29 CFR 1910.119 and EPA RMP 40 CFR 68, API 510 / 570 / 653 and API RP 575, 49 CFR 195 hazardous liquid pipeline integrity, NBIC NB-23, ASME Section VIII Div. 1 and B31.3, ASNT SNT-TC-1A | Each demands retrievable evidence, not a claim of compliance |
| What must be retrievable on demand | Technician certification currency · equipment calibration status · the report against the asset that generated it | These three are what an auditor asks for first |
| Deployment | Cloud or on-premise · configured to the codes above · offline field capture | Field crews lose connectivity; the record cannot depend on it |
What must an NDT ERP track for inspection firms in Wood River?
Evidence against OSHA PSM 29 CFR 1910.119 and EPA RMP 40 CFR 68, API 510 / 570 / 653 and API RP 575, 49 CFR 195 hazardous liquid pipeline integrity, NBIC NB-23, ASME Section VIII Div. 1 and B31.3. That means each technician's certification currency by method and level, each instrument's calibration status on the day it was used, and every inspection report bound to the asset and the job that produced it. An auditor asks for those three before anything else.
Can an inspection company in Wood River run this alongside its existing accounting?
Yes. The ERP owns operations — jobs, technicians, equipment, reports — and pushes finished invoices to the accounting system, which keeps the chart of accounts, tax and reconciliation. For US firms that usually means QuickBooks; the split is documented in the QuickBooks integration guide rather than forcing a migration nobody asked for.
Does it work offline for field crews in Wood River?
Yes. Field capture runs offline and syncs when the device reconnects, because turnaround decks, tank interiors and remote sites have no usable signal and a record that depends on connectivity is a record that gets rewritten from memory hours later. Offline capture is the difference between a contemporaneous record and a reconstruction.
How long does implementation take for a firm in Wood River?
The configuration follows the codes and workflows above rather than a fixed template, so the timeline is set by how much existing data has to be migrated and cleaned — certification records and calibration history are the two that consume the time. Firms usually run the first job cycle in parallel before cutting over.
What happens to inspection records if a technician leaves?
They stay with the asset and the job, which is the point. Employer-based certification ends when the holder leaves, but the reports they signed remain part of the asset's inspection history and are still auditable. A system that stores records per technician rather than per asset loses that history on every departure.