Visual Testing (VT) Weld Inspection Report Template

A VT report for fit-up, in-process and final visual inspection of welds, with the viewing conditions, the gauges used, and a weld-by-weld record of profile and surface imperfections.

Printable template (save as PDF) · Download CSV · Request the editable Word/Excel version

VT report at a glance
ItemReference
ASME code referenceASME Section V, Article 9
ISO referenceISO 17637 (visual testing of fusion-welded joints) with ISO 5817 quality levels
This template coversHeader, equipment and calibration, results table, sign-off
FormatsPrint view (save as PDF) · CSV · editable Word/Excel on request

What a compliant VT report must contain

ASME Section V Article 9 requires a written report when the referencing code section asks for one (T-991 in recent editions). The report must contain the date of the examination, the procedure identification and revision, the technique used (direct, remote or translucent), and the results. Documentation must include every observation and dimensional check the referencing code specifies, so a visual report under a piping or vessel code usually carries weld size, profile and surface imperfection checks against that code's limits.

ISO 17637 specifies visual testing of fusion welds in metallic materials and can also be applied to the joint before welding. It covers test conditions including illuminance and viewing angle, testing equipment, personnel, and the test record. Quality levels for the imperfections found usually come from ISO 5817 or the application standard.

Example visual inspection (VT) report layout

The layout below is the template filled with illustrative example values so each field's purpose is clear. The print view gives you the same layout blank, ready to fill in on site.

Report header
Report number and revisionRPT-2409-017 Rev 0
Date of examination2026-09-14
Client / end user[Client name]
Project or job numberJ-2409
Work order / PO referenceWO-55821
Site and location[Site], Unit 3 pipe rack
Component / item ID[Line or equipment tag]
Drawing number and revisionISO-1045-01 Rev B
Procedure number and revisionNDT-PRO-004 Rev 3
Acceptance standardAs named in the contract (see below)
Extent of examination100% of the welds listed
Technique and viewing conditions
Inspection stageFinal visual, after cleaning
TechniqueDirect visual, supplemented by torch
Lighting (type, measured intensity, meter)Torch plus site lighting, meter S/N LM-07
Viewing distance and angleWithin the procedure limits
Gauges and aidsBridge cam gauge S/N G-14, fillet gauge set, 5× magnifier
Welding process / WPSSMAW, WPS-011 Rev 2
Acceptance standardAs named in the contract (e.g. AWS D1.1 or ISO 5817 level B)
Weld-by-weld visual record (example values)
Weld IDWelderSize / profileUndercutPorosityCracksOtherResult
FW-31W-078 mm fillet, convex, OKNoneNoneNone—Acceptable
FW-32W-076 mm fillet, undersize 1 mm over 40 mmNoneNoneNone—Reject — build up
BW-05W-11Cap height 2 mm, OK0.5 mm, 30 mm longNoneNoneArc strike near toeReject — dress and PT
Personnel and sign-off
Examined by (name, method, level, scheme)[Name], VT Level II, SNT-TC-1A
Certificate number and expiry[Cert no.], expires [date]
Reviewed / interpreted by (Level II or III)[Name], Level III
Client or third-party inspector[Name, company], witnessed / reviewed
Signatures and datesOn the issued report

Download, print or get the editable version

Making a visual report more than a tick box

Visual inspection finds more rejectable defects than any other method, and it is the report most often reduced to a column of ticks. A tick tells a reviewer that someone looked, not what they saw or how they measured it. The template asks for the measured value where the acceptance standard sets a limit, and a short description where it does not.

  1. Record the stage; a fit-up check and a final visual are different examinations with different acceptance points.
  2. Write measured values against limits (fillet size, cap height, undercut depth), not just "OK".
  3. Record the welder identification where the project tracks welder performance or repair rates.
  4. Note conditions that limited the examination, such as access, lighting or surface condition.
  5. Reference any follow-up method (for example PT after dressing an arc strike) so the chain of evidence is complete.

Recording the stages of weld visual inspection

ISO 17637 describes visual testing at several points in the life of a weld: the joint preparation before welding, during welding, the finished weld, and repaired welds. Many quality plans call for a hold or witness point at more than one of these, and each needs its own record line. Before welding, the report typically covers joint type and preparation, root gap, alignment, cleanliness and tack welds. During welding it covers interpass cleaning, root and hot pass condition, and preheat or interpass temperature if the WPS requires it. After welding it covers size, profile, surface imperfections and cleanliness.

Recording the stage on each line prevents a common audit finding: a final visual that is presented as evidence of fit-up checks that were never done. It also lets a project see where repairs originate, which is more useful than knowing only that a weld was rejected at the end.

The header fields every NDT report shares

Whatever the method, a report is only useful if it can be tied to the job, the drawing and the people. Every template in this library starts with the same header block: report number and revision, date, client, job and work-order references, site, component, drawing and revision, procedure and revision, acceptance standard and extent. ASME Section V Article 1 sets general record requirements that each method article then builds on, and client specifications almost always add their own. Keeping the header identical across methods means a reviewer, or the software that reads your reports later, always finds the same facts in the same place.

Generate these reports automatically in Atlantis NDT Reporting

A template solves the layout. It does not stop the same job, drawing, procedure, instrument and technician details being typed again on every report, or a report going out before anyone checked the technician's certificate was in date. In Atlantis ERP, the NDT Reports app holds VT as its own report type with its own numbering sequence, captured in an offline field app with photos and on-screen signatures, then moved through draft, review, approval and sending with inspector, reviewer and approver signatures.

The NDT Reports app has a VT report type with weld lines for defect type, orientation and result, and the offline field app captures photos on the spot and places them in a two-up grid in the PDF. Procedure and WPS references are taken from the job, and the report moves from draft to review to approved before it is sent.

Your company format is kept: templates can be versioned in Excel, Word, PDF or HTML with your logo, header and footer, and Excel templates are filled automatically by mapping fields to cells. When the report is approved, Digital Twin Reporting can place its results on a 3D model of the asset, so clients find reports by location rather than by file name.

See VT reports generated in Atlantis, or keep using the template: both are fine starting points.

Frequently asked questions

What must a VT report contain under ASME Section V Article 9?

When the referencing code requires a written report: the date of the examination, the procedure identification and revision, the technique used, the results, and all observations and dimensional checks the referencing code specifies.

Does ISO 17637 set acceptance criteria?

No. It covers how visual testing of fusion welds is carried out and recorded. Quality levels normally come from ISO 5817 or the application standard.

Is a tick-box checklist enough for a VT report?

Rarely. Where the acceptance standard sets a numeric limit, record the measured value; reviewers and auditors expect to see what was measured.

Should fit-up inspection be reported separately?

It can share a template, but record the stage on each line. Fit-up findings and final weld findings have different acceptance points and different follow-up.

Who can perform and sign VT?

Personnel qualified for visual examination under your written practice or the scheme the contract names. Many construction codes also recognise welding inspector qualifications for visual examination of welds.

Other NDT report templates

Standards referenced

ASME Section V paragraph numbers change between editions. Always check the edition your contract or the referencing construction code names; the template fields are the same.

Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.