API 510 Pressure Vessel Consulting
External / on-stream / internal inspection planning
Field inspection (UT, RT, PT, MT, PAUT, TOFD, WFMT)
Findings analysis + corrosion-rate and remaining-life calculation
Repair / alteration / rerating scope per ASME PCC-2
Findings hand-off to your Authorized Inspector + audit defence
What this page covers
- What we deliver
- Methodology
Key points covered
- API 510 inspector services help owner-operators manage in-service pressure vessels under the API 510 Pressure Vessel Inspection Code (11th Edition 2022). Scope covers external + internal inspection, on-stream inspection planning, thickness surveys and corrosion-rate calculation, repair / alteration / rerating per the National Board Inspection Code (NBIC) and ASME PCC-2, and code-defensible inspection-interval setting.
- All standard pressure vessels: reactors, separators, knock-out drums, towers, columns, heat exchangers (shell side), spheres, bullet tanks, accumulators, surge drums, atmospheric storage tanks (API 653 scope), high-pressure hydrocrackers, hydrotreaters, FCC overhead drums. Special expertise in hot vacuum towers (creep), cyclic-service vessels, sour-service vessels per NACE MR0175.
- API 510 11th Edition 2022, ASME Section VIII Division 1 + 2, ASME Section V (NDE), API 571 (damage mechanisms), API 572 (inspection practices for pressure vessels), ASME PCC-2 (repair), NBIC (repair / alteration). NACE MR0175 / ISO 15156 (sour service), API 945 (amine units), API 939-C (cracking in caustic), API 938-A (carbamate corrosion).
- Standard scope-of-work to first site visit is 5-10 business days. Emergency engagements (turnaround inspection planning, found-defect NDT characterisation, audit defence) closed inside 48 hours. Engagements are staffed with ASNT Level III NDT authority and API-code technical support.
- No. Atlantis is not an API 510 Authorized Inspector and does not act as inspector of record. That role stays with your own API 510 Authorized Inspector or Authorized Inspection Agency.
- Yes. We attend insurer audits (Aon, Marsh, AXA XL), state Jurisdictional inspector visits, NB-related audits, OSHA PSM RCA support. R-Stamp organisations supported during pressure-vessel repair work per the NBIC. Pre-audit gap closure, on-site audit attendance, NCR response, corrective-action close-out.
- High-temperature vessels (hot vacuum towers, hydrotreaters, hydrocrackers): inspection technique selection and interpretation for the damage mechanisms credible per API 571. Sour-service vessels per NACE MR0175 — SSC / HIC / SOHIC susceptibility, in-service inspection technique selection (WFMT for HIC, TOFD / PAUT for through-wall cracks), repair welding metallurgy (low-Si carbon steel, hardness control).
Related: Atlantis NDT ERP · Digital Twin platform · NDT inspection software · NDT reporting software · ASNT Level III consulting · NDT training. Book a free consultation.