NDT Inspection Management ERP in Mohammedia — Certification, Calibration and Work Orders in One System

Atlantis NDT ERP is inspection-management software for NDT service companies, inspection contractors and QA departments operating in Mohammedia, Morocco. It replaces the spreadsheet stack most inspection businesses run on: technician certification currency, equipment calibration control, inspection scheduling, multi-crew work orders, client asset registers, job costing and audit-ready document retention — on one fully customized platform with 30+ business apps behind it.

The Mohammedia market this is configured for

Mohammedia was long defined by Morocco's only crude oil refinery, operated by SAMIR until its 2015 shutdown and ongoing receivership, alongside ONEE's Mohammedia thermal and combined-cycle power plants and a dense corridor of process industry — Cosumar sugar refining and Lafarge Holcim cement — between Casablanca and Rabat. Idled refinery assets require FFS-driven decisions on mothballing, restart or decommissioning, while ONEE's operating power units and neighboring process plants continue routine RBI and API 510/570-aligned inspection; digital twins let asset owners and site administrators visualize integrity data across both live and idled infrastructure without extended, repeated site walks.

Industries served from Mohammedia

Modules inspection companies actually switch for

Integrations

Atlantis ERP has an open REST API, so it connects to SAP, Maximo, NetSuite or any other system that accepts API connections; each integration is scoped with you during implementation.

Frequently Asked Questions

Does Atlantis NDT ERP suit an inspection company based in Mohammedia?

Yes. The platform ships pre-configured for inspection and testing businesses — ASNT SNT-TC-1A and ISO 9712 certification tracking with expiry warnings and blocked double-booking, equipment calibration due-date control, work-order routing across multiple crews and sites, and client-ready reporting. Regional settings, currencies, tax treatment and language for Morocco are configured during onboarding rather than sold as an add-on module.

How long does implementation take for a mid-size Mohammedia inspection contractor?

A typical 20–60 technician inspection business goes live in 6–10 weeks: week 1–2 discovery and data migration mapping, week 3–5 configuration of certification, calibration and work-order modules, week 6–7 pilot with one crew and one client contract, week 8–10 rollout and training. Historic certification records, calibration certificates and client/asset registers are migrated from spreadsheets or the incumbent system as part of the implementation.

Can it replace the spreadsheets we use for technician certification and equipment calibration?

That is the most common reason inspection companies adopt it. Every technician's method-level qualification, vision-exam date, practical and general exam records and on-the-job hours sit against a written practice, and each certificate carries a computed status, with 90-day expiry warning tasks, email alerts, timesheet warnings and blocked double-booking. Equipment calibration is tracked the same way — due dates on every flaw detector, thickness gauge and reference block raise warnings before they lapse. That removes the two failure modes that most often cost inspection firms a client audit.

See it on your own workflow

Free 30-minute walkthrough using your actual job types, certification matrix and client reporting formats. Affordable, accessible, fully customizable — request a demo and tailored quote.

Related: Atlantis NDT ERP · NDT inspection software · inspection management software · Digital Twin in Mohammedia · NDT reporting software.