Inspection Management Software for Kenova
Kenova is the Kentucky-Ohio-West Virginia tri-point, and its industry is the Neal cluster on Big Sandy River Road. Braskem's Neal polypropylene plant and AOC Materials' unsaturated-polyester resin works are both Title V majors. MPLX runs the Kenova NGL extraction facility, MarkWest's 1996 cryogenic turbo-expander plant designed for 160 MMcf/d, plus the Kenova product terminal and Marathon's Neal propane cavern. The Kenova/Catlettsburg dock complex carries four docks and about 1.4 million barrels of shell capacity, with in-line barge butane blending since 2019. Marathon's 307,000 bpcd Catlettsburg refinery sits directly across the Big Sandy, and Columbia Gas's Kenova storage station backs the town.
Kenova is the Kentucky-Ohio-West Virginia tri-point, and its industry is the Neal cluster on Big Sandy River Road. Braskem's Neal polypropylene plant and AOC Materials' unsaturated-polyester resin works are both Title V majors. An NDT ERP serving this market has to carry the evidence those operators audit against — API 510/570/653, 49 CFR 195, 49 CFR 192, OSHA PSM — with technician certification, equipment calibration and inspection records.
MPLX runs the Kenova NGL extraction facility, MarkWest's 1996 cryogenic turbo-expander plant designed for 160 MMcf/d, plus the Kenova product terminal and Marathon's Neal propane cavern. The Kenova/Catlettsburg dock complex carries four docks and about 1.4 million barrels of shell capacity, with in-line barge butane blending since 2019. Marathon's 307,000 bpcd Catlettsburg refinery sits directly across the Big Sandy, and Columbia Gas's Kenova storage station backs the town. Operators including Braskem America Neal polypropylene plant, AOC Materials Neal plant, MPLX Kenova NGL extraction facility and Kenova terminal set the pre-qualification bar their contractors inherit. The system of record for that evidence is the ERP, not a spreadsheet a technician maintains between jobs.
Source: Per-city industrial and compliance research file; ASNT SNT-TC-1A employer certification framework
| Factor | What applies | Why it matters |
|---|---|---|
| Sectors served | Refining, Petrochemicals, Pipeline, Power Generation, Maritime | Sets which methods, report formats and codes the system must handle |
| Codes audited against | API 510/570/653, 49 CFR 195, 49 CFR 192, OSHA PSM, ASME V/VIII, ASNT SNT-TC-1A | Each demands retrievable evidence, not a claim of compliance |
| What must be retrievable on demand | Technician certification currency · equipment calibration status · the report against the asset that generated it | These three are what an auditor asks for first |
| Deployment | Cloud or on-premise · configured to the codes above · offline field capture | Field crews lose connectivity; the record cannot depend on it |
What must an NDT ERP track for inspection firms in Kenova?
Evidence against API 510/570/653, 49 CFR 195, 49 CFR 192, OSHA PSM, ASME V/VIII. That means each technician's certification currency by method and level, each instrument's calibration status on the day it was used, and every inspection report bound to the asset and the job that produced it. An auditor asks for those three before anything else.
Can an inspection company in Kenova run this alongside its existing accounting?
Yes. The ERP owns operations — jobs, technicians, equipment, reports — and pushes finished invoices to the accounting system, which keeps the chart of accounts, tax and reconciliation. For US firms that usually means QuickBooks; the split is documented in the QuickBooks integration guide rather than forcing a migration nobody asked for.
Does it work offline for field crews in Kenova?
Yes. Field capture runs offline and syncs when the device reconnects, because turnaround decks, tank interiors and remote sites have no usable signal and a record that depends on connectivity is a record that gets rewritten from memory hours later. Offline capture is the difference between a contemporaneous record and a reconstruction.
How long does implementation take for a firm in Kenova?
The configuration follows the codes and workflows above rather than a fixed template, so the timeline is set by how much existing data has to be migrated and cleaned — certification records and calibration history are the two that consume the time. Firms usually run the first job cycle in parallel before cutting over.
What happens to inspection records if a technician leaves?
They stay with the asset and the job, which is the point. Employer-based certification ends when the holder leaves, but the reports they signed remain part of the asset's inspection history and are still auditable. A system that stores records per technician rather than per asset loses that history on every departure.
Related: the NDT ERP overview, personnel certification tracking, equipment calibration tracking, QuickBooks integration and the RFP requirements checklist. Firms preparing for an audit should also read the NDT programme gap assessment.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to SNT-TC-1A and ISO 9712, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.