Maritime inspection · Croatia
Hull and Tank Thickness Gauging for Ships at Šibenik
Šibenik stands at the head of a long, sheltered sea channel where the River Krka meets the Adriatic. Cargo ships, island ferries, tour vessels and workboats use its quays, and the deep inner bay gives owners a quiet place to wait or lay up. Atlantis NDT sends ultrasonic gauging technicians from India to the ship, whether she lies alongside, at a lay-by berth or at anchor in the bay.
A long, protected approach channel
Ships reach Šibenik through the narrow St Anthony Channel into a sheltered inner bay, where calm water makes launch transfers and careful ultrasonic readings on decks and tank tops straightforward.
Cargo, ferries and tour boats together
The port serves a small number of commercial cargo calls, island ferry routes toward Zlarin, Prvić and Kaprije, and a fleet of excursion boats for the Kornati and Krka waters.
Quiet waters for lay-up and waiting
The inner bay is used by ships awaiting orders or work elsewhere on the coast, which gives owners the time for a longer condition gauging programme than a normal port call allows.
Inspection services for ships at Šibenik
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreThe port of Šibenik: channel, bay and quays
Šibenik lies well inland of the open sea, reached by following a winding channel. Ships enter through the narrow St Anthony Channel, passing beneath a fortress on the headland, and then widen into the inner harbour and the Krka estuary beyond. This approach shelters the port from almost every sea state, and pilots are used for ships of any size. The port authority manages the commercial quays on the city side and across the bay, while the old waterfront is dominated by ferries, excursion boats and the visiting yachts that make the city a popular sailing stop.
Commercial traffic is modest but real. General cargo ships bring building materials and break-bulk goods, bulk carriers call for loose cargo, and coasters shuttle along the Adriatic. The industrial quays once supported heavier industry, and the legacy of that era remains in the form of deep-water berths, storage areas and bulk-handling space around the bay. Island ferries run from the town to the Šibenik archipelago, and tour operators run excursions to the Kornati islands and the Krka waterfalls, so a considerable part of the local fleet is passenger vessels of moderate size. These operators schedule most of their work in summer and refit in winter.
Because the bay is deep, calm and removed from the main shipping lanes, ships sometimes wait here for charter orders or lay up between employment. That makes Šibenik unusual among smaller Croatian ports: a vessel may be idle for days or weeks, and an owner can use the time to gauge the structure thoroughly. The tidal range is small and currents in the channel are modest, although strong bora winds can arrive suddenly from the interior and make open-water launch transfers unwise. Fog is occasional in winter, and the channel's single approach means that pilotage and tug arrangements are always settled with the agent in advance.
Where gauging is practical in Šibenik
Šibenik does not offer the dry-dock infrastructure of a large repair port, and we do not assume any yard capacity unless the owner and the agent confirm it. What it does offer is time and calm water. A ship at a commercial quay after discharge can have holds, hatch covers and tank tops gauged in a normal working shift, while a vessel lying at a lay-by berth or at anchor in the inner bay may be available for several days, which allows a staged programme through ballast tanks, voids and deck structure.
Ferries and excursion vessels are usually gauged alongside at the town quays during winter, when schedules are light and crews have time to prepare tanks. Where a docking survey is needed, the ship normally proceeds to a yard elsewhere on the Adriatic, and gauging in Šibenik beforehand helps the yard plan steel work. The agent arranges quay access and passes, books launches for ships at anchor and coordinates tug or pilot movements if the ship needs to shift berth during the programme.
- Commercial quays — holds, hatch covers, coamings and tank tops on general cargo and bulk ships after discharge
- Lay-by berths in the inner bay — multi-day condition programmes on ships idle between charters
- Anchorage in the inner harbour — launch access for pre-purchase, on-hire and off-hire gauging
- Town ferry quays — island ferries gauged on vehicle decks, ramps and ballast tanks in winter lay-up
- Excursion boat berths — hull and deck gauging on tour vessels before the summer season opens
- Pre-docking visits — measured steel estimates for vessels about to sail for a yard elsewhere
Thickness measurement through the survey cycle at Šibenik
How much steel has to be gauged depends on which survey the ship is due for, its type and its age. The pattern below is the usual one under IACS unified requirements; the attending surveyor and the class rules for the ship decide the final extent. For a ship calling at Šibenik, we agree the programme with the class and the owner before the team mobilises.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Regulation and the Šibenik shipping scene
Foreign ships calling at Šibenik are covered by Paris MoU port state control, carried out by Croatian inspectors under the authority of the Ministry of the Sea, Transport and Infrastructure and the harbour master's authority for the Šibenik area. Smaller ships on short Adriatic runs get inspected less often than deep-sea traffic, but an old coaster with visible hatch cover wastage is an obvious target. Owners who plan to trade in the region for several more years often decide to gauge before an inspection, so that any deficiency can be fixed first.
The EU Ship Recycling Regulation and the EU emissions rules shape decisions here too. Larger ships must carry an Inventory of Hazardous Materials when calling at EU ports, and ships above the size thresholds fall under EU ETS and FuelEU Maritime. For the older coasters and ferries that make up much of the local fleet, those obligations are weighed against the measured condition of the steel. The Krka National Park and the Kornati islands bring heavy summer tourism, so tour vessels are a significant group: their operators care about both safety certificates and visible condition, and thickness readings support both.
Since 1 May 2025 the whole Mediterranean has been a sulphur emission control area, so ships calling at Šibenik burn 0.10% sulphur fuel or run a scrubber. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service and are worth adding to the gauging scope at every docking.
Typical thickness gauging jobs in Šibenik
Jobs in Šibenik are shaped by time and calm water. A coaster lying idle in the bay might need a full condition assessment before sale; a bulk carrier at a quay needs hold structure checked after discharge; a ferry in winter lay-up needs vehicle deck and tank readings before her docking elsewhere. We agree scope and report format with the superintendent before the team travels.
- Pre-purchase gauging of an older coaster lying at a lay-by berth: main deck, hatch covers, ballast tanks and accessible hold structure
- Hold and hatch cover gauging on a bulk carrier after discharge at a commercial quay, ahead of an intermediate survey
- Winter lay-up programme on an island ferry at the town quay, covering vehicle deck, ramp hinges, voids and ballast tanks
- Steel estimate for an excursion vessel before she sails to a yard, with readings on hull plating, decks and engine room tank tops
- Off-hire condition check on a ship at anchor in the inner bay, recording measured values for the owner's records
How a thickness measurement job runs at Šibenik
The sequence for a thickness measurement job at Šibenik is short and written down, so the yard, the surveyor and the superintendent know who arranges what.
Split Airport is the nearest large airport and lies within road distance, while Zadar Airport and Zagreb are also options. The ship's agent arranges quay passes and port access, and books launches for ships at anchor in the bay. The team travels from India on Schengen visas, so the visa schedule sets the earliest start. Longer lay-up programmes leave comfortable time for planning, whereas a short cargo call needs the berth and date confirmed as early as possible.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
We send the team from India to the ship for each job rather than keeping staff at the port, and plan the mobilisation around visas and the vessel's itinerary. The work is planned and supervised by the founder, our Responsible NDT Level III (ASNT NDT Level III in UT, RT, MT, PT and VT, with more than eleven years of international field experience). Technicians hold certification under the company's written practice to ASNT SNT-TC-1A; Atlantis is ISO 9001 and ISO 14001 certified.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- General cargo ships
- Small bulk carriers
- Coasters
- Island passenger ferries
- Excursion and tour vessels
- Tugs and workboats
- Ships laid up or waiting for orders
Frequently asked questions
Is Šibenik a good place to gauge a ship that is laid up?
Often, yes. The inner bay is sheltered and quiet, so a vessel between charters can lie at a berth or at anchor for days. That gives time to gauge decks, tanks and holds in stages and to record readings carefully, which is harder to do on a short cargo call.
Is there a drydock in Šibenik?
We do not assume one. Dock availability should be confirmed with the owner and the agent. If a docking survey is needed, the ship normally goes to a yard elsewhere on the Adriatic, and we gauge in Šibenik beforehand so that the yard has a realistic steel estimate.
Can tour boats and ferries be gauged before the summer season?
Yes. Winter and early spring are the best times, when schedules are light and crews can prepare tanks. We measure hull, decks and tank boundaries, record the readings by location, and give the operator a clear view of what needs renewal before the season starts.
Does the channel affect work on ships at anchor?
Slightly. The channel is sheltered, but a bora wind can make launch transfers unsafe for a day. Pilotage rules also limit when a ship can shift berth, so we keep the plan flexible and agree the sequence with the agent before the team travels.
Does thickness measurement at Šibenik need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.