Maritime inspection · Portugal
Thickness Measurement for Cargo Ships on the Sado Estuary at Setúbal
Setúbal is a cargo port on the Sado estuary, south of the Tagus, serving a car plant, a pulp and paper mill, cement works and a steady flow of dry bulk. Ships come and go on the tide through a dredged channel and some lie at the berth for days. That gives time for gauging alongside, between cargo operations. Atlantis NDT brings a technician team from India to the ship in the estuary and reports for the superintendent.
Car carriers loading local output
Vehicle carriers load cars built in the region at the ro-ro terminal. With decks clear after discharge and before loading, the team can gauge deck plating, ramps and ballast tanks.
Hold gauging after pulp and bulk
Pulp, paper and dry bulk ships empty their holds at the quay. Frames, lower hopper plating and hatch coamings become accessible once the holds are swept, so hold gauging can follow discharge directly.
Estuary calls timed to the tide
Deep-draught ships use the channel at the favourable state of tide. We plan the arrival and the gauging around the pilot and berth times, with a fallback if the call slips.
Inspection services for ships at Setúbal
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreA river port behind the Arrábida hills
Setúbal lies on the northern shore of the Sado estuary, with the Arrábida range behind it and the long Tróia peninsula across the water. Ships enter from the Atlantic through the estuary mouth and follow a dredged channel to terminals strung along the north bank. The estuary is also a nature reserve, home to a resident dolphin population, so shipping is managed carefully, and the channel imposes limits on draught and sometimes on timing.
The cargoes reflect the industry of the surrounding region. A vehicle plant inland sends cars to the ro-ro terminal for export on car carriers, a paper company ships pulp and paper through its own berths, and cement and clinker ships call at the Outão terminal. Dry bulk terminals receive grain, fertiliser and other bulk, and a ferry crosses to Tróia for passengers and vehicles. Compared with the Tagus, the traffic is more industrial and less tied to cruise or container flows, and it moves in a steady pattern.
Ships anchor in the estuary or just off its mouth while they wait for the tide or a berth. Atlantic swell stops at the bar, and inside the estuary the water is sheltered, so launch-served work at anchor is more practical than at many open-coast ports. Winter southwesterly gales occasionally close the entrance, and fog in cold months can delay pilotage. For gauging the main variables are tide and berth availability, rather than weather inside the estuary itself.
Berths, anchorage and the yard across the water
Most gauging at Setúbal happens alongside at the cargo terminals. The ro-ro berth suits car carriers between discharge and loading, the pulp and paper berths allow hold work once the cargo is out, and the bulk quays serve ships that have discharged grain or fertiliser. Cement ships lie at their own terminal, where dust control and the shipper's rules shape the access. In each case the superintendent confirms the cargo programme with the agent, and the team plans the work to follow discharge.
Setúbal also has a large ship repair yard on the estuary, where tankers, gas carriers and bulk carriers are docked, and it is a short run from the commercial berths. Ships that need a docking can move there, and our team can follow with equipment and permits in place. For ships waiting at anchor, the sheltered estuary allows boarding by launch to carry out pre-docking or condition work, provided the harbour master clears the transfer and sea conditions are suitable.
- Ro-ro terminal for vehicles: car-deck, ramp and ballast-tank gauging on car carriers between discharge and loading.
- Pulp and paper berths: hold frames, hatch coamings and ballast tanks on forest-products ships after discharge.
- Cement and clinker terminal: hold and deck gauging on cement carriers, under the terminal's dust and access rules.
- Dry bulk quays: hold, hopper tank and hatch cover readings on bulk carriers once the cargo is out.
- Estuary anchorage: launch-served pre-docking and condition gauging on ships waiting for a berth or the tide.
- Repair yard on the estuary: gauging during docking, for ships moving there from the commercial berths.
Thickness measurement through the survey cycle at Setúbal
Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at Setúbal usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Portuguese maritime authority and EU requirements
Portuguese ports are inspected under the Paris MoU, and the national maritime authority and the directorate-general for maritime resources oversee flag and port state matters. Foreign-flag ships calling at Setúbal can be selected for port state control inspections like any other Paris MoU port, and structural condition is one of the areas inspectors look at. A current thickness record helps a master or superintendent answer questions about corrosion without delaying the ship.
EU regulations affect these ships in several ways. The Ship Recycling Regulation requires a valid Inventory of Hazardous Materials for ships calling at EU ports, and owners of older bulk carriers and car carriers often update it when planning a sale. EU ETS and FuelEU Maritime also bear on ships trading to and from Portugal. Car carriers on European routes are a particular case, since newer vessels are LNG dual-fuel, and owners of older tonnage want to know whether the steel will last through the transition.
Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Setúbal meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.
Typical gauging jobs at Setúbal
Work at Setúbal follows cargo operations. The superintendent names the spaces to be measured, the agent confirms the discharge programme, and the team arrives when the holds or decks are clear. Where a docking is planned at the repair yard or elsewhere, the readings feed directly into the steel estimate. Typical requests are:
- A car carrier between discharge and loading: gauging of lower-hold and fixed deck plating, plus magnetic particle testing at ramp and deck-support welds.
- A forest-products ship after pulp discharge: hold frames, lower hopper plating and hatch coamings, with dye penetrant at doubler edges.
- A bulk carrier after grain discharge: gauging of holds, topside and hopper tanks ahead of an intermediate or renewal survey.
- A cement carrier at its terminal: deck, hatch cover and ballast-tank readings within the terminal's access arrangements.
- Pre-purchase gauging on a vessel lying at anchor in the estuary while a buyer completes the inspection.
How a thickness measurement job runs at Setúbal
The sequence for a thickness measurement job at Setúbal is short and written down, so the yard, the surveyor and the superintendent know who arranges what.
Lisbon Airport is the usual arrival point for international travellers, and the road south crosses the Tagus before reaching Setúbal, so the transfer needs a planned allowance for traffic. Technicians from India need a Schengen visa for Portugal, which we apply for once the ship's call is confirmed. Port and terminal access, ISPS clearance and any launch transfer are arranged through the ship's agent, who receives the team's passport and certificate details before arrival.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
We send the team from India to the ship for each job rather than keeping staff at the port, and plan the mobilisation around visas and the vessel's itinerary. The work is planned and supervised by the founder, our Responsible NDT Level III (ASNT NDT Level III in UT, RT, MT, PT and VT, with more than eleven years of international field experience). Technicians hold certification under the company's written practice to ASNT SNT-TC-1A; Atlantis is ISO 9001 and ISO 14001 certified.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Vehicle carriers (PCTC)
- Pulp and forest-products carriers
- Handysize and Supramax bulk carriers
- Cement and clinker carriers
- General cargo ships
- Coastal tankers
- Passenger ferries to Tróia
Frequently asked questions
Can a car carrier be gauged at Setúbal between discharge and loading?
Yes, if the call gives enough time. With the decks clear, a team can cover a defined set of fixed deck plating, ramps and ballast tanks, and carry out crack detection at suspect welds. We agree the sequence beforehand so the highest-priority areas are measured first.
Does the tide affect when you can work?
It affects when ships arrive and leave, rather than the gauging itself. Deep-draught ships use the channel at favourable states of tide, so the call time is set by pilotage. We plan around the confirmed berth time and keep a fallback if the ship's arrival changes.
Can ships be gauged at anchor in the Sado estuary?
Yes, when the harbour master allows a launch transfer and conditions are calm. The estuary is more sheltered than the open coast, so anchorage jobs are practical. They are limited to spaces that the ship has ventilated and made safe, and the scope is smaller than at a berth.
Is hold gauging possible during cargo operations?
Only in holds that are empty and cleaned, and only where the ship and terminal allow it. On pulp and bulk ships the practical window is after discharge, before the next loading. We confirm with the agent which holds will be free and for how long.
Where do Setúbal ships go for dry-docking?
Often to the repair yard on the same estuary, a short move from the commercial berths. Others go to yards elsewhere in Portugal, Spain or the Mediterranean. Readings from Setúbal use TM plan references, so any yard and class surveyor can use them.
Does thickness measurement at Setúbal need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.