Maritime inspection · Spain
Thickness Gauging for Ships in the Cádiz Bay Drydocks
The Bay of Cádiz is one of the main ship-repair centres of southern Spain, with Navantia's ship-repair yard at Cádiz docking cruise ships, gas carriers, tankers and other large merchant ships. A ship docking here for its renewal survey needs thickness gauging that does not hold up the yard. Technicians are mobilised from India to Cádiz for pre-docking surveys, in-dock measurement and post-blast confirmation, timed to the docking date the owner has fixed months in advance.
Paced to the yard programme
Dockings in the bay run to tight critical paths. We schedule pre-docking, in-dock and post-blast readings so steel lists reach the yard and the surveyor before the work reaches each area of the ship.
Cruise ship and gas carrier tanks
Large tank and void systems on cruise ships, and ballast and double-bottom structure on gas carriers, are measured by priority so the most important readings come first in a short docking.
Last dock before the Med ECA
Ships leaving Cádiz eastbound are inside the Mediterranean ECA soon after sailing. A docking here is the right moment to gauge and replace scrubber wash-water and overboard piping from outside the hull.
Inspection services for ships at Cádiz
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreCádiz Bay: drydocks at the Atlantic entrance to the Mediterranean
Cádiz's place in ship inspection comes from its drydocks rather than its cargo. Navantia's ship-repair yard in Cádiz is a long-established large-ship repair yard, and owners of cruise ships, gas carriers, tankers and large bulk carriers schedule dockings there, with Navantia's other sites around the bay adding shipbuilding and offshore fabrication. The Autoridad Portuaria de la Bahía de Cádiz handles a mixed but smaller cargo trade across Cádiz, El Puerto de Santa María, Puerto Real and the Zona Franca, along with cruise calls for visitors heading to Cádiz, Jerez and Seville, and a ro-pax link to the Canary Islands.
The yard's location is part of its appeal. Cádiz lies on the Atlantic coast just west of the Strait of Gibraltar, close to the main routes between the Atlantic, the Mediterranean and Suez, so a ship can divert for a docking with little deviation from its trade. Cruise lines use the bay for dockings between seasons, and gas carrier operators value a yard used to their ship types. Ships arriving for the yard often come straight from passage, so the first gauging may take place at anchor in the bay or alongside the repair quay before the ship enters the dock.
For gauging, this means planned, full-scope work. A renewal survey docking on a tanker, gas carrier or bulk carrier needs the thickness measurement programme set by the IACS unified requirements — extensive at the third renewal survey and later for ESP ships — and the yard's critical path depends on measurements arriving early. Cruise ships bring a different problem: extensive tank and void networks, tight docking periods and many contractors on board at once. In both cases, gauging before the ship arrives, or in the first days of the docking, lets steel renewal be ordered and planned before the yard reaches the areas concerned, which is where most of the value of drydock thickness gauging lies.
Drydock gauging around the Bay of Cádiz
Most gauging in the bay is done inside Navantia's Cádiz ship-repair yard, either at the repair quays before and after docking or in the dock itself. In the dock, the bottom and side shell can be measured from outside, the yard's gas-free certification and ventilation regime governs tank entry, and staging or lifts give access to high structure in holds and tanks. The yard's planning sets when each space is open, so the gauging programme is tied to the yard schedule and updated daily with the ship's superintendent.
Two rounds of measurement are common. The first, before or at the start of the docking, gives the surveyor and the yard the corrosion picture and the steel list; the second, after cleaning, blasting or cropping, confirms the thickness of areas left in place and the extent of renewal. For cruise ships, the volume of tanks and voids means the technicians often work in parallel with tank cleaners and painters, which needs close coordination with the yard's permit system. Ships waiting for a dock slot at anchor in the bay can be gauged by launch beforehand, which shortens the time the ship spends in the dock itself.
- Navantia's Cádiz ship-repair yard — in-dock gauging of bottom shell, tanks, holds and decks for renewal and docking surveys on large merchant ships
- Repair quays at the yard — pre-docking and post-undocking gauging alongside, including ballast tanks, piping and deck structure
- Cádiz Bay anchorage — pre-docking gauging by launch on ships waiting for a dock slot, so the steel list is started early
- Cruise berths in the port of Cádiz — short sea-water line and cofferdam checks on cruise ships making day calls, planned with the technical department
- Port terminals at Cádiz and the Zona Franca — gauging on bulk carriers, ro-ro and container ships calling for cargo
- Gibraltar and Algeciras — nearby ports where gauging can begin on passage before a ship continues to a docking in the bay
Thickness measurement through the survey cycle at Cádiz
Every renewal survey asks for more thickness measurement than the last, and for oil tankers, chemical tankers and bulk carriers the ESP Code adds close-up survey on top. The table is the usual shape of the work; the class rules and the surveyor set the exact extent, which is why the measurement plan for a job at Cádiz is agreed in writing before mobilisation.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Regulation and market context for Cádiz dockings
Cádiz lies on the Atlantic side of the Mediterranean SOx ECA boundary, so ships docking here are outside the ECA but enter it within hours of sailing east. That makes a Cádiz docking a natural moment to inspect scrubber systems before a Mediterranean season: wash-water and overboard lines, their discharge valves and the adjoining shell plating can be gauged and renewed in the dock, where access from outside is easy. Port state control in the port follows the Paris MoU, applied by the Spanish maritime administration through its local harbour master.
Cruise ships and gas carriers are among the ship types most associated with the yard, and both have particular gauging needs. Cruise ships run large ballast, fresh water, grey and black water tank systems that are only fully accessible in dock, and their docking periods are short and tightly scheduled. Gas carriers' hull and ballast tank structure is surveyed under the class rules for their type, while their cargo containment is a separate specialist matter outside ultrasonic gauging. Since EU ETS reached shipping in 2024 and FuelEU Maritime followed in 2025, more dockings also include energy-saving retrofits, which open structure that needs measuring before it is modified.
Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Cádiz meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.
Gauging jobs at Cádiz dockings
Work in Cádiz is usually tied to a fixed docking date set well in advance, which suits technicians travelling from India: visas, the measurement plan and the steel estimate can all be prepared before the ship arrives. Typical jobs combine pre-docking readings with in-dock and post-blast measurement, sized to the survey and the ship type. Larger dockings may need the team to stay for most of the yard period.
- Third renewal survey gauging on a Suezmax tanker docked at the Cádiz yard: cargo and ballast tank structure, bottom and deck plating to the ESP extent, delivered in phases to keep the yard on schedule.
- Cruise ship docking between seasons: ballast, fresh water and grey water tank gauging, sea chest and shell readings from outside, and scrubber overboard pipe measurement in dock.
- Pre-docking gauging of an LNG carrier's ballast tanks and double bottom at anchor in the bay, so that steel renewal is estimated before the ship enters the dock.
- Post-blast thickness readings on a bulk carrier's hopper tanks and hold frames, confirming which areas the surveyor accepts and which must be cropped and renewed.
- Aft peak tank, rudder trunk and stern frame area gauging before the yard fits an energy-saving duct or a new propeller, so the structure around the work is confirmed sound.
How a thickness measurement job runs at Cádiz
The sequence for a thickness measurement job at Cádiz is short and written down, so the yard, the surveyor and the superintendent know who arranges what.
Technicians fly from India to Jerez or Seville, usually via Madrid or another European hub, and reach Cádiz by road; Málaga and Gibraltar are alternatives. Yard access is arranged through the shipyard and the ship's superintendent, with induction and safety passes issued at the gate, while anchorage work is arranged by the ship's agent with a launch. Schengen visas are needed, and since dockings in the bay are typically booked months ahead, we align visa applications with the docking date and the yard's planning meetings.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
We send the team from India to the ship for each job rather than keeping staff at the port, and plan the mobilisation around visas and the vessel's itinerary. The work is planned and supervised by the founder, our Responsible NDT Level III (ASNT NDT Level III in UT, RT, MT, PT and VT, with more than eleven years of international field experience). Technicians hold certification under the company's written practice to ASNT SNT-TC-1A; Atlantis is ISO 9001 and ISO 14001 certified.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Cruise ships
- LNG carriers
- Crude and product tankers
- Bulk carriers
- Ro-pax ferries
- Container ships
Frequently asked questions
When should gauging start for a renewal survey docking in Cádiz?
Ideally before the ship arrives. Pre-docking readings at anchor or at a previous port give the yard a steel estimate to plan against, and the first days in dock are then spent on areas only accessible there — bottom shell, gas-freed cargo tanks, high structure on staging. Leaving all gauging to the docking risks steel orders arriving late on the yard's critical path.
Can you gauge a cruise ship's tanks during a short Cádiz docking?
Yes, with planning. Cruise ship tank networks are extensive, so we agree priorities with the technical superintendent — usually tanks due for survey, known problem areas and those adjoining shell renewals — and work alongside the yard's cleaning and painting crews. Readings are issued as each group of tanks is completed, so renewal decisions are taken before the ship floats out.
Is Cádiz inside the Mediterranean ECA?
No. The ECA boundary is a meridian in the Strait near Tarifa, east of Cádiz, so the bay is outside it. Ships leaving a Cádiz docking eastbound enter the ECA soon after sailing, and owners often use the docking to gauge and renew scrubber wash-water and overboard piping while it can be reached from outside the hull.
Do you work for the yard or directly for the owner?
Our contract is with the shipowner or manager, and we plan the gauging around the yard's programme in coordination with the superintendent and the yard's planners. The yard decides access, gas-freeing and staging; the attending class surveyor decides what readings are needed for the survey. We report to the owner in the form the survey requires, with copies to the yard where the owner agrees.
Does thickness measurement at Cádiz need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.