Maritime inspection · Spain
Hull Gauging in Algeciras: Ultrasonic Thickness Measurement at Berth and Anchor
Algeciras sits on one of the world's busiest shipping lanes: mainline container ships relaying cargo, tankers serving the refinery at San Roque, ro-pax ferries shuttling to Tanger Med and Ceuta, and a steady queue of ships taking bunkers in the bay. When a superintendent needs thickness gauging in Algeciras between calls, we mobilise a team from India, plan the work around the ship's berth window or anchorage stay, and deliver readings laid out the way the attending surveyor will review them.
Built around short port windows
Ships in Algeciras are usually here for a relay call, a bunkering stop or a refinery berth. We scope the gauging to the hours actually available and agree priorities with the superintendent before anyone boards.
Strait of Gibraltar ship inspection
One mobilisation can cover Algeciras berths, the bay's anchorages and the drydocks at Gibraltar and in the Bay of Cádiz, so measurements started afloat can be completed when the ship docks.
Scrubber and piping focus
Mediterranean ECA compliance keeps scrubbers running in the bay. We gauge wash-water, overboard and sea-water lines and the shell connections they serve, reporting wall loss against nominal thickness and earlier readings.
Inspection services for ships at Algeciras
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreAlgeciras Bay: transhipment, bunkering and the Strait trades
Algeciras is one of the main container transhipment hubs of the Mediterranean. Its terminals relay boxes between Asia–Europe, transatlantic and West Africa services, so the quays handle the largest container ships in service alongside the feeders that redistribute cargo around the western Mediterranean and the Iberian Atlantic coast. Car carriers and general cargo ships also work the port, though containers dominate the quay line. The Autoridad Portuaria de la Bahía de Algeciras also runs the port of Tarifa, and between the two the ro-pax links to Tanger Med, Tangier and Ceuta operate all year, with the heaviest traffic during the summer Operación Paso del Estrecho.
The bay is equally a liquid-bulk and bunkering anchorage. Crude and product tankers serve the refinery at San Roque, and ships transiting the Strait regularly divert into the bay simply to take fuel from barges at anchor before continuing into the Mediterranean or out into the Atlantic. Bulk carriers, tankers and car carriers waiting for orders, a berth or a crew change add to the anchorage population. Many of these ships are present for hours rather than days, and planning gauging around that window is what separates inspection work here from work at a repair port.
Algeciras is not primarily a drydock port, so gauging here is nearly always done afloat: at a container berth during a long relay call, at a tanker berth, or at anchor during bunkering or a wait for orders. The work that fits is targeted — confirming suspect areas reported by the crew, measuring scrubber wash-water piping, checking fire main and ballast lines after a port state control remark, or taking pre-docking readings in ballast tanks so the yard has a steel renewal estimate in hand when the ship arrives. Full renewal-survey gauging on a large tanker or bulk carrier is better programmed into the docking itself, and the nearest drydocks are across the bay at Gibraltar and along the coast in the Bay of Cádiz.
Where gauging happens around Algeciras Bay
Gauging in Algeciras is planned around one of three settings: a terminal berth, a liquid-bulk berth or the anchorage. On a container ship, the terminal's crane programme and lashing gangs set the pace, so the team works in spaces that do not interfere with cargo — engine-room and double-bottom tanks, void spaces, the steering gear flat and the scrubber casing. At tanker berths, permit-to-work and gas-free rules decide what can be entered: cargo tanks are gauged only when the ship is gas-free, while deck structure, pump rooms and segregated ballast tanks are usually accessible once the permits are in place.
At anchor, the limits are launch access, the weather in the Strait and how long the ship will stay. A strong Levante, the easterly wind funnelled through the Strait, can make boarding from a launch difficult or suspend it altogether, so anchorage jobs need some float in the plan. The ultrasonic gauges and magnetic particle kit travel with the technicians and go aboard by launch, so no shore equipment is needed. When the scope grows to a full survey programme, combining afloat work in Algeciras with the remaining measurements at a nearby drydock usually makes the best use of the ship's time.
- APM Terminals Algeciras and the Isla Verde Exterior container terminal — scrubber piping, engine-room tank and void gauging on mainline ships during relay calls
- Algeciras Bay anchorages — bunkering and waiting stays used for targeted gauging, pre-purchase sampling and crack detection at known fatigue details
- Tanker berths serving the San Roque refinery — deck, pump room and segregated ballast readings for crude and product tankers, subject to the terminal's permit rules
- Ro-pax berths at Algeciras and Tarifa — car-deck, ramp and ballast tank gauging during lay-overs or off-season maintenance periods
- Drydocks at Gibraltar and in the Bay of Cádiz — where gauging started in Algeciras can be completed alongside the docking survey
Thickness measurement through the survey cycle at Algeciras
Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at Algeciras usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Port state control, the Med ECA and transhipment economics
Spain is a Paris MoU state, and port state control inspections in Algeciras are carried out by inspectors of the Capitanía Marítima, the harbour-master authority of the Spanish maritime administration. Structural corrosion found during an inspection — wasted deck plating, holed air pipes or a thinned fire main — can lead to a detention, and owners then need gauging at short notice so that class and the flag can decide on repairs. Since 1 May 2025 the bay has been inside the Mediterranean SOx ECA established under MARPOL Annex VI regulation 14: ships without scrubbers burn 0.10% sulphur fuel, while scrubber-equipped ships keep their systems running, and their wash-water piping keeps corroding.
Commercially, Algeciras competes with Tanger Med across the Strait for the same transhipment business. With EU ETS covering shipping since 2024 and FuelEU Maritime since 2025, carriers now weigh emissions exposure as well as port time when they plan relays, and the outcome decides how long their ships spend in the bay. For technical managers this has a practical effect: a mainline vessel's Algeciras call is usually tight, but feeders, ships waiting for a slot and vessels laid by between rotations can offer a usable window for inspection, provided the gauging plan is ready before the ship arrives.
Since 1 May 2025 the whole Mediterranean has been a sulphur emission control area, so ships calling at Algeciras burn 0.10% sulphur fuel or run a scrubber. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service and are worth adding to the gauging scope at every docking.
Typical thickness gauging jobs in Algeciras
Gauging in Algeciras is usually scoped tightly, because the ship's time in port is set by cargo or bunkering rather than by the inspection. The jobs below are the kind of work that fits a berth or anchorage window here; anything larger is planned into a docking, with Algeciras used to gather data beforehand. We agree the measurement plan with the superintendent before the team travels, so the time on board is spent measuring rather than locating spaces.
- Scrubber pipe inspection on a container ship during a relay call: ultrasonic gauging of wash-water and overboard lines plus the shell connection area, with readings mapped against the previous survey.
- Ballast tank readings on a Capesize bulk carrier at anchor during bunkering, with its third renewal survey coming up, giving the chosen yard a steel renewal estimate in advance of the docking.
- Pre-purchase thickness gauging at anchor on a product tanker changing hands, sampling deck, bottom and ballast tank structure to give the buyer a corrosion picture before the delivery decision.
- Magnetic particle crack detection at stern ramp hinges and car-deck supporting structure on a Strait ro-pax ferry during an off-season maintenance period, with gauging of the surrounding plating.
- Fire main and sea-water piping gauging on a tanker alongside at San Roque after a port state control remark on corroded piping, giving class measured wall thickness to decide on repairs.
How a thickness measurement job runs at Algeciras
A gauging job at Algeciras runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.
For Algeciras, the usual routing from India is into Málaga, Seville or Jerez through a European or Gulf hub, then by road to the bay; Gibraltar's airport is another option when UK connections suit. Terminal and jetty access goes through the ship's agent, who requests ISPS gate passes and lists the technicians for the terminal. For anchorage jobs the agent also secures a launch, timed so the technicians board as the ship starts bunkering or settles to wait. Technicians travel on Schengen visas, so the earlier we know the expected call, the more reliably the mobilisation can be fixed.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Container ships
- Crude and product tankers
- Ro-pax ferries
- Bulk carriers
- Car carriers (PCTC)
- Chemical tankers
- Bunker tankers and barges
Frequently asked questions
Is a bunkering stop in Algeciras Bay long enough for gauging?
For targeted work, often yes. A bunkering stop leaves time for scrubber piping, a suspect ballast tank, a deck area flagged by the crew, or sample readings for a buyer. A full renewal-survey scope will not fit. If you share the expected anchoring time and the list of spaces, we will tell you plainly whether the window is realistic.
Does the Mediterranean ECA apply in Algeciras?
Yes. The ECA is bounded to the west by a meridian inside the Strait, near Tarifa, and Algeciras Bay lies east of that line, so the Mediterranean SOx limits have applied there since 1 May 2025. Scrubber-equipped ships calling at Algeciras run their systems throughout the stay, which leaves the wash-water and overboard lines exposed to acidic water for the whole call and makes periodic ultrasonic gauging of them worthwhile.
Where should a ship dock if the Algeciras gauging shows substantial corrosion?
That decision belongs to the owner and class, but the nearest drydocks are at Gibraltar and in the Bay of Cádiz, with further yards along the Spanish Mediterranean coast. Gauging at Algeciras before the docking gives the chosen yard a steel list to plan against, and the same technicians can travel on to the yard to take the remaining measurements once the ship is dry.
How are gauging results handled when port state control raises a corrosion deficiency in Algeciras?
We measure the affected structure or piping, record the readings against original thickness and the allowable diminution, and report so that the class surveyor and the flag can decide on repairs or a condition of class. Whether readings are credited for class purposes depends on that society's rules for thickness measurement firms, so we confirm the arrangement with your class contact before work starts.
Does thickness measurement at Algeciras need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.