Special Survey Thickness Measurement · Algeciras, Spain

Renewal Survey Gauging from Algeciras: Pre-Docking Readings Before the Ship Reaches the Dock

Algeciras has no repair dock of its own, yet a great many ships due a renewal survey pass through the bay every month. That makes it the natural place to gather steel data afloat, so the docking at Gibraltar or in the Bay of Cádiz starts from measured readings instead of guesses. We send a thickness measurement team from India to the ship at a terminal berth or at anchor, gauge the spaces that can be entered, and hand the superintendent a steel renewal estimate before the yard's quotation round closes.

Afloat first, dry later

Algeciras readings are taken while the ship is still trading. Ballast tanks, void spaces and deck structure are gauged at the berth or at anchor, so the shell and bottom work in the dock can be limited to what cannot be reached afloat.

Steel estimate ahead of the quotation round

Yards quote on the steel they expect to renew. Readings taken in Algeciras weeks before the docking let the superintendent put measured wastage into the specification, instead of accepting an open allowance that is argued over once the tanks are open.

One programme across the Strait

Point numbering, sketches and member references started at Algeciras carry straight into the docking survey at Gibraltar or Cádiz, so the class surveyor reviews one continuous set of readings rather than two unrelated reports.

Why do renewal survey ships get gauged afloat at Algeciras?

The bay sits where trades converge: Asia–Europe and transatlantic container services, tankers loading or discharging at San Roque, bulk carriers waiting for orders, and ships that simply stop to bunker before entering or leaving the Mediterranean. A ship a few months from its renewal survey has little reason to detour to a repair port early, but it has every reason to use a lay-by or a bunkering stop to learn what the docking will find.

That is the logic of gauging afloat here. The renewal survey itself, with its close-up survey and the surveyor attending in the tanks, belongs in the dock. Before that, the owner needs to know how much plating and how many stiffeners are near the renewal limit, which spaces will be worst, and whether a particular tank deserves a coating decision before the ship arrives at the yard. Readings from ballast tanks, void spaces and accessible holds answer most of those questions at a time when the answers can still change the repair specification.

Because the work is done ahead of the survey, it remains owner's information. It is not credited to the class survey, and the report says so. What it buys is time: the yard sees a measured scope at the start of the quotation round, and the class gauging in the dock can be aimed at confirming and extending the worst areas.

Where in Algeciras Bay can special survey gauging be done?

Three settings are realistic in the bay, and each allows a different part of the renewal gauging programme. A container ship alongside for a long relay call leaves engine-room tanks, double-bottom spaces, steering gear flat and the scrubber casing reachable, because cargo work happens on deck. A tanker at a liquid-bulk berth can be gauged on deck, in the pump room and in segregated ballast tanks once permits are issued, while cargo tank internals wait for a gas-free window. A ship at anchor, particularly during bunkering, has the longest uninterrupted time and is boarded by launch.

What is not realistic is a full renewal gauging programme on a large tanker or bulk carrier with the hull wet. Bottom plating, the underside of the keel and rudder, and anything below the waterline stay for the dock. That boundary is why the scope is split in two, and why the plan agreed with the superintendent names which spaces are measured in the bay and which are left for the yard.

  • Container terminal berths — double-bottom, wing and void spaces and the engine room, gauged while cranes work the cargo
  • Tanker berths serving the refinery — deck, pump room and segregated ballast tanks, subject to the terminal's permit rules
  • Anchorage during bunkering — ballast tanks, hold frames and deck structure reached by launch for an uninterrupted spell
  • Lay-by after discharge — cleaned and gas-freed tanks gauged before the ship sails for the dock

Which ships passing Algeciras are close to a renewal survey?

Older ships dominate the demand. A Capesize bulk carrier heading for its third renewal survey has hold frames, hopper plating and topside tanks that are likely to be the main steel item. A product tanker at fifteen years faces the widest tank gauging of its career under the ESP rules, and charterers often ask for an assessment on top. A ro-pax on the Strait crossings has a different pattern: car-deck plating, ramp structure and ballast tanks wear on a short, repeated rotation, and its renewal survey is slotted into the quiet season.

Container ships need less steel but more attention to piping. A scrubber-fitted ship approaching its second or third renewal carries wash-water and overboard lines that have been working in acidic conditions for years, so the survey programme adds those lines and the shell connection to the hull gauging. Algeciras calls are short for these ships, so the gauging is scoped to a call and planned with the chief engineer before arrival.

How is the afloat scope set for a ship due its renewal survey?

We begin with the class thickness measurement requirements for the ship's type and age, then work out which of those spaces can be reached at the bay. The previous survey's report is the starting point: readings that were close to the allowable margin at the last survey are repeated first, because their rate of loss decides the steel list. Spaces with a known coating failure come next, followed by areas the crew has reported as suspect.

Access sets the limits. Ballast tanks must be gas-free and certified for entry, with lighting, ventilation and the ship's enclosed-space procedure in force, and staging or rafting for upper structure is arranged by the ship. Where coatings are sound, readings can be taken through them only if the gauge's through-coating mode has been verified on a coated reference piece; otherwise the plate is cleaned at each point. For bay conditions we add some float to anchorage jobs, because a strong easterly in the Strait can delay a launch or shorten a stay.

What does afloat gauging typically show before a renewal survey?

On bulk carriers the pattern is wastage on hold frames and brackets at the lower ends, pitting on hopper and tank-top plating, and heavy loss on the corrugated bulkhead lower stools where cargo abrasion and corrosion combine. On tankers it is the ballast tanks that surprise owners: coatings that have broken down over the upper strakes and underdeck, with grooving along welds and pitting on bottom plates. Container ships tend to show localised wastage where tanks adjoin heated spaces, plus corrosion on hatch coaming brackets and on the underside of the weather deck.

Each finding is reported as a measured location against the original thickness, so the superintendent can see how far each member is from its limit and which ones are likely to be renewed. The report also lists the spaces that could not be gauged afloat, with a suggested allowance, so the specification does not silently assume the unmeasured steel is sound.

How are Algeciras readings handed over to the docking yard?

The report is laid out so the dock team can pick it up the moment the ship enters. Sketches carry the same frame and strake references the class formats use, and each reading is numbered so the same point can be re-measured in dry dock. Members flagged for likely renewal are listed with location, dimensions and original thickness, ready to be turned into a steel order.

When the dock is at Gibraltar or in the Bay of Cádiz, the same team can mobilise again for the in-dock gauging, which keeps the point numbering unbroken. If the owner prefers a different yard or a firm approved by the ship's society for the class gauging, the Algeciras report still serves as the baseline against which those readings are compared.

Where special survey thickness measurement sits in the survey cycle

Every renewal survey asks for more thickness measurement than the last, and for oil tankers, chemical tankers and bulk carriers the ESP Code adds close-up survey on top. The table is the usual shape of the work; the class rules and the surveyor set the exact extent, which is why the measurement plan for a job at Algeciras is agreed in writing before mobilisation.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

How the job runs at Algeciras

Most of the work on a Algeciras job happens before the team boards: scope, plan and access are settled first, so the time on board goes on measurement.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

The inspection team is mobilised from India for each job; nobody is stationed at the port, so mobilisation is planned against the vessel's schedule and visa lead times. Our founder and Responsible NDT Level III, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has over eleven years of international field experience, plans and supervises the work. Technicians are certified under the company's written practice to ASNT SNT-TC-1A, and the company holds ISO 9001 and ISO 14001 certification.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 for hull surveys and the gauging extents tied to each renewal survey
  • IACS UR Z10.1 and Z10.4 for the enhanced survey of oil tankers and bulk carriers
  • IACS UR Z17 on which firms may measure thickness for credit to a class survey
  • SOLAS chapter XI-1, regulation 2, and the 2011 ESP Code
  • ASTM E797 for manual pulse-echo ultrasonic thickness measurement
  • ASNT SNT-TC-1A for the qualification of the technicians who take the readings

What you receive

  • Steel renewal estimate by member, ready for the yard's quotation round
  • Readings against original thickness with frame and strake references
  • List of members at or near the renewal limit, with trend against the previous survey
  • Schedule of spaces not gauged afloat, with a suggested allowance for the dock
  • Numbered measurement points carried forward for re-measurement in dry dock
  • Gauge calibration records and technician certificates

Industries served

  • Capesize and Panamax bulk carriers
  • Crude and product tankers
  • Container ships with exhaust gas scrubbers
  • Ro-pax ferries on Strait crossings
  • Car carriers (PCTC)
  • Chemical tankers
  • Bunker tankers and barges

Frequently asked questions

Can special survey thickness measurement be done in Algeciras, or must it wait for the dry dock?

Much of it can be done in the bay. Ballast tanks, void spaces, engine-room tanks and deck structure are gauged at a berth or at anchor, while bottom plating and everything below the waterline stays for the dock. The usual approach is to measure what can be reached in Algeciras and leave the remainder to the yard, with the unmeasured areas listed.

Does gauging at Algeciras count towards the renewal survey?

Only when a firm approved by the ship's classification society takes the readings as part of the survey. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS, so for now our readings here serve the owner's own planning. They remain valuable because they size the steel work before yards quote.

How far ahead of the docking should a ship be gauged at Algeciras?

Early enough for the readings to shape the repair specification, but close enough that the steel has not changed much by the time the yard opens the tanks. For most ships that means several months, timed to a lay-by or a bunkering stop when ballast tanks can be entered safely and a team can reach the ship from India.

Which dock do Algeciras ships usually go to for a renewal survey?

Ships passing the bay commonly dock at Gibraltar or in the Bay of Cádiz, although the choice rests with the owner and depends on dock size, availability and the ship's trade. We gauge afloat at Algeciras whichever yard is chosen, and can follow the ship to the dock if the same team is wanted for the in-dock measurements.

What does a ship need to arrange for gauging at anchor in Algeciras Bay?

The agent books a launch and requests terminal or port access, and the ship prepares tanks: gas-free certificates, ventilation, lighting and staging where upper structure is in scope. A margin for weather is sensible, since strong easterlies can delay boarding. We send an access checklist with the measurement plan so nothing is found missing once the team arrives.

Is afloat gauging at Algeciras enough for a fifteen-year tanker?

It is a good start but not the whole job. Tankers at their third renewal survey face wide tank gauging that normally needs cleaned, gas-free cargo tanks and staging, which a dock provides. Readings in the bay still show which tanks are in the worst condition, so the dock gauging can be sequenced to open those first.

Can special survey thickness measurement at Algeciras be credited to a class survey?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.