Maritime inspection · Spain
Ultrasonic Thickness Measurement for Ships and Rigs in Las Palmas
The Port of Las Palmas is the Atlantic stop between Europe, West Africa and South America: a bunkering hub, a base for fishing and reefer fleets, and a ship-repair and lay-up port where drilling rigs and offshore vessels come in from West African fields. Long yard and lay-by stays make it one of the better places in the region for structured gauging. We mobilise technicians from India to Gran Canaria for ships, rigs and offshore units, planned around the yard period or the rig's work window.
Rig and offshore unit gauging
Jack-ups, semi-submersibles and offshore vessels come to Las Palmas between West African contracts. We gauge legs, columns, pontoons and tanks to a plan agreed with class, working under the operator's permits.
Long repair stays, systematic surveys
Repair periods at Astican and lay-ups in the outer harbour give time for tank-by-tank measurement, following the yard's cleaning sequence and adding post-blast confirmation where the surveyor asks for it.
Atlantic bunkering stops
Ships diverting to the islands for fuel can use the stop for targeted readings — a suspect tank, a piping line or pre-purchase sampling — scoped to the hours the ship will actually stay.
Inspection services for ships at Las Palmas
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreLas Palmas: Atlantic bunkering, fishing fleets and rig stays
The Puerto de La Luz y de Las Palmas, run by the Autoridad Portuaria de Las Palmas, sits on the main sea routes between Europe and the South Atlantic and close to the West African coast. That position has made it one of the principal bunkering ports in the eastern Atlantic, with ships diverting from passage to take fuel at the quays or at anchor. Container lines use it to tranship cargo for West Africa and the islands, and it has long been a base for international fishing fleets and the reefers that carry their catch.
The port's second identity is ship repair and lay-up. Drilling rigs, jack-ups and offshore support vessels working off West Africa come to Las Palmas between contracts for maintenance, inspection and stacking, alongside merchant ships taking repair periods at Astican and with the other repair firms in the port. Laid-up merchant ships also wait out weak markets here, sometimes for long periods, and return to service only after surveys that need gauging. In winter the cruise season adds another layer, with ships on Canary Islands and transatlantic itineraries calling regularly. The result is a port where some ships stay for hours and others for weeks or months.
For thickness gauging, the long stays are what matter. A rig stacked between contracts or an offshore vessel in for its renewal survey can be gauged systematically, tank by tank, with time for cleaning, ventilation and access, which makes hull gauging in Las Palmas closer to yard work than to a port call. Fishing vessels and reefers working from the port face hard service — ice, brine, fish-hold wear and long periods at sea — and their owners use the stays here for structural checks. Offshore support vessels, standby vessels and tugs from the West African oil and gas sector use the port for docking and class work as well, while ships stopping only for bunkers offer short windows that suit targeted readings.
Astican, the rig quays and the bunker berths: gauging sites in Las Palmas
Ship-repair work centres on Astican, whose docking facilities handle merchant ships, fishing vessels and offshore units, and on the repair companies that work afloat along the port's quays. In a repair period, gauging is usually the first job: readings in tanks, holds and on external shell set the steel renewal scope, and a second round after cleaning or blasting confirms which areas need cropping and renewal. Reefers and fishing vessels lie alongside the fishing and cold-store quays, where holds, tanks and decks can be gauged between trips.
Rigs and large offshore units lie at lay-by quays in the outer harbour, sometimes for long periods. Work on them needs the operator's permit-to-work system, access to legs, columns, pontoons, preload and ballast tanks, and a measurement plan agreed with class before measuring starts. Rig and offshore work often runs over several weeks, and the number of technicians and the schedule are adjusted as cleaning and access open new areas. For ships at anchor or calling for bunkers, launches are booked through the ship's agent, and the trade winds and Atlantic swell can affect boarding in the outer anchorage, so a margin in the schedule is sensible.
- Astican shipyard — docking and renewal survey gauging of hull, tanks and holds on merchant ships, fishing vessels and offshore support vessels
- Rig lay-by quays in the outer harbour — gauging of legs, columns, pontoons, preload and ballast tanks on jack-ups and semi-submersibles between contracts
- Bunkering berths and anchorage — targeted gauging and pre-purchase sampling on ships stopping for fuel on Atlantic passages
- Fishing and cold-store quays — fish-hold, tank and deck gauging on fishing vessels and reefers between trips
- Container and cruise berths — scrubber and sea-water piping gauging on container ships and winter-season cruise ships during calls
- Afloat repair quays — gauging alongside repair crews so steel renewal and piping replacement can be planned within the same stay
Thickness measurement through the survey cycle at Las Palmas
Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at Las Palmas usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Canary Islands context: flags, fuel rules and the West Africa link
The Canary Islands are part of Spain and of the EU, so Las Palmas applies Spanish port state control under the Paris MoU, EU at-berth sulphur rules, EU ETS for shipping since 2024 and FuelEU Maritime since 2025. No SOx ECA covers the islands' waters, and ships here burn fuel meeting the global sulphur limit at sea or run scrubbers on high-sulphur fuel. Spain's second ship register, the Canary Islands Special Register, takes its name from the islands, and many Spanish-flag merchant ships are entered in it.
Commercially, Las Palmas is tied to West Africa. Offshore drilling and production campaigns in the Gulf of Guinea and off Mauritania and Senegal drive demand for offshore rig inspection and maintenance here, and the periods between contracts are when owners schedule class renewal work on their units. The same link brings ships that have spent long periods in warm, humid trades, where ballast tank coatings and deck structure deteriorate faster, and owners often use a stop in the islands to measure the extent of the damage before deciding where to dock. For a manager whose ship is already in the Atlantic, gauging in Las Palmas can settle that question before the ship heads north to Europe or south again.
Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Las Palmas meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.
Las Palmas gauging work, from bunker calls to stacked rigs
Las Palmas jobs range from a few hours on a bunkering ship to weeks on a stacked rig. The longer the stay, the more systematic the work can be; on rigs and ships in repair periods, the technicians often follow the yard's cleaning sequence, measuring each space as it is released. Each job starts with a measurement plan agreed with the owner and, for survey work, presented to the attending surveyor. Typical requests:
- Rig thickness measurement on a jack-up stacked in the outer harbour between West African contracts: legs, preload tanks and hull structure gauged ahead of its class renewal.
- Renewal survey gauging of an offshore supply vessel docked at Astican, covering bottom shell, ballast and fuel tanks, decks and frames, with post-blast confirmation readings.
- Fish-hold and deck gauging on a reefer or fishing vessel between trips, checking wastage where ice, brine and handling gear have attacked the structure.
- Pre-purchase gauging of a bulk carrier during a bunkering call, sampling deck, hold and ballast tank structure to support a buyer's decision before the ship leaves the islands.
- Reactivation gauging of a merchant ship coming out of lay-up, measuring tanks and piping that have stood idle so that class and the owner can plan the return to service.
How a thickness measurement job runs at Las Palmas
Most of the work on a Las Palmas job happens before the team boards: scope, plan and access are settled first, so the time on board goes on measurement.
Gran Canaria Airport is the entry point, normally reached from India through Madrid or a similar European connection, with a short road transfer to the port. The Canary Islands are in the Schengen area, so technicians travel on Schengen visas, and we fix travel dates once those visas are issued and the yard period or the rig's work window is confirmed. Yard access is arranged with the shipyard, rig access with the operator, and ISPS passes or launches through the ship's agent. Long rig and repair stays usually allow all of this to be planned well ahead.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
The inspection team is mobilised from India for each job; nobody is stationed at the port, so mobilisation is planned against the vessel's schedule and visa lead times. Our founder and Responsible NDT Level III, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has over eleven years of international field experience, plans and supervises the work. Technicians are certified under the company's written practice to ASNT SNT-TC-1A, and the company holds ISO 9001 and ISO 14001 certification.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Jack-up and semi-submersible drilling rigs
- Offshore support vessels
- Fishing vessels and reefers
- Bulk carriers
- Container ships
- Crude and product tankers
- Cruise ships
Frequently asked questions
Can you gauge a drilling rig stacked in Las Palmas?
Yes. We measure hull, deck, leg and column structure and tanks on jack-ups and semi-submersibles using ultrasonic gauges, with magnetic particle testing at nodes and other fatigue-prone details where required. The work is run under the operator's permit-to-work system and to a measurement plan agreed with class, and is usually spread over several weeks as spaces are opened and cleaned.
Is Las Palmas inside an emission control area?
Not at present. The Canary Islands lie outside the Mediterranean and North Sea ECAs, so on passage ships comply with the global sulphur cap through compliant fuel or a scrubber. Alongside in Las Palmas, the EU's in-port sulphur requirement applies unless an equivalent abatement method is in use. Scrubber-fitted container and cruise ships calling here still run their systems on passage, and their piping benefits from regular ultrasonic checks.
Can gauging be done on a fishing vessel between trips?
Yes. Fishing vessels and reefers working from Las Palmas spend short periods alongside between trips, and fish holds, tanks and decks can be gauged then if the crew empties and cleans the spaces in advance. Insulated fish holds limit access to the shell from inside, so we agree with the owner which areas can be reached and whether readings from outside during a docking are needed.
What happens if gauging finds substantial corrosion during a repair period at Astican?
We report the readings against the allowable diminution, marking areas of substantial and excessive corrosion so the surveyor and the yard can agree renewals or additional close-up survey. Because the technicians are already on site, follow-up readings in areas opened up by cropping or blasting can be taken while the yard is still working on them, which keeps the repair period moving.
Does thickness measurement at Las Palmas need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.