Ultrasonic Thickness Gauging for Ferries and Cargo Ships in Portsmouth
Portsmouth International Port sends ro-pax ferries to Normandy, Brittany and northern Spain, runs sailings to the Channel Islands, receives cruise ships and works a cargo terminal, all inside a harbour it shares with the Royal Navy's aircraft carriers. The ferries keep tight timetables, but they return to the same linkspans week after week, and that regularity is what makes gauging here practical. For each job a team travels out from India and works on board in the hours the operator can spare between sailings or before a refit.
Lay-over windows on ro-pax ferries
Ferries on the Normandy, Brittany and Biscay routes often spend a night or a midday gap on the berth. With tanks emptied and ventilated beforehand, the team can gauge ballast tanks, voids and vehicle-deck structure without delaying the next departure.
Ramps, doors and hinge wear
Ro-ro ships calling several times a week put heavy, repeated loads through stern ramps, bow doors, hinges and the deck around them. UT of ramp plating and MPI of hinge lugs and locking devices show where fatigue and wastage are building up.
Refit planning before the winter
Most cross-Channel ferries refit in the quieter months. Readings taken at Portsmouth during the season give the technical department a steel and pipe list to send to the yard, so the refit specification is settled before the ship leaves service.
Inspection services for ships at Portsmouth
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExplorePortsmouth: ferry port, naval harbour and Solent gateway
Portsmouth Harbour opens to the Solent through a narrow mouth between Old Portsmouth and Gosport, where the tide runs hard and ships pass close enough to the Round Tower for people on the walls to read their names. The harbour is a dockyard port, so movements inside it are controlled by the King's Harbour Master, and warships, Isle of Wight ferries and merchant ships share the same channel under one set of rules. Portsmouth International Port, owned by the city council, lies further up the harbour on Portsea Island, beyond the naval base, with linkspans for the ro-ro ferries, a passenger terminal that also handles cruise ships, and berths for cargo. Larger ships plan their passage through the entrance around the tide and the naval programme.
Brittany Ferries is the largest operator, with ro-pax crossings to Caen, Cherbourg, Le Havre and St Malo and longer sailings across the Bay of Biscay to Santander and Bilbao. Ferries for the Channel Islands also leave from here, and cruise ships call on Channel itineraries or begin their cruises in the city. Wightlink runs car ferries and fast catamarans to the Isle of Wight from Gunwharf, inside the harbour mouth, and the hovercraft crosses to Ryde from Southsea beach. On the cargo side, reefer ships bring in fresh produce and short-sea ships handle general cargo at the port's quays. Behind all of it is the naval base, home to the Royal Navy's two aircraft carriers and much of its surface fleet, which gives the harbour a rhythm of its own.
Inspection demand at Portsmouth follows the ferry calendar. Through the busy season the ships run almost without pause, so gauging is done in short slices: an overnight lay-over, a midday gap, a weekly maintenance window agreed with the operator. In the autumn the emphasis moves to pre-refit scopes, because the winter yard period is short and the yard needs its steel list early. Cruise ships and cargo vessels add occasional work during their calls. Ro-pax structure takes a particular kind of punishment, with vehicles loading over ramps several times a day, vehicle decks flexing under laden trailers and ballast shifted to keep the ship level on the linkspan, and that is where most of the readings end up being taken.
Where ships can be gauged in Portsmouth Harbour and the eastern Solent
Most gauging happens at the ferry linkspans and lay-by berths of the international port. A ferry lying overnight gives several hours of steady access: ballast and fresh-water tanks pumped out and ventilated by the crew, voids and cofferdams opened, and vehicle decks clear of traffic so ramps and deck plating can be reached. Work stops when loading begins, so the plan sets out which tanks are done on which visit. Cargo ships at the port's quays are gauged during discharge, with each hold worked as it empties and the hatch covers read while they are open.
The drydocks inside Portsmouth Harbour belong to the naval dockyard, so merchant ships calling here generally go elsewhere for a docking, often to a yard on the Continent or in Spain for the Biscay ferries. That makes Portsmouth a place for in-service and pre-docking gauging rather than for renewal steelwork. Ships waiting to enter can anchor at Spithead or off St Helens on the Isle of Wight, where boarding by launch is possible in settled weather, but a berth is usually only hours away and few owners choose to work at anchor when the quay is so close.
- Continental ferry linkspans — vehicle-deck, ramp and hinge inspection on ro-pax ferries between sailings, timed around loading.
- Lay-by and overnight berths at the international port — staged ballast tank and void gauging over consecutive visits ahead of a winter refit.
- Passenger terminal berth — piping, tank and exterior structure readings on cruise ships during a day call.
- Cargo quays — hold, hatch-cover and tank-top readings on reefer and general cargo ships as cargo comes out.
- Gunwharf and the Isle of Wight ferry berths — shell, deck and piping checks on car ferries and fast craft during maintenance periods.
- Spithead and St Helens anchorages — launch-borne deck and air-pipe readings on ships held outside the harbour.
Thickness measurement through the survey cycle at Portsmouth
How much steel has to be gauged depends on which survey the ship is due for, its type and its age. The pattern below is the usual one under IACS unified requirements; the attending surveyor and the class rules for the ship decide the final extent. For a ship calling at Portsmouth, we agree the programme with the class and the owner before the team mobilises.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Port state control, emissions rules and ferry regulation at Portsmouth
Foreign-flagged ships calling at Portsmouth are inspected by the Maritime and Coastguard Agency, which applies Paris MoU procedures under UK law. For the ferries, a larger regulatory driver is the EU's climate package: voyages between Portsmouth and French or Spanish ports bring half their emissions under the EU Emissions Trading System and half their energy use under FuelEU Maritime, for ships of 5,000 gross tonnage and above. Operators have answered with newer LNG-fuelled and hybrid ships alongside older tonnage fitted with scrubbers, and each brings its own inspection points, from fuel-tank cofferdams to wash-water lines.
Ro-pax ships also live with closer scrutiny of their watertight and weathertight integrity than most cargo ships, because of stability lessons the industry learned the hard way on open vehicle decks. Bow doors, inner ramps, stern doors and their securing arrangements are examined by class, flag and the operator's own superintendents, and wastage or cracking around them is treated seriously. Gauging that tracks plate thickness at ramp hinges, door frames and the vehicle-deck plating nearest the ramps gives the operator evidence to plan renewals rather than react to a surveyor's finding.
Ships trading to Portsmouth are inside a sulphur emission control area, where fuel must not exceed 0.10% sulphur unless an exhaust gas cleaning system (scrubber) is fitted. Scrubber wash-water piping, the overboard discharge and the hull penetration around it are among the fastest-corroding parts of a modern ship, so they belong in the gauging scope at every docking and, on open-loop systems, between dockings.
Typical thickness gauging jobs in Portsmouth
Portsmouth jobs are planned with the ferry operator's technical department, and the scope is cut to fit the time each ship spends alongside. Larger programmes are spread across several calls so that no sailing is delayed, with the same technicians returning each time and the readings tied to one set of frame references. Cruise and cargo ships are handled call by call, with the agent confirming the berth and the hours available. The aim on every job is the same: readings the superintendent can use to decide what to renew, when, and at which yard. These are the jobs we most often plan around this port's timetable.
- Pre-refit steel estimate on a Biscay ro-pax: ballast tanks, voids and vehicle-deck plating gauged across several overnight lay-overs during the autumn.
- Stern ramp, bow door and hinge inspection on a cross-Channel ferry, with UT of ramp plating and MPI on hinge lugs and cleats, done in a midday gap.
- Scrubber wash-water and overboard pipe UT on an older ferry before its refit, so replacement spools can be made ahead of the yard period.
- Hold and hatch-cover gauging on a reefer or general cargo ship discharging at the port's cargo quays.
- Piping and tank readings on a cruise ship during a day call, in an order the chief engineer sets before arrival.
- Condition gauging of an Isle of Wight car ferry ahead of its annual maintenance period.
How a thickness measurement job runs at Portsmouth
The sequence for a thickness measurement job at Portsmouth is short and written down, so the yard, the surveyor and the superintendent know who arranges what.
Heathrow and Gatwick are the usual arrival airports, with trains from London to Portsmouth Harbour station or a drive down the A3; Southampton Airport is closer but has fewer international connections. The international port, the naval-controlled harbour and the ferry berths are all secured areas, so the ship's agent or the operator's port team arranges passes against each technician's passport before the visit. Technicians from India need a UK visa, so we fix the lay-overs we will use well in advance and keep the dates agreed with the operator.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
We send the team from India to the ship for each job rather than keeping staff at the port, and plan the mobilisation around visas and the vessel's itinerary. The work is planned and supervised by the founder, our Responsible NDT Level III (ASNT NDT Level III in UT, RT, MT, PT and VT, with more than eleven years of international field experience). Technicians hold certification under the company's written practice to ASNT SNT-TC-1A; Atlantis is ISO 9001 and ISO 14001 certified.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Ro-pax ferries on Channel and Bay of Biscay routes
- Channel Islands ferries
- Isle of Wight car ferries and fast craft
- Cruise ships
- Reefer ships
- Short-sea general cargo ships
Frequently asked questions
Can a ferry be gauged during an overnight lay-over at Portsmouth?
Yes. A ferry lying overnight at the international port gives several hours of steady access once the last vehicles are off. The crew empty and ventilate the tanks on the agreed list before arrival, the team gauges them in priority order, and work finishes before loading starts. On a full pre-refit scope we spread the tanks over several lay-overs so nothing holds up a sailing.
Is there a drydock in Portsmouth for merchant ships?
The drydocks in Portsmouth Harbour serve the naval dockyard, so merchant ships calling here normally dock elsewhere. What Portsmouth offers instead is regular, predictable time alongside, which suits building a pre-docking steel estimate. The readings go to whichever yard the ship is booked into, on the class formats and with sketches, so the yard can plan the steelwork before the ship arrives.
Do you inspect stern ramps, bow doors and vehicle decks on ro-pax ships?
Yes. These are the areas that take the most repeated loading on a ferry. We measure plate thickness on ramps, door frames and the deck plating around them, and use magnetic particle testing on hinge lugs, cleats and welded brackets where fatigue cracks start. Findings are reported to the superintendent on the day, referenced to the ship's frame numbers.
Can ships be gauged at anchor at Spithead?
It is possible by launch, booked through the agent, when the weather allows safe boarding and the harbour authorities agree. In practice most ships waiting off Portsmouth enter within hours, so we usually wait for the berth, where tanks can be opened and gas-free certification is simpler to arrange. Anchorage time is worth using only for deck, air-pipe and hatch readings that need no tank entry.
Does thickness measurement at Portsmouth need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.