Maritime inspection · France

Ship Thickness Measurement and Hull Gauging in Le Havre

Le Havre is France's largest container port and the Seine estuary's gateway for crude, oil products and ro-ro cargo, so most gauging here is done afloat: at the Port 2000 terminals, on lay-by berths in the inner basins or at anchor in the Baie de Seine. Superintendents call us when a ship needs its tanks and hull structure measured during a call, before a docking at a yard elsewhere. Each job is staffed by a team we mobilise from India to the ship.

Afloat gauging on fixed call windows

Container calls at Port 2000 are short, so the gauging plan is built around berth time: ballast tanks and voids first, holds only where crane work allows, and anything unfinished handed on to the docking yard.

Pre-docking steel estimates

Large ships calling at Le Havre normally dock elsewhere. Gauging during the call gives the superintendent a measured steel renewal list for the yard specification before the ship leaves the Seine estuary.

SECA scrubber piping checks

Le Havre lies inside the North Sea SOx ECA, where scrubber-fitted ships keep their systems running from the Channel approaches to the berth. Wash-water and overboard lines can be gauged while cargo is worked.

Inspection services for ships at Le Havre

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

The port of Le Havre and the ships that call there

Le Havre sits on the north bank of the Seine estuary and is the seaward end of HAROPA PORT, the combined port authority for Le Havre, Rouen and Paris. It is France's largest container port. The Port 2000 terminals, built out into the estuary in front of the older docks, receive the big container ships of the Asia–North Europe and transatlantic services, while the inner basins behind the locks handle ro-ro, conventional cargo, port craft and ships on lay-by. Car carriers, cross-Channel ro-pax ferries to England and a regular programme of cruise calls complete the dry-cargo and passenger picture.

Energy is the port's second pillar. Crude and refined products move through the oil terminals, including the deep-water crude terminal at Antifer on the coast north of the city, and the TotalEnergies refining and petrochemical platform at Gonfreville-l'Orcher stands on the estuary. That puts crude tankers, product tankers and chemical tankers in the same roads as the container ships. Upriver, Rouen's grain terminals load bulk carriers for export, and the offshore wind turbine factory on the port's industrial zone has brought installation and service vessels into the mix.

Container calls at Port 2000 are tightly windowed, so gauging during them is limited to what fits the berth time: a set of ballast tanks, a section of deck structure or targeted readings on a known problem area. Longer windows come from ships waiting for a berth or for orders in the Baie de Seine anchorage, from lay-by stays in the inner basins between charters, and from repair calls at the old port's quays. The dry docks in the old port take small and mid-sized ships only, so the large ships that call here normally dock at yards in other countries. The distinctive demand at Le Havre is therefore pre-docking gauging: readings taken during the call that let a superintendent fix the steel renewal estimate before the ship reaches the yard.

Where thickness gauging is done around Le Havre

At the Port 2000 terminals, thickness gauging at Le Havre is fitted around cargo work. Ballast tanks, voids and the engine room can be entered once the ship's permit-to-work system allows it, but holds under working cranes are off limits, so hold readings are taken only where the chief officer and the stevedores agree a safe sequence. The inner basins are better for heavier scopes: a ship on a lay-by berth, with no cargo operations, can have a full tank programme or renewal-survey gauging worked through without interruption.

Tankers are a separate case. At the oil berths and at Antifer, cargo tanks are not entered during cargo operations and battery-powered instruments on deck in hazardous zones need the terminal's and the ship's permission. Ballast tanks on a laden arrival are usually empty, which makes the anchorage in the Baie de Seine a practical place to gauge them before berthing, weather permitting. For a laden tanker the anchorage reading is often the only chance before docking, because ballast goes in as soon as discharge starts. Rouen, up the Seine, is reached by road on the same mobilisation when a bulk carrier there needs readings.

  • Port 2000 container terminals — targeted gauging of ballast tanks, hatch coamings and cross-deck structure on container ships within the berth window.
  • Inner basins behind the locks — lay-by stays where a full tank programme or renewal-survey gauging can run without cargo operations.
  • Old-port dry docks and repair quays — gauging on ferries, dredgers, port craft and other small and mid-sized ships during docking or repair afloat.
  • Oil terminals and the Antifer crude terminal — ballast-tank and deck gauging on crude and product tankers within the terminal's safety rules.
  • Baie de Seine anchorage — launch-served gauging on ships waiting for a berth or for orders, with laden tankers' empty ballast tanks a common target.
  • Rouen grain terminals on the Seine — hold, hatch cover and ballast-tank gauging on bulk carriers loading grain, reached by road from Le Havre.

Thickness measurement through the survey cycle at Le Havre

Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at Le Havre usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Regulation and market context at Le Havre

France applies port state control under the Paris MoU, and Le Havre's place on the main Asia–North Europe and transatlantic loops brings a steady flow of foreign-flag ships through that regime. Under the Paris MoU's risk-based targeting, older ships with a poor record are inspected more often, and visible wastage, holed air pipes or corroded hatch coamings are the kind of finding that turns an inspection into a detention. Readings taken before a call tell the master and the superintendent where the structure stands before an inspector asks.

Le Havre is inside the North Sea SOx ECA, which takes in the English Channel east of 5°W, so the 0.10% sulphur limit has applied on arrival and departure since 1 January 2015, and the EU ETS (since 2024) and FuelEU Maritime (since 2025) apply to every call. Scrubber-fitted container ships and car carriers run their systems throughout the Channel, and that duty shows up as wall loss in wash-water piping. For tankers at the oil terminals the framework is the ESP regime under SOLAS chapter XI-1 regulation 2 and IACS UR Z10.1 or Z10.4. Container ships are not ESP ships: their gauging follows the hull survey requirements of UR Z7 and their society's rules, with the extent growing at each renewal survey and hatch coamings, deck longitudinals and double-bottom tanks the usual focus.

Ships trading to Le Havre are inside a sulphur emission control area, where fuel must not exceed 0.10% sulphur unless an exhaust gas cleaning system (scrubber) is fitted. Scrubber wash-water piping, the overboard discharge and the hull penetration around it are among the fastest-corroding parts of a modern ship, so they belong in the gauging scope at every docking and, on open-loop systems, between dockings.

Typical thickness gauging jobs in Le Havre

Most Le Havre jobs are scoped around a fixed call window rather than a drydock programme. The superintendent sends the class's gauging requirements or the TM plan, the berth times and any known problem areas; we size the team so the readings that matter are taken before sailing, and the rest are left for the docking yard. Container ship thickness measurement and tanker work make up most requests:

  • Pre-docking gauging of double-bottom and side ballast tanks on a container ship during a Port 2000 call, so the steel renewal estimate is ready before the ship reaches its yard.
  • Wall-thickness checks on scrubber wash-water and overboard piping of a car carrier while it loads, concentrating on bends, reducers and the overboard penetration.
  • A first set of ballast-tank readings on a crude tanker waiting for orders in the Baie de Seine, ahead of the CAP gauging planned for its next docking.
  • On-hire condition gauging of holds, hatch covers and coamings on a bulk carrier before it proceeds up the Seine to load grain at Rouen.
  • Vehicle-deck plating, ramp structure and ballast-tank gauging on a ro-ro ship laid by in the inner basins between charters, ahead of its renewal survey.

How a thickness measurement job runs at Le Havre

A gauging job at Le Havre runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.

Teams fly into Paris Charles de Gaulle and continue to Le Havre by road or rail; Paris-Orly is an alternative for some connections. The ship's agent requests ISPS gate passes for the named technicians at Port 2000 or the oil terminals, and books launch boats for ships at anchor in the Baie de Seine. France is part of the Schengen area, so every technician needs a Schengen visa: we start the applications once the call or docking window is firm and ask the owner or agent for an invitation letter naming the vessel and port. Flights are then planned against the agent's latest ETA.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Container ships
  • Crude and product tankers
  • Chemical tankers
  • Car carriers and ro-ro ships
  • Ro-pax ferries
  • Bulk carriers
  • Cruise ships
  • Offshore wind installation and service vessels

Frequently asked questions

Can you gauge a container ship during a normal Port 2000 call?

Yes, within limits. A container call is a fixed window with cranes working the holds, so we concentrate on spaces that can be entered safely during cargo work: double-bottom and side ballast tanks, voids, the engine room and deck structure clear of the crane lanes. Holds are gauged only where the terminal and the chief officer agree a safe sequence, and anything the window does not allow is passed to the docking yard.

Our ship docks outside France next month. Is it worth gauging at Le Havre first?

Often it is. Readings taken at Le Havre turn the yard specification from an allowance into a measured steel list, which shortens the time spent in dock deciding on renewals. The class surveyor at the yard decides which readings are credited to the survey, so we agree the scope with the superintendent against the surveyor's requirements before starting.

Is scrubber pipe inspection in Le Havre worth doing on a ship that trades in the Channel?

Inside the SECA a scrubber-fitted ship runs its system continuously to meet the 0.10% sulphur equivalent, so wash-water lines, bends downstream of the pumps and the overboard penetration carry acidic flow on every passage. We gauge those lines at fixed grid points, compare against earlier readings where the owner has them and flag wall loss early enough for a spool to be ordered before the next docking.

What ship inspection in Le Havre can be combined with thickness gauging on the same visit?

Magnetic particle or penetrant crack detection at hatch corners, coaming brackets and other fatigue-prone details; UT of welds on recent repairs; and wall-thickness checks on ballast, fuel, sea-water or fire-main piping. On a short call it makes sense to combine them, because the team is already through the gate and the permits are in place.

Does thickness measurement at Le Havre need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.