Maritime inspection · France

Ship Thickness Measurement in Brest's Dry Docks

Brest is a repair port first. The three dry docks of Damen Shiprepair Brest, at the western tip of Brittany close to the Ushant traffic lanes, take LNG carriers, tankers, cruise ships, ferries and bulk carriers that come off their route between the Channel and the Atlantic to dock. Superintendents call us to gauge hull structure and tanks during those dockings, to support CAP on older tankers and to measure ahead of the yard stay. Our team travels from India for each docking, planned against the yard's date.

Large dry docks near the Ushant route

Damen Shiprepair Brest's dry docks take large LNG carriers, tankers and cruise ships close to the Ushant traffic lanes, so ships trading past Brittany can divert for docking with little deviation from their route.

LNG carrier and tanker dockings

Membrane LNG carriers are gauged from the ballast side, tankers through cargo and ballast tanks under the ESP Code. Brest's long, planned dockings suit both of these heavier scopes.

Ahead of the 2028 Atlantic ECA

From September 2028 the Breton coast falls inside the North-East Atlantic ECA and its 0.10% sulphur limit. A docking here before then is the time to gauge scrubber wash-water and overboard piping.

Inspection services for ships at Brest

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

Brest: a repair port on the approaches to the Channel

Brest sits on the Rade de Brest, a large and sheltered natural harbour at the western end of Brittany. Commercially it is a modest cargo port, handling agricultural bulk and general cargo for the region, and much of the roadstead belongs to the French Navy, whose Atlantic base is here. What brings deep-sea merchant ships to Brest is ship repair. The commercial port's dry docks, operated by Damen Shiprepair Brest, are large enough to take the biggest LNG carriers, crude tankers and cruise ships, and they are the reason a VLCC or a membrane LNG carrier is seen in a Breton harbour at all.

Location is the yard's commercial argument. Brest lies close to the Ushant traffic separation scheme, through which traffic between the Channel and the Atlantic passes, so a ship trading between northern Europe and the Atlantic, the Mediterranean or West Africa can come off its route for a docking with relatively little deviation. The yard's own list of the ships it docks runs from LNG carriers, crude, product and shuttle tankers to cruise ships, ferries, bulk carriers, container ships and offshore rigs, and it has carried out a long series of cruise ship refits. The combination of LNG carriers and older tankers is what gives Brest its particular gauging profile.

Because the work is docking-led, the gauging windows are long and planned: a ship arrives at the repair quay or the roadstead, enters dock on a booked date, and stays for the length of the repair specification. That makes Brest suited to the heavier scopes, such as renewal-survey gauging on tankers at their third or fourth renewal, CAP gauging that needs cargo tanks gas-free and staged, and LNG carrier dockings where ballast tanks, the inner hull and deck structure are measured from the ballast side. Ships waiting in the Rade or at the repair quay for their dock slot also give time for pre-docking readings, so that the steel list is fixed before the dock is flooded down.

Where gauging takes place in Brest

The three dry docks of Damen Shiprepair Brest are in the commercial port, with repair quays alongside for work afloat before and after docking. Ultrasonic thickness gauging in Brest is mostly done in these docks: the ship is dry, tanks are cleaned and ventilated for the repair contractors, and staging or access equipment is already in place for the yard's steelwork. The gauging team works to the yard's sequence, measuring tanks as soon as they are released and reporting by compartment so that renewal decisions are made early in the stay rather than in its last days.

The repair quays and the Rade anchorage are the other locations. A tanker or LNG carrier waiting for its dock slot can be gauged in its ballast tanks and on deck while alongside the repair quay or at anchor, so the steel list is known before the ship enters the dock. Weather counts in Brest: Atlantic depressions coming in past Ushant can halt launch work in the roadstead, and the yard's programme, not the team's travel plan, sets the date the work starts.

  • Damen Shiprepair Brest dry docks — docking and renewal-survey gauging of shell, tanks and internal structure on LNG carriers, tankers, cruise ships and bulk carriers.
  • Repair quays of the commercial port — pre-docking and post-docking gauging afloat, including ballast tanks and deck structure, while the ship waits for or leaves the dock.
  • Rade de Brest anchorage — launch-served readings on ships waiting for a dock slot, subject to Atlantic weather in the roadstead.
  • LNG carriers in dock — gauging of ballast tanks, the inner hull from the ballast side, cofferdams and deck structure during the docking.
  • Cruise ships and ferries in dock — gauging of shell plating, tanks and vehicle or open decks alongside the yard's refit and steel programme.

Thickness measurement through the survey cycle at Brest

Every renewal survey asks for more thickness measurement than the last, and for oil tankers, chemical tankers and bulk carriers the ESP Code adds close-up survey on top. The table is the usual shape of the work; the class rules and the surveyor set the exact extent, which is why the measurement plan for a job at Brest is agreed in writing before mobilisation.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

ECA boundary, port state control and Brest's place on the route

Brest is a useful reminder that the North Sea ECA has a western edge. Its limit in the Channel approaches runs along 5°W and 48°30'N, and Brest lies just south of that line, so a ship arriving from the Channel leaves the 0.10% sulphur area near Ushant. That changes in 2028. IMO adopted the North-East Atlantic ECA at MEPC 84 in 2026, covering the waters off France's Atlantic coast among others, with entry into force on 1 September 2027 and the 0.10% sulphur limit applying twelve months later. For scrubber-fitted ships docking at Brest, the coming ECA is a reason to have wash-water and overboard piping gauged while the ship is dry.

France is a Paris MoU state, and a ship leaving a Brest docking with its steel renewed and its readings on file is in a stronger position at its next port state control inspection. For tankers, a Brest docking often coincides with a renewal survey under the ESP Code: IACS UR Z10.4 for double-hull oil tankers and Z10.3 for chemical tankers set out the gauging and close-up survey, which grow sharply from the third renewal survey at about 15 years. Older tankers facing vetting can add CAP gauging to the same stay; once a tanker is past about 15 years, charterers and oil-major vetting departments frequently expect it. LNG carriers are not ESP ships; their hull gauging follows UR Z7 and the classification society's rules for gas carriers.

Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Brest meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.

Typical thickness gauging jobs in Brest

Almost every Brest job is tied to a dock booking, so the scope is known well ahead and the main variables are the yard date and the condition found. We work from the repair specification, the class's survey requirements and any previous gauging report, and size the team so readings keep pace with the yard. Requests for renewal survey gauging in Brest typically look like this:

  • Fourth renewal survey gauging on a double-hull crude tanker in dock, covering cargo and ballast tank structure under the ESP Code, with close-up survey support for the attending surveyor.
  • CAP gauging in Brest on a product tanker over 15 years old, combined with its docking so cargo tanks are gas-freed and staged only once.
  • LNG carrier drydock gauging: ballast tanks, cofferdams and the inner hull of a membrane ship during its intermediate docking, all measured from the ballast side.
  • Pre-docking gauging at the repair quay on a bulk carrier, so the steel renewal estimate for holds and hopper tanks is ready on the day it enters dock.
  • Shell, tank and open-deck gauging on an expedition cruise ship during a refit, alongside the yard's steel and hotel work.
  • Scrubber wash-water and overboard piping gauging while a ship is in dock, ahead of the North-East Atlantic ECA sulphur limit in 2028.

How a thickness measurement job runs at Brest

The sequence for a thickness measurement job at Brest is short and written down, so the yard, the surveyor and the superintendent know who arranges what.

Brest Bretagne Airport has connections from Paris, so the usual route is an international flight to Paris Charles de Gaulle followed by a domestic flight or a high-speed train to Brest. The yard and the ship's agent arrange access to the commercial port and the dry docks; the naval areas of the Rade are closed to civilians and play no part in the job. France is a Schengen state, so each technician needs a Schengen visa before travel, and we apply once the dock date is confirmed, with an invitation letter from the owner or yard naming the ship. If the dock date moves, the team's travel moves with it.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

We send the team from India to the ship for each job rather than keeping staff at the port, and plan the mobilisation around visas and the vessel's itinerary. The work is planned and supervised by the founder, our Responsible NDT Level III (ASNT NDT Level III in UT, RT, MT, PT and VT, with more than eleven years of international field experience). Technicians hold certification under the company's written practice to ASNT SNT-TC-1A; Atlantis is ISO 9001 and ISO 14001 certified.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • LNG carriers
  • Crude and product tankers
  • Shuttle tankers
  • Cruise ships
  • Ro-pax ferries
  • Bulk carriers
  • Container ships
  • Offshore units

Frequently asked questions

Is Brest inside the SOx ECA?

Not at present. The North Sea ECA's boundary in the Channel approaches runs along 5°W and 48°30'N, and Brest lies just south of it. The North-East Atlantic ECA adopted at MEPC 84 in 2026 will bring the Breton coast inside an ECA: it enters into force on 1 September 2027, with the 0.10% sulphur limit applying from September 2028.

Can you gauge an LNG carrier's inner hull during a Brest docking?

Yes, from the ballast side. On membrane LNG carriers the cargo tanks are lined, so the inner hull is measured from the ballast tanks and cofferdams, together with the outer shell, double bottom and deck structure. We plan the sequence with the yard so that ballast tanks are gauged as soon as they are ventilated and certified safe for entry, and report by tank so repairs can be decided in dock.

Can gauging start before the ship enters dock?

Often it should. A ship waiting at the repair quay or in the Rade for its dock slot can have ballast tanks and deck structure gauged in advance. Those readings let the superintendent confirm the steel list with the yard before docking, so the dock days are spent on repairs rather than on finding out what needs renewing.

What happens if the dock date at Brest slips?

Dock dates move, and the plan allows for it. Once the Schengen visas are issued, the team's flights are booked against the yard's latest confirmed date and changed if it moves. Telling us early about a slip, or about extra scope the yard has found, matters more than a perfect initial schedule, because it lets us adjust the team size as well as the dates.

Does thickness measurement at Brest need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.