Maritime inspection · United Kingdom
Thickness Gauging for Ships at Port Talbot's Deep-Water Harbour
Port Talbot's tidal harbour was built beside the steelworks to take the large ore and coal carriers that fed its blast furnaces. The furnaces closed in 2024, and the harbour is now between two lives: an electric arc furnace is being built at the works, and a floating offshore wind port is planned for the Celtic Sea. The ships calling in the meantime are of more varied types than the ore carriers of the past. When one needs gauging, technicians travel from India to the berth, and a docking can be arranged nearby at Swansea.
A deep harbour beside the works
The tidal harbour was designed for large bulk carriers berthing directly beside the steelworks, with no lock to pass. Ships alongside here can be gauged during cargo work, holds first as they empty, then hatch covers and ballast tanks.
Swansea Dry Docks across the bay
A ship found at Port Talbot to need steel renewal can be docked at Swansea, across the bay. Readings taken at the harbour go to the yard in advance, so plate is ordered and the work planned before the ship shifts berth.
Ready for the floating wind fleet
If the planned floating offshore wind port goes ahead, heavy-transport ships, tugs and construction vessels will use the harbour. We gauge hull, tanks and deck structure on that kind of vessel and crack-test sea-fastening points and deck fittings.
Inspection services for ships at Port Talbot
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExplorePort Talbot: a steelworks harbour in transition
Port Talbot stands on the eastern side of Swansea Bay, where the steelworks stretches along the shore between the town and the sea. Its tidal harbour, enclosed by breakwaters and open to the bay without a lock, was built so that large bulk carriers could bring iron ore and coal straight to the works, and for decades the harbour, owned by Associated British Ports, was the gateway for the raw materials of iron-making in the town. The Bristol Channel's big tides run through it, and the harbour is more exposed to weather from the south-west than the locked docks along the coast at Swansea and Cardiff, which a ship's master and the pilots plan around.
That role ended in 2024. Tata Steel closed the last blast furnace at the end of September, ending more than a century of primary steelmaking in Port Talbot, and construction of an electric arc furnace began in July 2025, with completion expected by the end of 2027. The works has kept its downstream mills going in the meantime, and the harbour's traffic has changed with it: the procession of large ore and coal carriers has stopped, and the ships now using the harbour are more varied. The Celtic Freeport, covering Port Talbot and Milford Haven, has had its final business case approved, and the harbour sits at the centre of plans for floating offshore wind.
In March 2026 the UK Government and ABP agreed terms for public funding, alongside ABP's own investment, to develop the harbour as a manufacturing, assembly and marshalling hub for gigawatt-scale floating wind projects from the Celtic Sea leasing round, subject to clearance by the Competition and Markets Authority. If that goes ahead, the harbour's fleet will change again: heavy-transport ships, anchor-handling tugs, construction and cable vessels and the barges that move large components. For now, gauging at Port Talbot is opportunistic, built around the ships that call and around the docking capacity a short distance away at Swansea, and each job is planned once the call is confirmed.
Where ships can be gauged at Port Talbot
Gauging at Port Talbot is done alongside the harbour's deep-water berths, during cargo operations or while a ship waits for orders. A bulk carrier discharging there can have its holds gauged as each one empties, with side shell, frames, hopper and topside tank plating, tank top and bulkheads in reach of the team; hatch covers and coamings are done when they are open, and ballast tanks once the crew can release them. The harbour sits within an industrial area, so access, vehicle movements and hot-work rules follow the port operator's site controls, which the ship's agent arranges in advance of the visit.
There is no drydock at Port Talbot. The nearest is Swansea Dry Docks, across the bay, with two graving docks that take short-sea bulk carriers, tugs and dredgers; larger ships go to a bigger yard elsewhere. Ships waiting to enter Port Talbot anchor in Swansea Bay, where a launch can put a team aboard in quiet weather, though the bay's exposure to the south-west and the strong tidal streams of the Bristol Channel mean anchorage work needs a margin in the plan. Most owners choose to gauge once the ship is alongside, where conditions are predictable and tank entry can be organised properly.
- Deep-water harbour berths — hold, hatch-cover and ballast tank gauging on bulk carriers during discharge or loading.
- Lay-by time alongside — fuller scopes on ships waiting for orders or for the next cargo.
- Swansea Bay anchorage — deck, coaming and air-pipe readings by launch, in settled weather.
- Swansea Dry Docks, across the bay — docking and renewal-survey gauging for ships that need steel renewed.
- Future floating wind quays — hull, tank and deck-structure inspection on heavy-transport and installation vessels, as that work develops.
Thickness measurement through the survey cycle at Port Talbot
Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at Port Talbot usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Port state control, the freeport and a new fleet for the Celtic Sea
Foreign-flagged ships calling at Port Talbot are subject to port state control by the Maritime and Coastguard Agency, which follows Paris MoU procedures under UK law. Bulk carriers that have spent their lives carrying ore and coal are typical inspection targets: coal cargoes leave acidic residues that eat into hold plating, frames and tank tops, and the hopper and tank-top structure of ore carriers takes heavy grab damage. An owner sending such a ship to Port Talbot with recent gauging on board, and a plan for the thin areas, gives an inspector little to question.
The floating wind plans bring vessels that sit under different rules from cargo ships. Heavy-transport ships carrying floating foundations, anchor handlers laying moorings and construction vessels are classed under their own notations and inspected by their operators to demanding project standards, and the developers' marine warranty surveyors want evidence that deck structure, sea-fastening points and towing gear are sound before a tow begins. Thickness gauging of deck plating under heavy loads and crack detection on welded fittings are part of that evidence. Until the new port is built, the work here will remain the steady, smaller business of gauging the ships that already call.
Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Port Talbot meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.
Typical thickness gauging jobs at Port Talbot
Work at Port Talbot depends on what is calling, and we plan each job with the superintendent and the ship's agent once the berth and stay are confirmed. Most jobs today are in-service gauging on cargo ships alongside, often as preparation for a survey or a docking elsewhere. As the floating wind project moves forward, we expect offshore vessels to add a second strand of work. Where the readings point to steel renewal, the obvious next step is a docking across the bay at Swansea, and we pass the figures to the yard in a form it can plan from. These are the jobs we expect to see most often.
- Hold, hopper and tank-top gauging on a bulk carrier during discharge, focused on cargo-related wastage and grab damage.
- Pre-docking steel estimate on a ship due to dock at Swansea, taken at Port Talbot before it shifts across the bay.
- Hatch cover and coaming gauging on a project or steel cargo ship alongside the harbour berths.
- Owner's condition gauging on a ship waiting for orders, using the time alongside for ballast tanks and deck structure.
- Deck plating gauging and MPI of sea-fastening points on a heavy-transport or offshore vessel, as floating wind activity grows.
How a thickness measurement job runs at Port Talbot
A gauging job at Port Talbot runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.
Cardiff Airport is the closest international airport, with Bristol Airport as an alternative; most teams fly into Heathrow and take the train from London Paddington to Port Talbot Parkway. The harbour is a controlled port inside an industrial area, so the ship's agent arranges passes and any site induction before the visit. Technicians are mobilised from India on UK visas, and because calls at Port Talbot are irregular, we plan with a margin around the expected arrival and keep visas current for owners who use the harbour often.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Bulk carriers
- Steel and project cargo ships
- General cargo ships
- Heavy-transport and semi-submersible ships
- Anchor-handling tugs and offshore vessels
- Harbour tugs and workboats
Frequently asked questions
Is Port Talbot still a working harbour after the blast furnaces closed?
Yes. The harbour remains open under Associated British Ports, though its traffic has changed now that iron ore and coal no longer arrive for the furnaces. Ships still call, and the harbour is the focus of the Celtic Freeport and of plans for a floating offshore wind port. We gauge whatever is calling, on the owner's or manager's instructions, during its time alongside.
Where would a ship calling at Port Talbot go for a drydock?
The nearest drydocks are at Swansea Dry Docks, across the bay, which take short-sea bulk carriers, tugs and dredgers. Larger ships dock at a bigger yard elsewhere in the UK or abroad. Either way, gauging at Port Talbot before the ship leaves gives the yard a list of plate and pipe to renew, so the docking can be planned and material ordered in advance.
Can holds be gauged during discharge at Port Talbot?
Yes, hold by hold, once each is empty and safe to enter. The team gauges side shell, frames, hopper and topside tank plating and the tank top, paying close attention to areas damaged by grabs or thinned by corrosive cargo residues. Hatch covers and coamings are done while open, and ballast tanks after the crew issue entry permits.
Will you inspect vessels for the Celtic Sea floating wind projects?
Yes, as that work begins. Heavy-transport ships, anchor handlers and construction vessels need deck plating, tank structure and sea-fastening points checked before demanding operations, and operators often want readings before a project mobilisation. We gauge hull, tanks and deck structure and crack-test welded fittings by magnetic particle or dye penetrant, planned with the operator around the vessel's project schedule.
Does weather in Swansea Bay affect gauging at Port Talbot?
Alongside, very little: the harbour's breakwaters give working shelter, and the inspection carries on in most conditions. At anchor in the bay it matters more, because south-westerly winds and strong tidal streams can make launch transfers unsafe. We plan anchorage work only for short, deck-level scopes, keep a weather margin, and move the work alongside if conditions turn.
Does thickness measurement at Port Talbot need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.