Maritime inspection · United Kingdom

Ultrasonic Thickness Measurement for Ships in Cardiff's Locked Docks

Cardiff's commercial docks sit behind a sea lock on the Severn estuary, where the tidal range is among the largest in the world. Inside, steel, forest products, containers, marine sand and liquid bulks keep general cargo ships, small bulk carriers, dredgers and coastal tankers alongside in level water, which is good ground for gauging. Atlantis keeps no staff in Wales: for each job, technicians fly in from India and work on board while the ship discharges, loads or waits for her next cargo.

Level water behind the sea lock

The dock water is held at a constant height while the estuary outside rises and falls through its enormous range. A ship moored inside lies quietly against the quay, so gangways, ladders and tank access stay where they were put for the whole working day.

Dredgers and coastal tankers on repeat

Marine aggregate dredgers landing Bristol Channel sand, and small tankers carrying liquid bulks, come back to Cardiff on short cycles. Their hoppers, pump lines and tank structure wear quickly, and frequent calls allow a gauging scope to be shared out over several visits.

Steel and timber ships working holds

Ships handling steel or forest products often spend several days in the docks, opening holds one after another. That sequence suits gauging hold frames, tank tops and hatch coamings as each hold is cleared, well ahead of the ship's next docking.

Inspection services for ships at Cardiff

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

Cardiff docks: a locked harbour on the Severn estuary

Cardiff stands on the northern shore of the Severn estuary, where it widens into the Bristol Channel, and the rise and fall of the tide here is one of the greatest anywhere on earth. Ships cross wide sandbanks and mudflats through buoyed channels, take a pilot, and enter the docks through a sea lock that deeper-draught vessels can only use within a window around high water. Inside, they lie in Queen Alexandra Dock or Roath Dock, the two remaining commercial basins of a system that before the First World War exported more coal than any other port in the world. Much of the old waterfront has since become Cardiff Bay, held at a fixed level by the barrage finished at the end of the 1990s. Associated British Ports runs the commercial docks as one of its five South Wales ports, together with Newport, Barry, Port Talbot and Swansea.

Today's trade is mixed rather than dominated by one cargo. Steel products move through the quays for the steel industry in and around the city, forest products and timber arrive for the building trade, and a container terminal handles short-sea and feeder services. Aggregate dredgers bring sand won from the bed of the Bristol Channel to the wharves, liquid bulks are handled for fuel and industrial customers, and project and heavy-lift cargoes pass through for energy and construction work. The ships carrying this trade are mostly modest in size: multipurpose and general cargo ships, handy-sized bulk carriers, container feeders, coastal tankers and dredgers. The lock sets the upper limit on size, so the largest bulk carriers in the estuary use other berths, while the short-sea fleet that does come returns frequently and is run by managers spread across northern Europe.

The tide shapes the whole call at Cardiff. A ship that misses her lock window waits outside until the next high water, and those hours can be used for deck work only if a launch can reach her safely. Inside the docks the level does not move with the estuary, so cargo work and gauging continue through the tidal cycle and moorings need no constant tending. Winter gales funnel up the Bristol Channel from the Atlantic and can hold ships outside for a day or more, and estuary fog occasionally delays pilotage. For a superintendent, the practical rule is to plan around the lock schedule the agent provides: board once the ship is inside, finish the priority readings before her departure window, and treat any time at anchor as a bonus rather than the core of the job.

Where a ship can be gauged at Cardiff

Almost all gauging at Cardiff happens alongside inside the enclosed docks. A general cargo ship discharging steel or timber gives access to holds as they empty, and the crew can open, ventilate and test ballast tanks while cargo work carries on elsewhere on board. Container feeders and tankers turn round faster, so their scopes concentrate on engine-room and ballast piping, the upper deck and tanks prepared before arrival. The dock estate is ISPS-controlled, and the agent obtains gate passes for the team and its equipment in advance.

Cardiff is a cargo port, not the place most ships go for a drydocking. When a renewal survey needs the hull dry, owners of short-sea ships in the Bristol Channel usually book a yard elsewhere, for example the drydocks at Swansea further west, or the larger repair yards on the Mersey and in Cornwall. Gauging at Cardiff in the weeks before that docking is a common way to settle the steel list early, so the yard can order plate and plan staging before the ship arrives. Ships waiting in the docks between charters, or laid up briefly, give longer windows still.

  • Queen Alexandra Dock and Roath Dock quays — hold, tank and deck gauging on steel and forest-product ships during cargo work.
  • Container terminal berth — piping, upper-deck and prepared-tank readings on feeder ships within their turnaround.
  • Aggregate wharves — hopper, suction-pipe and hull plating gauging on sand dredgers between trips.
  • Liquid bulk berths — deck and pipework measurements on coastal tankers under the terminal's permit rules.
  • Lay-by berths inside the docks — fuller condition surveys on ships awaiting cargo or briefly laid up.
  • Outer anchorage — short deck-level scopes by launch while a ship waits for the lock, weather permitting.

Thickness measurement through the survey cycle at Cardiff

How much steel has to be gauged depends on which survey the ship is due for, its type and its age. The pattern below is the usual one under IACS unified requirements; the attending surveyor and the class rules for the ship decide the final extent. For a ship calling at Cardiff, we agree the programme with the class and the owner before the team mobilises.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Port state control, ship recycling rules and the Bristol Channel fleet

Foreign ships at Cardiff are inspected by the Maritime and Coastguard Agency, which applies Paris MoU procedures through UK legislation. The older general cargo ships and bulk carriers that make up much of the Bristol Channel short-sea trade are the kind the risk-based targeting system tends to select, and a detention for structural wastage disrupts a voyage far more than a planned gauging programme would. Owners should also remember that the UK kept the EU ship recycling rules in its own law after Brexit, so ships calling here are expected to carry an Inventory of Hazardous Materials, and keeping the IHM current often prompts a wider look at structural condition.

Many of the ships calling at Cardiff fly open-registry or northern European flags and are managed from Hamburg, Rotterdam, Limassol or further afield, so the superintendent rarely sees the ship at the quay. That is where dependable readings taken by a third party earn their place: owner's condition gauging before a charter, or a pre-docking estimate that reaches the owner before the yard's quotation. Dredgers and coastal tankers trading only in UK waters are a different case, with crews who know the ship well and owners who prefer maintenance planned around a seasonal workload rather than a deep-sea charter.

Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Cardiff meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.

Thickness gauging jobs that come up at Cardiff

Cardiff jobs are usually planned around a cargo call rather than a yard stay. The superintendent sends the ship's TM plan or the surveyor's list, the agent confirms the berth and the expected time inside the lock, and the team gauges while the ship works. Some scopes are full pre-docking surveys spread across a long discharge; others are focused checks on one area a surveyor or crew member has flagged. Repeat callers such as dredgers and coastal tankers allow a programme to be divided across several visits, which is usually easier on the crew than one concentrated effort, and the readings from each visit are added to one running record.

  • Pre-docking gauging on a multipurpose ship discharging steel: hold frames, tank top and side shell measured so the docking yard has a steel list in advance.
  • Second renewal survey preparation on a forest-product carrier, with ballast and double-bottom tanks opened while timber is landed.
  • Hopper plating, suction pipe and hull gauging on a marine aggregate dredger between sand deliveries.
  • Owner's condition survey of a coastal product tanker covering deck, cargo and ballast piping and accessible tank structure.
  • MPI on hatch-cover cleats, crane pedestals or lashing points reported cracked by the crew of a project cargo vessel.

How a thickness measurement job runs at Cardiff

A gauging job at Cardiff runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.

The usual route is a long-haul flight into London Heathrow and the train from London to Cardiff Central, which leaves the team a short drive from the dock gates; Cardiff Airport and Bristol Airport offer some European connections. Technicians from India travel on UK visas, so the lead time for a first visit runs to weeks, and repeat jobs move faster once visas are held. The ship's agent arranges ISPS gate passes, confirms the lock time and, if anchorage work is planned, books a launch.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • General cargo and multipurpose ships
  • Handy-sized bulk carriers
  • Forest-product carriers
  • Container feeder ships
  • Marine aggregate dredgers
  • Coastal product tankers
  • Project and heavy-lift ships

Frequently asked questions

Can a ship be gauged while it waits for the lock at Cardiff?

Sometimes, but only for a limited deck-level scope. A ship waiting off the port for the next high water can be boarded by launch if the agent and the master agree the weather is suitable, and the team can then measure air pipes, deck plating and hatch coamings. Tank work is far better left until the ship is inside the docks, where the water stays level and the crew can ventilate and certify spaces without a lock window counting down.

Is there a drydock at Cardiff for a renewal survey?

Cardiff is not where we would plan a renewal docking. Owners of ships trading in the Bristol Channel normally dock elsewhere in South Wales or at larger yards on the Mersey or in Cornwall. What Cardiff offers is time alongside before that docking: we gauge hull, tanks and holds during cargo work, so the steel list, plate quantities and staging plan are ready when the ship reaches the yard.

Can sand dredgers be gauged between trips at Cardiff?

Yes. Aggregate dredgers return to the wharves often and discharge quickly, so the scope is split over several calls. Hopper plating, the suction pipe and its fittings, pump-room piping and the ballast tanks all wear heavily from abrasive sand and seawater, and gauging them in stages shows the owner how wastage is progressing rather than giving a single snapshot just before docking.

Do the Severn tides limit how long the team can work on board?

Inside the docks they do not, because the lock holds the water level and work continues through the tide. The tide matters for arrival and departure, since a ship can only use the lock within a window around high water. We plan boarding for after the ship is safely moored inside and finish the priority readings well before her outbound lock time, which the agent confirms the day before.

Does thickness measurement at Cardiff need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.