Maritime inspection · United Kingdom

Thickness Measurement for Tankers and LNG Carriers at Milford Haven

Milford Haven is one of the UK's principal energy ports: a deep, sheltered waterway in Pembrokeshire with a refinery, two LNG import terminals and fuel storage along its shores. The ships here are crude and product tankers and some of the largest LNG carriers afloat, working to the standards of terminals and oil-major vetting. Our technicians travel from India to Pembrokeshire to provide the gauging tanker managers need for CAP, ESP renewal surveys and vetting.

Tanker gauging for CAP and vetting

Crude and product tankers serving the refinery and terminals face CAP requests, SIRE 2.0 vetting and terminal acceptance checks. We gauge cargo and ballast tank structure, deck and piping to the scope each one requires.

LNG carriers outside the containment

At South Hook and Dragon LNG the work on LNG carriers covers ballast tanks, double-hull spaces, cofferdams and the trunk deck, following the ship's own entry and gas-detection procedures.

Work where the terminal allows

Jetty time is limited by terminal rules during cargo transfer, so we plan piping and released deck areas alongside, and leave tank structure for anchorage time or a gas-free window.

Inspection services for ships at Milford Haven

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

Milford Haven: an energy waterway in Pembrokeshire

Milford Haven is a long, deep natural harbour opening to the sea at St Ann's Head in the south-west corner of Wales, and its sheltered depth is why the oil industry chose it. The Port of Milford Haven manages the waterway, whose shores today carry Valero's Pembroke refinery, the South Hook and Dragon LNG import terminals, and fuel storage terminals that receive and distribute refined products. Irish Ferries runs from Pembroke Dock to Rosslare, and the port's Milford Dock and Pembroke Port quays handle fishing, cargo and offshore renewable-energy work.

The traffic is dominated by energy carriers. Crude and product tankers serve the refinery and the storage terminals; LNG carriers, including the large Q-Flex and Q-Max classes built for Qatari exports, discharge at South Hook; and LNG carriers from a range of sources call at Dragon LNG. These ships are run by managers who answer to oil-major vetting, terminal acceptance criteria and, for much of the LNG fleet, long-term charterers with exacting maintenance expectations of their own. For those managers a Milford Haven call is rarely a casual stop: berth slots are planned well ahead, which is exactly what makes them usable for gauging.

Ships do not linger at the jetties: a tanker or LNG carrier discharges and sails, and terminal safety rules limit what contractors can do on deck during cargo transfer. The gauging windows come instead from waits at anchor before berthing, from tank cleaning and gas-freeing between cargoes, and from managers using a predictable Milford Haven call to get readings ahead of a renewal survey, a CAP assessment or a vetting inspection. Inspection demand is narrower than at a general cargo port but technically deeper: cargo and ballast tank structure on ageing tankers, cargo and ballast piping, deck structure and vent systems, and on LNG carriers the ballast tanks, double hull and trunk deck that surround the cargo containment.

Jetties, anchorages and quays on the Haven

Tanker inspection at Milford Haven jetties is done under the terminal's rules. That means an agreed permit, terminal requirements on the equipment that may be taken into hazardous areas, and restrictions during cargo transfer, so in-service gauging alongside concentrates on what can be done safely: engine-room and ballast piping, structure in the accommodation and machinery areas, and deck areas the terminal releases. The ship's own permit system runs in parallel, and both have to agree before a tank lid is opened.

Ships waiting to berth anchor in the approaches or within the Haven, and that is where much of the deck and tank work is best done, reached by launch through the ship's agent. A tanker that has completed tank cleaning at anchor can have cargo and ballast tanks gauged in sequence without the clock of a jetty slot. Pembroke Dock and Milford Dock give ordinary quay access for ferries, offshore vessels and smaller cargo ships, where routine in-service gauging is straightforward. Pembroke Dock ferry inspection fits around the Rosslare timetable, with the crew preparing vehicle-deck areas and tanks before the ship berths.

  • Valero Pembroke refinery jetties — engine-room, ballast and accessible deck piping gauging on crude and product tankers under the terminal's permit system.
  • South Hook LNG terminal — ballast and piping checks on large LNG carriers, planned within the terminal's rules around the discharge.
  • Dragon LNG terminal — LNG carrier gauging planned with the terminal and the ship's manager around the discharge window.
  • Anchorages in and off the Haven — launch-borne deck, vent and tank gauging on tankers waiting for a berth or after tank cleaning.
  • Pembroke Dock ferry berth — vehicle-deck, ramp and ballast tank checks on the Rosslare ro-pax, worked around its timetable.
  • Pembroke Port and Milford Dock quays — in-service gauging on offshore renewable support vessels and cargo ships alongside.

Thickness measurement through the survey cycle at Milford Haven

Every renewal survey asks for more thickness measurement than the last, and for oil tankers, chemical tankers and bulk carriers the ESP Code adds close-up survey on top. The table is the usual shape of the work; the class rules and the surveyor set the exact extent, which is why the measurement plan for a job at Milford Haven is agreed in writing before mobilisation.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Tanker vetting, sulphur rules and port state control at Milford Haven

For tanker managers, the regulatory picture at Milford Haven is dominated by the ESP regime and by vetting. Oil tankers fall under the Enhanced Survey Programme of SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code, and from the third renewal survey onwards the extent of cargo and ballast tank gauging grows sharply. Oil-major vetting under OCIMF's SIRE 2.0 regime and charterers' requests for a CAP rating on tankers over about fifteen years old add commercial pressure, and the terminals on the Haven apply their own acceptance criteria before a ship is allowed alongside.

Milford Haven sits outside the North Sea Emission Control Area, so ships may burn 0.50% sulphur fuel on passage, though at berth in the Haven, as in every UK port, a stay of two hours or more requires 0.10% fuel. That changes at sea on 1 September 2028, when the North-East Atlantic ECA adopted in 2026 applies the 0.10% limit in the waters west of the UK. The Maritime and Coastguard Agency inspects foreign ships on the Haven, following Paris MoU procedures under UK law since Brexit. Tankers arriving from Rotterdam, Antwerp or other EU ports have half of those voyages counted under the EU ETS.

Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Milford Haven meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.

Typical thickness gauging jobs at Milford Haven

Thickness gauging at Milford Haven is mostly tanker and gas-carrier work, planned around discharge, tank cleaning and the time a ship spends at anchor. Every job is agreed with the manager and, where it touches a jetty, with the terminal through the agent. The scenarios below are the ones that recur in an energy port of this kind, and each is shaped by when the ship can be made safe for entry.

  • CAP gauging for tankers: a product tanker past fifteen years, gauged at anchor after tank cleaning, so the class society's CAP assessment has current readings to work from.
  • ESP renewal survey gauging on a crude tanker due its third renewal survey: pre-docking readings taken at Milford Haven to fix the steel list before the yard period.
  • LNG carrier thickness gauging of ballast tanks and double-hull spaces during a planned stay, with readings referenced to the ship's tank and frame plans.
  • Cargo piping inspection on a product tanker: UT of cargo, stripping and ballast lines on deck and in the pump room, ahead of a vetting inspection.
  • Ro-pax ferry on the Pembroke Dock–Rosslare service: ramp, vehicle-deck and ballast tank checks across consecutive port stays before its annual refit.

How a thickness measurement job runs at Milford Haven

The sequence for a thickness measurement job at Milford Haven is short and written down, so the yard, the surveyor and the superintendent know who arranges what.

Cardiff Airport and Bristol Airport are the nearest international airports, and teams often arrive through Heathrow and continue west by rail or road to Pembrokeshire. The refinery and LNG terminals apply strict ISPS and site-induction rules, so the ship's agent arranges passes and any terminal inductions in advance, and books launches for anchorage work with the port's local providers. The team travels from India on UK visas; because tanker and LNG schedules can move by days, we plan the visit with a margin either side of the expected arrival.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

We send the team from India to the ship for each job rather than keeping staff at the port, and plan the mobilisation around visas and the vessel's itinerary. The work is planned and supervised by the founder, our Responsible NDT Level III (ASNT NDT Level III in UT, RT, MT, PT and VT, with more than eleven years of international field experience). Technicians hold certification under the company's written practice to ASNT SNT-TC-1A; Atlantis is ISO 9001 and ISO 14001 certified.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Crude oil tankers
  • Product tankers
  • LNG carriers
  • Ro-pax ferries
  • Offshore renewable support vessels
  • Coastal and bunker tankers

Frequently asked questions

Can tanks be gauged while a tanker is alongside a Milford Haven jetty?

Generally not during cargo transfer. Terminals restrict contractor work on deck and in cargo spaces while cargo is moving, and tank entry needs the tank gas-free and certified. Jetty time is better used for engine-room and ballast piping and released deck areas; tank structure is best gauged at anchor after cleaning or during a planned stay, which we arrange with the manager and the agent.

Do you gauge LNG carriers?

Yes, outside the cargo containment. On LNG carriers we gauge ballast tanks, double-bottom and side spaces, the trunk deck and cofferdams, plus ballast and sea-water piping. Work in these spaces follows the ship's own entry and gas-detection procedures, and readings are referenced to the ship's tank and frame plans so they can be compared directly at the next survey.

Will the North-East Atlantic ECA affect tankers calling at Milford Haven?

Yes. From 1 September 2028 the 0.10% sulphur limit applies in the waters to the west of the UK, so tankers trading regularly to the Haven will need compliant fuel or a working scrubber for longer parts of each voyage. Scrubber-fitted ships should have wash-water and overboard piping wall thickness checked before then, so any renewal fits a planned docking.

How is ship inspection in Pembrokeshire arranged?

Through the ship's agent. We confirm the scope with the manager, apply for UK visas for the team, and agree boarding with the agent once the ship's arrival is firm, whether that is a jetty, an anchorage reached by launch, or the quays at Pembroke Dock. Terminal inductions are completed before boarding, and the team brings its own ultrasonic gauges and magnetic particle equipment.

Does thickness measurement at Milford Haven need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.