Maritime inspection · United Kingdom

Thickness Gauging for Ferries and Other Ships at Holyhead, Anglesey

Holyhead, on Holy Island off the north-west corner of Anglesey, is the main ferry port between Britain and Dublin, with ro-pax ships sailing several times a day across the Irish Sea. Ferries turn round fast, so gauging here means short, well-prepared scopes during layovers, and longer work when a ship lies over or before a refit elsewhere. Cruise ships and workboats call as well. Each job is staffed by technicians who travel from India to Anglesey and board through the ferry operator or the ship's agent.

Two operators on one crossing

Stena Line and Irish Ferries both run ro-pax services from Holyhead to Dublin. Their ships cross the Irish Sea several times a day in all seasons, so vehicle decks, ramps, bow and stern door structure and ballast tanks carry heavy cyclic loading year after year.

Layovers rather than long stays

A ferry may be alongside for only a couple of hours between sailings, but timetables also contain longer gaps. We fit gauging into those gaps one package at a time, so readings accumulate across a week or two without holding up a single departure.

A harbour of refuge

Holyhead's Victorian breakwater was built to give ships shelter on the Irish Sea, and vessels still use the harbour and bay to wait out bad weather. A ship sheltering there can be reached by launch for a short deck-level scope arranged through her agent.

Inspection services for ships at Holyhead

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

Holyhead: Anglesey's ferry port on the Irish Sea

Holyhead lies on Holy Island, divided from the rest of Anglesey by a narrow strait that road and railway cross, at the end of the historic routes from London to Ireland. The harbour opens onto Holyhead Bay and is protected by a breakwater begun in the 1840s, the longest in Britain, which created a large sheltered anchorage for sailing ships and steamers alike. Stena Line owns and operates the port, and the ferry terminal connects directly with the railway station and with the A55 expressway, which ends at the harbour. The approach from the Irish Sea is deep and open compared with the estuary ports further south, and the tidal range is moderate, but the Irish Sea itself can stay rough for days at a time in winter, which governs ferry operations and any launch work in the bay.

Traffic is dominated by the Dublin crossings. Stena Line and Irish Ferries run large ro-pax ships carrying cars, coaches, freight trailers and passengers, and freight makes up a major share of each sailing. Smaller numbers of other ships use the port: cruise ships call during the summer season, offshore and survey vessels occasionally use the quays for work in the Irish Sea, and fishing vessels and workboats use the inner harbour. In December 2024 storm damage to the ferry berths closed the port for several weeks and sent sailings to other ports, a reminder that one harbour carries much of the traffic between North Wales and Dublin, and that the berth a ship is using can change at short notice. Superintendents planning work here should keep that possibility in mind.

For inspection, Holyhead is a port of short windows. A ferry may be alongside only long enough to discharge and load, and a missed sailing has immediate consequences for passengers and freight customers alike. What helps is the regularity: the same ship returns to the same berth several times a day, week after week, and the timetable shows exactly where the longer layovers fall. Operators also take ships out of service for annual refits at yards elsewhere, and the weeks before a refit are when superintendents most want accurate readings to settle the steel work. Cruise ships in port for a day rarely allow gauging, although expedition and smaller cruise vessels sometimes have specific checks arranged during a call, and relief ferries covering a refit bring their own short-notice requests.

Where and when ships can be gauged at Holyhead

Work on the ferries is done at their berths, during layovers agreed with the operator's technical department and the master. Vehicle decks are gauged when they are empty between discharge and loading, following a plan that divides each deck into areas small enough to finish in one window. Ballast tanks, voids and engine-room piping are often easier, because the crew can prepare them in advance and vehicle movements do not affect them. Ramps, bow visor and stern door structure, with their hinges and locking devices, can be checked by magnetic particle inspection when they are open and out of use.

Holyhead has no drydock able to take the ferries, so refits and docking surveys happen at yards elsewhere in Britain, in Ireland or on the continent. Gauging at Holyhead before the ship leaves for refit lets the operator send the yard a list of plating and piping to renew instead of discovering it on arrival. The inner harbour has quays for fishing vessels and workboats, where routine hull and deck gauging alongside is straightforward, and ships sheltering in the bay can be visited by launch when the sea allows it.

  • Ferry berths — vehicle deck, ramp and ballast tank gauging on Dublin ro-pax ships during layovers.
  • Extended or overnight layovers — larger tank and piping programmes planned with the operator's technical team.
  • Cruise berth — targeted checks on visiting cruise or expedition ships by prior arrangement.
  • Inner harbour quays — hull and deck gauging on fishing vessels, workboats and small offshore craft.
  • Holyhead Bay inside the breakwater — launch-borne deck scopes on ships sheltering from weather.

Thickness measurement through the survey cycle at Holyhead

How much steel has to be gauged depends on which survey the ship is due for, its type and its age. The pattern below is the usual one under IACS unified requirements; the attending surveyor and the class rules for the ship decide the final extent. For a ship calling at Holyhead, we agree the programme with the class and the owner before the team mobilises.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Ferry regulation, emissions and port state control at Holyhead

Ro-pax ferries on the Dublin route work under a dense set of rules: SOLAS and the passenger-ship stability requirements, flag-state surveys by the ships' registries, class surveys, and port state control by the Maritime and Coastguard Agency at Holyhead and by the Irish maritime authorities at the other end, both following Paris MoU procedures. Because the ships carry passengers, inspectors take ramps, doors and vehicle decks seriously, and operators keep detailed maintenance records. Readings that show where vehicle deck plating, ramp structure or ballast tank boundaries are thinning help an operator meet those expectations and avoid unplanned time out of service.

Since 2024 the EU Emissions Trading System has covered half of the emissions on voyages between an EU port and a non-EU port, which takes in every crossing between Holyhead and Dublin by ships of 5,000 gross tonnage and above. That has sharpened the focus on fuel efficiency and on whether to keep older ferries or replace them. Ships visiting UK ports are also expected to carry an Inventory of Hazardous Materials under the ship recycling rules Britain kept after leaving the EU. Holyhead sits within the Anglesey Freeport designated in 2023, and energy projects in the Irish Sea may bring more offshore vessels through the port in the years ahead.

Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Holyhead meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.

Gauging jobs we typically see at Holyhead

Most Holyhead work is ferry work, built around the timetable rather than a cargo plan. The operator's superintendent tells us which areas a coming refit, class survey or the company's own maintenance plan requires, and we divide that scope into packages that fit the layovers. Readings from each package join a running record, so by the time the ship leaves for refit the operator has a complete picture of the areas in question. Occasional jobs on workboats, fishing vessels or ships sheltering in the bay are planned through the agent, often at short notice, provided the team is already in the country.

  • Pre-refit vehicle deck and ramp gauging on a Dublin ro-pax, spread across a week of layovers.
  • Ballast tank, void and sea-water piping UT on a ferry ahead of her intermediate survey.
  • MPI on bow visor, stern door hinges and locking devices during an extended layover.
  • Scrubber wash-water piping checks on a ferry fitted with an exhaust gas cleaning system.
  • Hull and deck condition gauging on a workboat or fishing vessel in the inner harbour.

How a thickness measurement job runs at Holyhead

Most of the work on a Holyhead job happens before the team boards: scope, plan and access are settled first, so the time on board goes on measurement.

Holyhead is reached through Manchester Airport or Liverpool John Lennon Airport, then by rail along the North Wales coast or by road on the A55. London Heathrow is an alternative, with direct trains from London to Holyhead. The team travels from India on UK visas, and because ferry layovers can be planned weeks ahead, visas and travel are arranged in good time. Access to the ferry berths is through the port's security, with passes arranged by the operator or the ship's agent.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

The inspection team is mobilised from India for each job; nobody is stationed at the port, so mobilisation is planned against the vessel's schedule and visa lead times. Our founder and Responsible NDT Level III, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has over eleven years of international field experience, plans and supervises the work. Technicians are certified under the company's written practice to ASNT SNT-TC-1A, and the company holds ISO 9001 and ISO 14001 certification.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Ro-pax ferries
  • Cruise and expedition ships
  • Fishing vessels
  • Workboats and multicats
  • Offshore and survey vessels
  • Coasters

Frequently asked questions

Can a ferry be gauged without missing a sailing at Holyhead?

Yes, if the scope is split to fit the timetable. We agree with the operator which layovers can be used, prepare each package in advance, and keep the team clear of vehicle movements and departure preparations. Priority areas go first, and if a layover is cut short the work resumes on the next one. Nothing in our scope should ever hold a ferry at the berth.

Is there a drydock at Holyhead?

Not for ships of ferry size. Ferries and other large vessels go to yards elsewhere for refits and docking surveys. Holyhead is where the preparation happens: gauging vehicle decks, tanks and piping before the refit, so the yard receives a list of steel and pipe renewals and the operator can judge how long the refit really needs to be.

Can you work on a ship sheltering inside the Holyhead breakwater?

Sometimes. A ship waiting for weather in the bay can be boarded by launch if the agent and master agree conditions are safe, and a short deck-level scope is then possible: air pipes, deck plating, hatch coamings or a tank the crew has prepared. Sea state in Holyhead Bay depends heavily on wind direction, so the day is chosen with local advice.

What happens if a ferry is moved to another route or berth before the job?

We follow the ship where we can. Ferry schedules are generally stable, but refits, relief vessels, berth repairs and weather can move a ship between routes or ports. We confirm the ship and berth a few days before travel, keep the scope packages flexible, and if the ship is switched to another port we look at whether the same work can be done there instead.

Does thickness measurement at Holyhead need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.