Maritime inspection · United Kingdom

Ship Thickness Measurement and Hull Inspection in Belfast

Belfast built ships for the world for well over a century, and the Harland & Wolff yard on Queen's Island still has its great drydock and building facilities. Around it, Belfast Harbour handles Irish Sea ferries, bulk and general cargo, and offshore wind work. For a superintendent with a ship docking in Belfast, or a ferry running daily to Scotland or England, a team travels from India to the vessel, with the work planned around the yard programme or the ferry timetable.

A drydock with shipbuilding heritage

Harland & Wolff's Queen's Island yard takes ships into dock for refit, conversion and survey. We gauge on the owner's side of the job, agreeing the TM plan with the class surveyor before the ship arrives.

Ferries gauged between sailings

Stena Line ro-pax ships to Cairnryan and Birkenhead sail daily but return to the same berths, so vehicle decks, ramps, bow structure and ballast tanks can be worked over several port stays.

Sheltered lough, practical launches

Ships anchored in Belfast Lough while waiting for a berth or a docking slot can be reached by launch through the agent, with more shelter than an open-sea anchorage usually gives.

Inspection services for ships at Belfast

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

Belfast: shipbuilding heritage and a working Irish Sea port

Belfast's maritime identity is inseparable from Harland & Wolff, whose Queen's Island yard built liners, tankers and warships through the twentieth century. The yard is now part of Navantia UK and is building ships again, alongside commercial refit work such as cruise ship refurbishment, while its large drydock and building dock remain defining features of the harbour. That combination of heritage and current capability makes Belfast one of the places on the Irish Sea where a ship can be taken into dock for survey, repair or conversion, and ship repair in Belfast draws vessels that do not otherwise trade here.

Belfast Harbour, run by the Belfast Harbour Commissioners, is Northern Ireland's main port and the hub of its trade with Great Britain. Stena Line ro-pax ferries run to Cairnryan in Scotland and to Birkenhead on the Mersey, and the Isle of Man Steam Packet sails seasonally to Douglas. Bulk carriers bring grain, animal feed and other bulk cargoes for the region's farming economy; general cargo, container and project ships use the harbour's terminals; and the harbour's offshore wind facilities have been used to assemble and load out turbines for Irish Sea wind farms. Belfast Lough gives all of this traffic a sheltered approach and an anchorage at the harbour's door.

Belfast offers gauging time in two quite different forms. Dockings and refits at the shipyard give full access for survey gauging, often for weeks. And Belfast's ferries, although they sail every day, follow fixed timetables and return to the same berth, which makes a staged in-service programme straightforward to plan. Bulk carriers discharging at the harbour's deep-water berths are typically alongside for several days with holds opening in turn. Inspection demand therefore spans the full range, from renewal-survey and conversion gauging in dock to targeted ferry checks between sailings and hold work on bulk carriers.

Where ships are gauged in Belfast Harbour and Belfast Lough

In the shipyard, a ship in drydock gives full access: tanks cleaned and ventilated, shell plating reachable from the dock floor, holds staged where needed. The team works to the TM plan agreed with the class surveyor and the owner's superintendent, and the yard uses the readings to scope steel renewal. For conversions and life-extension projects, gauging before the specification is finalised avoids discovering extra steel once the yard has started cutting, which is when surprises do the most damage to the programme.

Elsewhere in the harbour, gauging is in-service. Ferries at the Stena terminals are worked around their timetables; bulk carriers at the deep-water berths allow longer hold and tank programmes; and ships at anchor in Belfast Lough can be reached by launch through the agent when the weather allows. Because the harbour sits at the head of a sea lough, the anchorage is better sheltered than an open roadstead, and a launch-borne scope is less likely to be cut short by swell. Ferry work is the most time-critical: the team boards once the ship is secured, works the areas the chief officer releases, and is clear before loading for the next sailing begins.

  • Harland & Wolff drydock, Queen's Island — renewal-survey, conversion and steel-renewal gauging on ships in dock, with the class surveyor and yard planners.
  • Stena Line terminals for Cairnryan and Birkenhead — ferry structure worked in instalments: one vehicle deck, one ramp or one ballast tank per port stay.
  • Deep-water berths for grain and feed — bulk carrier holds gauged one by one as the grabs empty them, with topside tanks opened when the crew can release them.
  • Container and general cargo terminals — in-service hull and deck gauging on short-sea and project ships during cargo work.
  • Belfast Lough anchorage — launch-borne condition gauging on ships waiting for a berth or for a docking slot at the yard.
  • Offshore wind terminal quays — deck and crane-foundation crack detection on installation and service vessels between load-outs.

Thickness measurement through the survey cycle at Belfast

How much steel has to be gauged depends on which survey the ship is due for, its type and its age. The pattern below is the usual one under IACS unified requirements; the attending surveyor and the class rules for the ship decide the final extent. For a ship calling at Belfast, we agree the programme with the class and the owner before the team mobilises.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Port state control, sulphur limits and Belfast's trading pattern

Northern Ireland is part of the UK maritime system, so port state control in Belfast is carried out by the Maritime and Coastguard Agency, which since Brexit has continued to apply the Paris MoU regime through UK legislation. Belfast Lough is outside the North Sea SOx ECA, yet the UK's at-berth limit still applies: after two hours alongside, a ship must be on 0.10% sulphur fuel. The North-East Atlantic ECA, adopted by the IMO in 2026 with its sulphur limit applying from 1 September 2028, covers much of the Atlantic seaboard that Belfast ships trade along, and owners should check its final boundary against their own routes when planning fuel and scrubber decisions.

Belfast's trading pattern is dominated by short Irish Sea crossings. Ferries on the Cairnryan and Birkenhead routes are worked hard on tight timetables, and their refit periods are short and closely planned, so accurate pre-docking gauging is what keeps a refit on schedule. Those routes are UK domestic services and sit outside the EU ETS, unlike sailings to Dublin or continental ports. The shipyard adds a second market: owners bringing vessels to Belfast specifically for docking or conversion, often from outside the region, who need the gauging done to the yard's programme rather than the ship's trading pattern.

Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Belfast meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.

Typical thickness gauging jobs in Belfast

Belfast work divides between the drydock and the harbour's working berths. Docking jobs are planned around the yard's programme and the class surveyor's attendance; in-service jobs are fitted around ferry timetables and cargo operations. We agree scope, access and the TM reference system with the superintendent before mobilising, so the readings are ready for the decisions that follow, whether that is a steel order, a refit specification or a purchase.

  • Pre-docking gauging on a ro-pax ferry before a short refit at the Belfast yard, done across several port stays so the steel list is ready when the ship docks.
  • Belfast drydock gauging for a bulk carrier's renewal survey at Queen's Island, covering holds, hopper and topside tanks and double bottoms with the class surveyor.
  • Conversion or life-extension gauging on a vessel lying in Belfast for a yard project, mapping hull and tank condition before the specification is finalised.
  • Hold gauging on a bulk carrier discharging grain at the deep-water berths, worked hold by hold as cargo comes out.
  • Launch-borne deck and air-pipe gauging on a ship at the Belfast Lough anchorage while it waits for its docking slot.

How a thickness measurement job runs at Belfast

A gauging job at Belfast runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.

Belfast has two airports: Belfast International at Aldergrove and George Best Belfast City, which sits beside the harbour. Dublin Airport is a further option for long-haul arrivals, though entering through Dublin brings Irish immigration rules into play alongside UK ones, so we route the team to match the visas they hold. The shipyard, ferry terminals and cargo berths have ISPS-controlled access arranged by the ship's agent or the yard, and launches for Belfast Lough are booked through the agent. Our technicians travel from India, and UK visas are secured as soon as a docking date is confirmed.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Ro-pax ferries
  • Bulk carriers
  • General cargo and project ships
  • Container feeder ships
  • Offshore wind installation and service vessels
  • Cruise ships in refit

Frequently asked questions

Do you gauge ships docked at the Harland & Wolff yard?

Yes. We work for the owner or manager of the ship, not for the yard, and fit into the docking as a specialist on the owner's side. Before the ship arrives we agree the TM plan with the class surveyor, the access and staging arrangements with the yard through your superintendent, and the order in which tanks will be cleaned. During the docking, corrosion findings are reported as we go, so steel decisions are not left to the end.

Can Irish Sea ferry inspection be done without taking the ship out of service?

Much of it can. Vehicle decks, ramps, bow and stern door structure, engine-room piping and some ballast tanks can be inspected in the gaps between sailings if the crew prepare them in advance. We stage the programme over several port stays and keep the same reference points, so by the time the ferry goes to refit the yard has a full set of readings.

What is different about thickness gauging in Northern Ireland?

Technically nothing: the class rules, IACS requirements and survey cycle are the same as anywhere else. The practical differences are the UK regulatory frame, with port state control by the Maritime and Coastguard Agency, and travel, since the team needs UK visas and a route through Dublin has to account for Irish immigration rules as well. We plan both before the job is confirmed.

Is a pre-docking survey worthwhile before a conversion at Belfast?

For conversions and life-extension projects it is one of the most useful steps. The yard's specification and steel quantities depend on hull and tank condition, and finding extra wastage after work starts upsets the programme. Gauging the areas affected by the conversion, plus the tanks and structure due for survey, gives the yard and the owner one agreed baseline before the contract is fixed.

Does thickness measurement at Belfast need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.