Maritime inspection · United Kingdom

Thickness Gauging for Offshore Support Vessels in Aberdeen

Aberdeen is the supply harbour for the UK North Sea, and its quays are lined with platform supply vessels, anchor handlers, standby and rescue vessels and subsea construction ships. These vessels work hard: decks loaded with pipe and containers, tanks switching between mud, brine and base oil, sterns worn by wire. We send a team from India to gauge them between charters or during a crew change, so that renewal survey and charterer audit findings do not arrive as surprises.

Built for offshore support vessels

Platform supply vessels, anchor handlers, standby and rescue vessels and construction ships each wear differently. We gauge cargo tanks, working decks and piping, and crack-test stern equipment and crane foundations.

Gauging between charters and voyages

The best windows in Aberdeen come between contracts and during crew changes or quiet periods, when tanks used for mud, brine and base oil can be emptied, cleaned and opened for readings.

Ready for charterer audits

OVID inspections and operators' own vessel assurance look hard at deck, tank and foundation condition. Current thickness and crack-detection records let an owner answer an auditor's questions with data rather than estimates.

Inspection services for ships at Aberdeen

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

Aberdeen: the North Sea's offshore supply harbour

The Port of Aberdeen has served the UK Continental Shelf since the first North Sea oil developments, and its harbour in the city centre is built around the daily rhythm of offshore supply. Platform supply vessels load pipe, containers, drill water, fuel, mud and dry bulk for installations offshore; anchor-handling tug supply vessels mobilise for rig moves and mooring work; emergency response and rescue vessels change crews and take on stores; and subsea construction and inspection ships call between campaigns. The South Harbour at Nigg Bay added deep-water berths suited to larger offshore and decommissioning work, and offshore wind construction and service vessels now share the port with the oil and gas fleet.

Ships stay long enough to gauge for reasons specific to offshore work. Supply vessels spend part of every round trip alongside loading and back-loading, and they come off charter or wait between contracts at the quay. Crew changes, charterer audits and annual surveys are often taken in port. Swings in North Sea activity also leave vessels idle for weeks at a time, and an idle period is the right moment to open tanks that are full of cargo the rest of the year.

Inspection demand differs from cargo shipping. Offshore support vessels are judged by charterers as much as by class: operators audit vessels against their own standards and OCIMF's OVID scheme, and visible wastage on a working deck, a corroded air pipe or a cracked crane pedestal foundation will be noticed. Deck plating wears under cargo, and tank structure suffers from the variety of fluids carried. Anchor handlers take heavy, concentrated loads at the stern roller, towing pins and shark jaws, and those details need crack detection as well as thickness readings. Older standby and rescue vessels, some of them converted from other roles, need close attention to shell and tank structure.

Quays and harbours where offshore vessels are gauged

Most hull gauging in Aberdeen is done alongside in the city harbour, where the team can work deck structure, cargo tanks and engine-room piping while the vessel is in port. Tank work needs the tanks emptied, cleaned and ventilated, and mud or brine tanks in particular need thorough cleaning before readings mean anything, so the cleaning plan is agreed with the master before the team arrives. Working decks are best gauged when cargo has been discharged and the deck can be cleared in sections, with the readings plotted on the deck plan so worn and gouged areas show up as a pattern rather than a list.

The South Harbour handles larger vessels and decommissioning and wind projects, where vessels may stay longer between campaigns. Further along the coast, Peterhead to the north and Montrose to the south are also used by offshore vessels, and both can be reached by road from Aberdeen. For vessels heading to a yard in Norway, the Netherlands or Poland for their renewal survey, an Aberdeen port call is a practical place to do the pre-docking gauging, because the vessel is already alongside and the crew can prepare tanks between voyages.

  • Aberdeen city harbour quays — deck plating, cargo tank and engine-room piping gauging on platform supply vessels between voyages.
  • Aberdeen South Harbour, Nigg Bay — longer scopes on larger offshore and construction vessels between campaigns, including crane pedestal and A-frame foundation checks.
  • Anchor handler berths — stern roller, towing pin and shark jaw foundation inspection, combining UT with magnetic particle crack detection.
  • Peterhead harbour — in-service gauging on supply and standby vessels using the port, reached by road from Aberdeen.
  • Montrose harbour — gauging on offshore support and wind service vessels working from the port's quays.
  • Quiet-period berths — full tank programmes on idle vessels, when cargo tanks can be emptied, cleaned and opened in sequence.

Thickness measurement through the survey cycle at Aberdeen

Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at Aberdeen usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

North Sea regulation, charterer audits and the offshore market

Aberdeen lies within the North Sea SOx Emission Control Area, so the offshore fleet burns 0.10% sulphur fuel, and the piping concerns that matter most on these vessels are usually sea-water cooling, fire main, fuel and the cargo lines between the deck manifolds and the tanks. Port state control in UK waters rests with the Maritime and Coastguard Agency, which after Brexit continued to inspect under the Paris MoU on the basis of UK legislation. Many vessels here fly the UK, Norwegian or open-register flags, and flag-state inspections add another layer of scrutiny for owners.

The market context is the energy transition. Oil and gas production on the UK Continental Shelf continues alongside a growing decommissioning workload and a rising number of offshore wind projects off the Scottish coast. With relatively few new offshore support vessels ordered over the past decade, many owners are keeping older tonnage working, moving vessels between oil and gas and wind charters, and taking them through renewal surveys at ages where wastage becomes significant. Charterers' vessel assurance processes expect owners to know the condition of their steel, and an Aberdeen thickness measurement record is a straightforward way to show it.

Ships trading to Aberdeen are inside a sulphur emission control area, where fuel must not exceed 0.10% sulphur unless an exhaust gas cleaning system (scrubber) is fitted. Scrubber wash-water piping, the overboard discharge and the hull penetration around it are among the fastest-corroding parts of a modern ship, so they belong in the gauging scope at every docking and, on open-loop systems, between dockings.

Typical thickness gauging jobs in Aberdeen

Offshore work in Aberdeen comes in short windows between voyages and longer windows between charters. We plan the scope with the vessel's technical manager and master so that tanks are cleaned and certified safe for entry before the team arrives, and so that loading on the quay is not held up. Where a charterer audit or a renewal survey is coming, we prioritise the structure each will look at first.

  • PSV thickness gauging of cargo tanks used for mud, brine and base oil, done between charters after cleaning, ahead of the vessel's renewal survey at a yard abroad.
  • AHTS stern roller inspection: UT of the stern roller housing and transom structure, with MPI at towing pin and shark jaw foundations after a season of rig moves.
  • Working-deck plating survey on a supply vessel after years of pipe and container cargo, mapping wastage and gouging to plan deck renewal.
  • ERRV inspection on an older standby vessel: shell, ballast and fuel tank gauging plus sea-water piping, ahead of a charter renewal.
  • Crane pedestal and A-frame foundation crack detection on a subsea construction vessel lying at the South Harbour between campaigns, with the deck cleared for the first time in months.

How a thickness measurement job runs at Aberdeen

A gauging job at Aberdeen runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.

For ship inspection in Aberdeen, the international airport at Dyce is the natural arrival point, with onward connections from London and from European hubs, and the harbour is a short drive away. Supply bases and quays sit behind ISPS-controlled gates, and the vessel's agent or the base operator arranges passes in advance; offshore operators often require site inductions as well, which are completed before the job starts. The team is mobilised from India on UK visas, so we ask for the vessel's expected port days as early as possible and build in a fallback window, because offshore schedules change at short notice.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Platform supply vessels
  • Anchor-handling tug supply vessels
  • Emergency response and rescue vessels
  • Subsea construction vessels
  • Offshore wind service vessels
  • Multipurpose offshore vessels

Frequently asked questions

Can you gauge PSV cargo tanks that have carried mud and brine?

Yes, once they are cleaned. Residual mud and brine affect both access and readings, so tanks need to be emptied, washed, ventilated and certified safe for entry. We agree the tank sequence with the master so that some tanks stay in service while others are gauged, and record readings on the tank plans so wastage can be tracked from one survey to the next.

Do you combine thickness gauging with crack detection on anchor handlers?

Yes. On anchor handlers the stern roller, transom, towing pins and shark jaws carry heavy concentrated loads, and fatigue cracking at welded foundations matters as much as plate wastage. We use magnetic particle testing on cleaned weld toes and UT for plate thickness, and report both against the vessel's frame numbering so repairs can be planned.

What does an offshore support vessel inspection before a charter audit involve?

It focuses on what an auditor sees and asks about: working-deck plating, air and vent pipes, cargo tank structure, crane and A-frame foundations, and sea-water and fire-main piping. Readings and photographs are referenced to the vessel's drawings, so the owner can show current condition, explain any repairs already planned, and close audit observations with evidence.

Can you work at Peterhead or Montrose as well as Aberdeen?

Yes. Both harbours are reachable by road from Aberdeen, and offshore support and wind service vessels use them. We arrange access through the vessel's agent or base operator, and a team already in the area can move between ports when schedules allow, which is useful when two vessels in the same fleet are in port in the same week.

Does thickness measurement at Aberdeen need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.