Maritime inspection · Denmark
Thickness Measurement for Offshore Wind and Supply Vessels in Esbjerg
Esbjerg is Denmark's North Sea energy port: the supply base for the Danish oil and gas sector and one of Europe's main ports for installing and servicing offshore wind farms. Service operation vessels, crew transfer vessels, jack-up installation ships, supply vessels and ro-ro freighters all use the harbour. Atlantis NDT mobilises a team from India to gauge hull structure, deck plating and fatigue-prone details on these ships during port stays and planned maintenance periods.
Offshore wind service fleet
SOVs, CTVs and jack-up installation ships return to Esbjerg between campaigns. Their gangway foundations, crane pedestals and leg housings carry cyclic load and suit magnetic particle crack detection alongside thickness gauging.
Supply vessels between charters
Platform supply vessels serving the Danish sector rotate through Esbjerg. Mud and brine tanks, cargo-rail areas and deck plating worn by cargo handling are the usual OSV thickness measurement priorities.
Aluminium hulls need different methods
Many crew transfer vessels have aluminium hulls. Ultrasonic thickness measurement works on aluminium with the right calibration, but magnetic particle testing does not, so penetrant testing is used for crack detection instead.
Inspection services for ships at Esbjerg
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExplorePort Esbjerg: offshore energy, wind and North Sea ro-ro
Esbjerg grew as a fishing and North Sea trading port, and today its quays are dominated by offshore energy. For decades it has been the supply base for oil and gas production in the Danish sector of the North Sea, and supply vessels, standby vessels and crew boats still work out of the harbour. Since the large offshore wind farms were built off the Jutland coast, including the Horns Rev projects, Esbjerg has also become one of Europe's main bases for staging, installing and maintaining offshore wind turbines, with extensive laydown areas for blades, towers and foundations.
The vessel mix reflects that. Jack-up installation vessels and heavy-lift ships load turbine components; cable-lay ships mobilise for export and array cables; service operation vessels with motion-compensated gangways come in for crew change and stores; and crew transfer vessels, many of them aluminium catamarans, run out to the wind farms. Ro-ro freight services cross the North Sea to the UK, and general cargo ships handle project cargo. This is not a port of large tankers or bulk carriers on ESP survey regimes: most ships here are surveyed under the general hull survey requirements, and the inspection points that matter are specific to offshore work.
Port stays are driven by campaign schedules and weather. When wind or wave conditions stop work offshore, SOVs and CTVs return to port; installation vessels spend days alongside loading the next set of components; supply vessels sit between charters. Those periods, along with planned maintenance stops between seasons, are when gauging gets done in Esbjerg. Offshore vessel owners also tend to schedule intermediate and renewal survey work around charter gaps rather than fixed calendar dates, so the timing of the work is often confirmed late, and visa and travel planning has to allow for that. Winter brings the longest weather stand-downs, while the calmer months are the busiest for installation work.
Where gauging happens in the Esbjerg harbour area
Most measurement on offshore vessels in Esbjerg takes place alongside in the harbour, at the offshore and wind quays where vessels load and lie between campaigns. Deck plating, cargo tanks, ballast tanks and structural foundations can be reached without dry-docking, and much OSV and SOV maintenance is planned that way. Hull shell measurement below the waterline needs a dock or slipway, so it is usually combined with the vessel's docking survey at a yard. Tank entry on supply vessels follows the owner's permit-to-work system, with tanks cleaned and ventilated by the crew or a cleaning contractor before the team starts.
Smaller yards on the Jutland west coast build and maintain workboats, while larger offshore vessels generally dock elsewhere in Denmark, Norway, Germany, the Netherlands or Poland. For those ships, an Esbjerg port call before the docking is a sensible time for pre-docking gauging of tanks and decks, leaving the yard stay for shell plating and repairs. Because wind-farm quays are busy staging areas, work on deck is coordinated with the vessel's own loading plan and the quay operator's lifting operations, and exclusion zones around cranes are respected throughout.
- Offshore wind quays — gangway foundation, crane pedestal and deck gauging on service operation vessels during weather stand-downs and crew changes.
- Installation vessel berths — deck plating, leg-housing structure and jacking-area crack detection on jack-up vessels while components are loaded for the next campaign.
- Supply base quays — mud, brine and fuel tank gauging and cargo-deck plating measurement on platform supply vessels between charters.
- CTV pontoons — aluminium hull thickness measurement and penetrant testing of welds on crew transfer vessels during maintenance days.
- Ro-ro berths — trailer-deck plating, ramp structure and ballast tank measurement on North Sea ro-ro freighters during scheduled port time.
- Docking yards in Denmark and neighbouring countries — shell and bottom plating gauging on offshore vessels at their docking survey, following pre-docking work in Esbjerg.
Thickness measurement through the survey cycle at Esbjerg
How much steel has to be gauged depends on which survey the ship is due for, its type and its age. The pattern below is the usual one under IACS unified requirements; the attending surveyor and the class rules for the ship decide the final extent. For a ship calling at Esbjerg, we agree the programme with the class and the owner before the team mobilises.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
North Sea regulation and offshore market context in Esbjerg
Denmark is a Paris MoU state, and Esbjerg sits inside the North Sea SOx ECA at 0.10% sulphur. Offshore vessels here mostly burn distillate fuel, and a growing number run hybrid battery systems or are designed for alternative fuels, so scrubber piping is less of an issue than at a tanker port. The inspection drivers are different: offshore wind developers and turbine suppliers apply their own vessel vetting and audit regimes, and supply vessels serving oil and gas installations face operator audits alongside class and flag surveys. Structural condition records, from thickness readings to crack detection results on foundations, are part of the evidence those audits look for.
As an EU member, Denmark applies the EU ETS to shipping from 2024 and FuelEU Maritime from 2025; coverage of offshore service vessels depends on their size and type, so owners should confirm how each regime applies to a given ship. For gauging, the more practical local factor is the operating profile. SOVs keep station for long periods with heavy gangway and crane use, jack-ups take repeated jacking loads, and CTVs push their bows against turbine foundations many times a day, which makes the bow fender structure a classic fatigue location. Those load patterns decide where we concentrate measurement and crack detection, rather than the cargo-tank-led scope typical of an ESP ship.
Ships trading to Esbjerg are inside a sulphur emission control area, where fuel must not exceed 0.10% sulphur unless an exhaust gas cleaning system (scrubber) is fitted. Scrubber wash-water piping, the overboard discharge and the hull penetration around it are among the fastest-corroding parts of a modern ship, so they belong in the gauging scope at every docking and, on open-loop systems, between dockings.
Typical thickness gauging jobs in Esbjerg
Esbjerg work is shaped by the offshore calendar. Many jobs are short and targeted — a set of foundations, a deck area, a group of tanks — and fitted into a port stay or maintenance stop, while larger scopes are tied to a vessel's renewal survey. These are the kinds of jobs the offshore fleet in Esbjerg generates through the year, from the start of the installation season to the winter maintenance period.
- SOV inspection during a crew-change call: gangway pedestal welds and crane foundation checked by magnetic particle testing, with the surrounding deck plating gauged.
- OSV thickness measurement on a platform supply vessel between charters: liquid mud and brine tanks, cargo rails and deck plating worn by container and pipe handling.
- Jack-up vessel inspection before a new installation campaign: leg-housing structure, jacking-system foundations and main deck plating under the crane track.
- Crew transfer vessel inspection: aluminium hull thickness readings and penetrant testing of bow fender welds after a season of turbine landings.
- Pre-docking gauging of ballast tanks and decks on a North Sea ro-ro freighter, used to scope steel renewal before its renewal survey docking.
How a thickness measurement job runs at Esbjerg
A gauging job at Esbjerg runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.
The usual gateway is Billund Airport, with Copenhagen Airport as an alternative followed by a rail journey across Denmark to Esbjerg; Esbjerg's own airport mainly serves offshore helicopter traffic. The offshore and wind quays are ISPS-controlled and many have additional site induction requirements, which the ship's agent or the vessel operator arranges in advance. Denmark belongs to the Schengen area, so the team travels from India on Schengen visas. Because offshore vessel schedules shift with weather and charters, we agree a mobilisation window with the operator rather than a single fixed date.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Service operation vessels (SOVs)
- Crew transfer vessels
- Jack-up installation vessels
- Platform supply vessels
- Cable-lay vessels
- Ro-ro cargo ships
- Heavy-lift and project cargo ships
Frequently asked questions
Can you measure aluminium crew transfer vessels in Esbjerg?
Yes. Ultrasonic thickness gauges measure aluminium plating once the gauge is calibrated on a reference block of the same material. Magnetic particle testing cannot be used on aluminium because it is non-magnetic, so crack detection on CTV welds, for example around bow fenders and waterjet mountings, is done with liquid penetrant instead. We plan the method for each area before the team travels.
What do you check on an SOV gangway or crane foundation?
Thickness of the pedestal shell and of the deck and under-deck structure around it, plus magnetic particle testing of the main welds where cyclic load concentrates: pedestal-to-deck welds, bracket toes and doubler edges. Results are reported with sketches and photographs so that the owner, class and the gangway or crane maker's service engineer can assess them together.
Do OSVs and SOVs follow the same survey cycle as tankers and bulk carriers?
The five-year renewal cycle with annual and intermediate surveys applies, but offshore vessels are not ESP ships, so the extensive cargo-tank gauging required for tankers and bulk carriers at later renewal surveys does not apply in the same way. Gauging scope is set by class rules for the ship type, the surveyor's findings and the owner's own maintenance programme, which often goes further on high-wear areas.
Can gauging be fitted into a weather stand-down?
Sometimes. Stand-downs are not predictable enough to book a team from India for one specifically, but if the team is already in Esbjerg for a planned job, additional vessels from the same fleet can often be added during unplanned days alongside. For planned scope, it is better to agree a mobilisation window around a crew change or maintenance period.
Does thickness measurement at Esbjerg need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.