Maritime inspection · Spain
Ferrol Ship Thickness Gauging: Outer Port, Bulk Cargo and Offshore Wind Vessels
Ferrol sits at the end of a long, narrow ría in northern Galicia, best known for its naval yard and base, but its commercial port, with an outer harbour on the open coast, handles bulk cargo and increasingly supports offshore wind. Commercial ships calling here are bulk carriers, general cargo and heavy-lift vessels. Our ultrasonic thickness technicians travel from India to the ship, measuring holds, tanks and decks.
Bulk carriers at the outer port
Large dry bulk carriers use the outer harbour for raw materials. Holds become accessible as discharge progresses, which suits frame, hopper tank and bulkhead gauging ahead of survey.
Offshore wind and heavy-lift ships
The port is positioned to support offshore wind fabrication and marshalling. Installation and component-carrier vessels take unusual loads, and charterers look for measured hull condition.
A naval-yard region
Ferrol's shipbuilding tradition means steel fabrication skills nearby. Readings taken at the commercial berths can inform repair work at yards on the Galician coast, in Ferrol or further south.
Inspection services for ships at Ferrol
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreThe Ría de Ferrol, the outer port and the ships that call
Ferrol is reached through one of Galicia's longest and narrowest rías, whose winding approach is overlooked by old coastal forts and leads to a deep, sheltered natural harbour that has served as a naval base for centuries. The Spanish Navy's arsenal and the Navantia shipyard dominate the inner waterfront, and commercial berths are placed apart from that complex. Over recent years the port authority, which also runs the terminals at San Cibrao, has built an outer port on the open coast near the ría mouth, designed to take larger ships than the narrow channel could comfortably admit.
The commercial trade is bulk-led. Raw materials for heavy industry arrive on dry bulk carriers, among them cargoes bound for power generation and metals production, and general cargo ships bring or take steel products and project cargo. The port has also been developed for the offshore wind industry, with its outer harbour and nearby yards set up for the fabrication, marshalling and loading of large structures such as foundations and floating platforms. Heavy-lift ships, component carriers and tugs work with those cargoes, and fishing vessels and small craft use the quays inside the ría.
For gauging, the mix is distinctive. Bulk carriers calling at the outer port bring the standard problems of that ship type: wastage in ballast tanks, frames and hopper boundaries, and abrasion of hold plating. Heavy-lift and offshore-wind vessels have their own: decks and sea-fastening points bear exceptional loads, and charterers ask for evidence of structural condition before accepting a ship for a campaign. The long ría approach and the exposed outer coast mean that weather and pilotage influence timing, so the working plan allows slack for late arrivals and delayed berthing.
Where gauging happens at Ferrol
Gauging at Ferrol takes place alongside, at the outer port's bulk and general cargo berths and at the commercial quays inside the ría. A bulk carrier discharging at the outer port gives access to the holds as they are emptied, and the sequence of discharge is agreed with the chief officer and the stevedores so the technicians can reach frames, hopper and topside tanks and transverse bulkheads. Decks of heavy-lift and wind component carriers are measured at the quay, with particular attention to sea-fastening areas and the plating around crane pedestals.
The naval yard and arsenal are restricted establishments whose work is not commercial, so merchant ships needing a docking normally go elsewhere on the Galician coast; yards in Vigo have the floating docks and repair quays for most mid-sized ships. Readings taken at Ferrol are formatted as a steel list that goes ahead of the ship to that yard. Where a ship waits at the ría's anchorage, a launch from the agent reaches it, and the sheltered water inside the ría makes boarding easier than on the open coast. Equipment travels with the technicians.
- Outer port bulk berths — hold frame, hopper tank and ballast tank gauging on large bulk carriers during discharge
- Outer port general and project cargo quays — deck and coaming readings on heavy-lift and wind component carriers
- Offshore wind marshalling quays — deck, sea-fastening area and ballast tank readings on installation and carrier vessels
- Commercial quays inside the ría — hull, tank and deck gauging on general cargo ships and tugs
- Fishing and small-craft berths — hull and tank readings on coastal fishing vessels in port
- Pre-docking steel lists for yards at Vigo or elsewhere on the Galician coast
Thickness measurement through the survey cycle at Ferrol
How much steel has to be gauged depends on which survey the ship is due for, its type and its age. The pattern below is the usual one under IACS unified requirements; the attending surveyor and the class rules for the ship decide the final extent. For a ship calling at Ferrol, we agree the programme with the class and the owner before the team mobilises.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Administration, naval restrictions and the offshore wind build-out
Port state control at Ferrol falls under the Paris MoU, carried out by the Spanish maritime administration, the Dirección General de la Marina Mercante, through the local Capitanía Marítima. The commercial port sees a steady stream of bulk carriers of varied age and flag, and the older ones are those inspectors target. The naval base shapes the port in other ways: parts of the ría are restricted to military traffic, and commercial ships follow the pilots' instructions on routing and berthing with that in mind.
EU measures add to the pressure on owners. A ship entering an EU port must hold an Inventory of Hazardous Materials under the bloc's recycling legislation, and both the carbon market (2024) and FuelEU Maritime (2025) now apply to shipping. Spain's plans for floating offshore wind have made Galicia's outer ports a focus of public investment, which brings in heavy-lift ships, tugs and installation vessels from across Europe. Charterers on these projects often ask for independent thickness readings before accepting a ship, and the same readings help owners plan maintenance between campaigns.
Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Ferrol meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.
Typical gauging jobs at Ferrol
Most Ferrol work comes from bulk carriers at the outer port and from vessels linked to offshore wind projects. The superintendent or charterer sends the survey status, the vessel's drawings and the compartments of concern, we agree access with the agent and stevedores, and the technicians travel from India once the stay is confirmed. Heavy-lift vessels often have fixed loading schedules, so the plan is built around them. Typical requests include:
- Hold frame, hopper tank and transverse bulkhead gauging on a Capesize bulk carrier discharging raw materials, ahead of its special survey.
- Deck, sea-fastening area and ballast tank gauging on a heavy-lift vessel before an offshore wind component campaign.
- Hull and tank readings on a tug used for wind platform towing, to document the structure for the charterer.
- Hatch coaming and cargo hold gauging on a general cargo ship loading steel products, in preparation for intermediate survey.
- A pre-docking steel list taken on a bulk carrier at the ría anchorage, sent to a yard in Vigo ahead of its dock slot.
How a thickness measurement job runs at Ferrol
The sequence for a thickness measurement job at Ferrol is short and written down, so the yard, the surveyor and the superintendent know who arranges what.
Technicians usually fly to A Coruña's Alvedro airport or to Santiago de Compostela, connecting through Madrid or Lisbon from India, and reach Ferrol by road. The outer port is a further short drive. The ship's agent arranges port passes and any launch for the anchorage, while the naval zones are not part of commercial access. Spain is in the Schengen area, so each technician needs a visa obtained in India, applied for once the ship's stay is confirmed and supported by an invitation naming the vessel. Weather affects arrivals, so travel is booked late.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
We send the team from India to the ship for each job rather than keeping staff at the port, and plan the mobilisation around visas and the vessel's itinerary. The work is planned and supervised by the founder, our Responsible NDT Level III (ASNT NDT Level III in UT, RT, MT, PT and VT, with more than eleven years of international field experience). Technicians hold certification under the company's written practice to ASNT SNT-TC-1A; Atlantis is ISO 9001 and ISO 14001 certified.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Capesize and Panamax bulk carriers
- General cargo ships
- Heavy-lift vessels
- Wind component carriers
- Offshore installation vessels
- Tugs and towing vessels
- Fishing vessels
- Project cargo ships
Frequently asked questions
Can I dock a merchant ship at Ferrol?
The naval yard and arsenal are not commercial repair facilities, so merchant ships usually go to another Galician yard, typically at Vigo. We take readings at Ferrol alongside or at anchor and prepare a steel list that you can send ahead to the yard, so the docking estimate rests on measured plate.
Can bulk carrier holds be gauged during discharge at the outer port?
Yes, as holds are emptied and made safe. We agree a hold-by-hold sequence with the chief officer and stevedores, and measure frames, hopper and topside tank boundaries and bulkheads. Longer discharges allow a systematic programme, while short calls call for a priority list set in advance.
Do you gauge vessels used for offshore wind work?
Yes. Heavy-lift, installation and component-carrier ships take unusual loads, and charterers often want measured evidence of structural condition before a campaign. We gauge decks, sea-fastening areas, ballast tanks and hold structure alongside, and report compartment by compartment for the charterer's vessel acceptance.
Does the naval base restrict commercial gauging?
Parts of the ría are military zones, and commercial ships are directed by the pilots accordingly. Gauging itself takes place at commercial berths and the anchorage, arranged through the ship's agent. The naval yard and arsenal are not part of any commercial gauging programme.
Does thickness measurement at Ferrol need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.