Maritime inspection · Spain

Hull and Hold Thickness Gauging at the Port of Gijón (El Musel)

Gijón's commercial port is El Musel, a deep-water outer harbour cut into the Asturian coast and built around solid bulk: coal, iron ore and other raw materials for the region's industry. Big bulk carriers call here, and they leave behind holds worn by grabs and heavy cargoes. Technicians travel from India to the ship for gauging, usually timed to the discharge programme, with readings feeding a survey or a docking elsewhere on the coast.

Deep-water berths for big bulkers

El Musel takes some of the largest bulk carriers on Spain's north coast. Large ships mean big holds and long programmes, so we plan gauging hold by hold against the discharge sequence.

Coal and ore wear patterns

Grab damage, abrasion and cargo residue concentrate wear on tank tops, hopper plates and lower frames. Gridded readings show where wastage is general and where it is local.

Gas and energy calls too

The port also has a regasification terminal and handles liquid bulk, so tankers and gas carriers occasionally call. Work on those ships is limited to what the terminal rules and the ship's permit allow.

Inspection services for ships at Gijón

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

El Musel: a purpose-built outer port for raw materials

The Autoridad Portuaria de Gijón runs two harbours. The old local port next to the city serves leisure craft and fishing boats, while El Musel, to the west of the town, is the commercial harbour. It was extended into deeper water by large breakwaters and has long straight quays suited to the largest bulk ships trading to the Cantabrian coast. The harbour is exposed to the same north-westerly swells as the rest of this shore, but the outer breakwaters give ships a sheltered working basin once inside.

The cargo list is dominated by solid bulk. Coal for power and industry, iron ore for the steelworks along this coast, other minerals and scrap move through dedicated terminals with grab cranes and conveyors, and the port also handles steel products, project cargo and some vehicles. A regasification plant built at El Musel gives the port a gas-carrier connection, although its use has varied with the market. Ro-ro and general cargo traffic exist but are small beside the bulk trades, and local fishing and pilot craft use the old harbour.

That mix brings steady inspection demand for large bulk carriers. Capesize and panamax ships often arrive from ore or coal loading ports with holds that have seen thousands of grab cycles. Under the enhanced survey programme, bulk carriers must have thickness measurement of hold frames, bulkheads and tank boundaries at set points in their life, and the surveyor needs the readings in a usable form. A discharge at El Musel gives a ship a clean opportunity to gauge holds that would otherwise be accessible only in a shipyard, as long as the programme is planned with the stevedores.

Gauging places at El Musel and the wider Gijón area

Alongside work happens at the bulk berths of El Musel. Each hold is opened for gauging once the cargo has been discharged and the ship has issued an entry permit, and technicians then move between frames, bulkheads and tank tops on staging or portable platforms arranged by the ship. Large ships have deep holds, so the practical limit is often access height; we agree beforehand which levels can be reached and how the remaining areas will be covered in a later dock. Ballast tanks, including topside and hopper tanks, are measured when emptied and ventilated.

For drydocking, Gijón itself has shipyards and ship-repair companies on its western side near the port, serving fishing boats, offshore vessels, tugs and coasters, and an owner can send a larger ship to another yard on the northern coast or Galicia. The practical sequence is to gauge at El Musel, build the steel estimate, and have technicians return for post-blast readings if the owner wishes. Anchorage gauging in the open roads outside the breakwaters is possible in calm weather but is uncommon on this exposed coast.

  • Solid-bulk quays at El Musel: hold frame, bulkhead and tank top gauging on capesize, panamax and supramax carriers after discharge
  • Liquid-bulk and energy berths: deck, ballast tank and piping gauging on tankers, subject to the terminal's permit-to-work rules
  • Regasification terminal berth: hull, ballast and deck readings on gas carriers during their call
  • General cargo and project quays: steel product ships, heavy-lift vessels and ro-ro carriers between cargo operations
  • Repair yards and slipways in the Gijón area: smaller ships, offshore support vessels and workboats under repair
  • Roads outside the breakwaters: limited pre-arrival gauging by launch in settled weather

Thickness measurement through the survey cycle at Gijón

Every renewal survey asks for more thickness measurement than the last, and for oil tankers, chemical tankers and bulk carriers the ESP Code adds close-up survey on top. The table is the usual shape of the work; the class rules and the surveyor set the exact extent, which is why the measurement plan for a job at Gijón is agreed in writing before mobilisation.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Spanish inspection practice and bulk-trade pressures

The Capitanía Marítima in Gijón carries out port state control for the Paris MoU under the Dirección General de la Marina Mercante. Bulk carriers are one of the categories inspectors scrutinise, because hold frame failures have a long history in the sector, and ships bringing coal or ore to Asturias often appear on routes that include ports with a high share of ageing tonnage. A set of structural readings gathered before a ship loads again helps the master answer questions about holds, hatch covers and coamings with figures rather than with the last survey's summary.

Environmental and financial rules add another reason to gauge. Ships calling at EU ports need an Inventory of Hazardous Materials under the Ship Recycling Regulation, and owners of older carriers often review structure at the same time as the IHM when deciding whether to sell, scrap or refit. EU ETS and FuelEU Maritime also raise the stakes for ships that burn a lot of fuel on long ore routes, and engineers deciding on retrofits want to know that the steel around any modification is sound before design work begins.

Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Gijón meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.

What gauging at Gijón usually involves

Most enquiries come from superintendents of large bulk carriers whose survey is approaching, and from owners buying or selling second-hand tonnage on the Atlantic ore and coal trades. The aim is a measurement plan that fits the discharge pattern. Technicians travel from India with portable gauges and magnetic particle equipment, and the team size follows the number of holds. Typical jobs include:

  • Frame, bulkhead and hopper tank gauging in all holds of a capesize carrier after coal discharge, prepared for a special survey on the enhanced programme.
  • Tank top plating gauged on a grid in two holds of a panamax ore carrier where grab damage is known, with readings compared to the earlier survey report.
  • Hatch cover and coaming gauging with magnetic particle testing at coaming corners on a supramax discharging at the bulk quays.
  • Ballast tank and double-bottom readings on a bulker lying in El Musel, producing a steel estimate for a docking at a yard on the northern coast.
  • Pre-purchase gauging of holds, tank tops and main deck on a ten-year-old bulk carrier, completed during discharge for a buyer's superintendent.

How a thickness measurement job runs at Gijón

The sequence for a thickness measurement job at Gijón is short and written down, so the yard, the surveyor and the superintendent know who arranges what.

Technicians fly from India through a European hub to Asturias Airport, which serves both Gijón and Avilés, and continue by road to El Musel; Bilbao and Santander airports are fallback routes. The ship's agent arranges ISPS access and books launches where needed. Because Spain is in the Schengen area, travel is scheduled once visas are issued, and for large ships with firm discharge plans the visa application is timed to the confirmed berthing window.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

We send the team from India to the ship for each job rather than keeping staff at the port, and plan the mobilisation around visas and the vessel's itinerary. The work is planned and supervised by the founder, our Responsible NDT Level III (ASNT NDT Level III in UT, RT, MT, PT and VT, with more than eleven years of international field experience). Technicians hold certification under the company's written practice to ASNT SNT-TC-1A; Atlantis is ISO 9001 and ISO 14001 certified.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Capesize and panamax bulk carriers
  • Supramax and handymax bulk carriers
  • Coal and ore carriers
  • Gas carriers
  • Product and chemical tankers
  • Steel product and general cargo ships
  • Heavy-lift and project cargo ships
  • Offshore support vessels

Frequently asked questions

How long does it take to gauge the holds of a capesize carrier at El Musel?

It depends on the number of holds, their depth and how quickly each is cleared after discharge. A typical enhanced-survey programme runs through the whole discharge period with a team sized to cover several holds in parallel. We agree the order of holds beforehand and tell you realistically which areas can be reached from the tank top and which need staging.

Can you gauge a ship at anchor outside El Musel before it berths?

Sometimes, in settled weather and with a suitable launch, mainly for ballast tanks and deck structure. The coast is exposed, so sea state often rules it out, and hold structure is difficult to read while cargo is aboard. Alongside gauging during discharge is the more reliable arrangement and gives access to the spaces the survey cares about.

What happens after the readings if steel renewal is needed?

The report shows where plates are below the allowable diminution or approaching it, and an owner uses it to build a steel estimate. The renewal itself is done in a shipyard, usually elsewhere on the northern or Galician coast. We can return to the yard for post-blast readings so that the surveyor sees thickness on the areas left in place.

Do you gauge gas carriers at the regasification terminal?

On request, within the terminal's own boarding and permit rules. Work is limited to hull plating, ballast tanks, deck structure and piping outside the cargo containment, and readings are taken when conditions allow. Cargo containment is a separate specialist subject and not something ultrasonic gauging addresses.

Is gauging in Gijón useful for a pre-purchase inspection?

Yes. Buyers of second-hand bulk carriers often want hold and tank readings before a sale is completed, and a discharge at El Musel provides empty holds. We measure to a plan agreed with the buyer's superintendent and report the results so that the structure can be weighed in the deal on facts rather than assumptions.

Does thickness measurement at Gijón need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.