Maritime inspection · Spain
A Coruña UTM: Ship Thickness Gauging at the Inner and Outer Port
A Coruña has two harbours: the old inner port beside the city, with cruise and fishing quays, and the outer port at Punta Langosteira, built for tankers and bulk cargo serving the refinery and industry beyond. Ships here are mostly liquid and dry bulk, with fishing and cruise traffic. Our ultrasonic thickness technicians travel from India to the ship, gauging tanks, decks and shell at either port.
Tankers at the outer port
Crude and product tankers serve the refinery through the outer port. Gauging during cargo stops follows the terminal's permit rules and concentrates on deck, pump room and ballast tank structure.
Two ports, one mobilisation
The inner harbour and Punta Langosteira are a short road apart. Ships at either can be covered by the same team, with the plan shifting as berths and cargo timings move.
Cruise and fishing in the old harbour
Cruise ships use the inner quays on short calls, and fishing vessels work from the traditional harbour. Both bring tight windows, so readings are agreed in advance against what the ship can release.
Inspection services for ships at A Coruña
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreA Coruña's inner harbour and the Punta Langosteira outer port
A Coruña's old port occupies a peninsula on Galicia's north-western coast, with quays along the city's waterfront facing a sheltered inlet. Over decades the heavy industrial traffic outgrew that site, and the port authority built a new outer port at Punta Langosteira, a few miles along the coast and protected by a large breakwater. The newer harbour takes ships that the old one never could, in deeper water and with space for bulk terminals and energy infrastructure, while the inner port keeps the city-centre functions: cruise calls, the fishing fleet and a smaller cargo trade.
The traffic follows that division. Crude oil for the refinery and its petroleum products travel through the outer port on tankers of varied size, and dry bulk cargoes such as coal, grain and other raw materials arrive on bulk carriers to supply regional industry. General cargo and project cargo move through both harbours, and offshore wind components have become a growing interest, with the outer port set aside for that industry's marshalling and fabrication needs. The inner harbour handles cruise ships on transatlantic and northern European itineraries, trawlers and coastal fishing boats, and ferries and smaller craft working along the coast.
Weather defines operations. The north-western corner of Spain takes Atlantic storms from autumn to spring, and the outer port's breakwater is exposed to heavy swell that can stop berthing, loading and boarding for days. Ships arriving after a hard crossing of the Bay of Biscay often show the strain in ballast tanks, deck plating and forward structure. For a surveyor, the harbour pair gives variety, because a tanker at Punta Langosteira and a cruise ship in the old port may need work on the same day, and flexible scheduling is a requirement rather than a luxury.
Where gauging happens at A Coruña
Most gauging takes place alongside. At the outer port, tankers at the energy berths are measured within the terminal's permit-to-work regime, with deck, pump room and ballast tank readings taken during cargo operations and cargo tanks measured only when gas-free. Bulk carriers at the dry bulk berths allow hold and tank access as discharge progresses, and the long quays give room for systematic readings on frames, hopper tanks and bulkheads. In the inner harbour, cruise ships on the city quays are gauged within their call, and fishing vessels are measured at their own berths.
A Coruña has repair capacity for small and medium ships in the inner harbour, but large merchant ships needing a docking generally go to a yard in Ferrol, Vigo or elsewhere on the coast. Readings taken at A Coruña become a steel list that goes ahead of the ship, giving the yard a measured starting point. Anchorage work in the bay is possible in moderate conditions with a launch from the agent, though the Atlantic swell restricts it in winter. The gauges and magnetic particle yokes travel with the technicians as personal equipment.
- Punta Langosteira energy berths — deck, pump room, ballast tank and piping gauging on crude and product tankers under terminal permits
- Outer-port dry bulk berths — hold frame, hopper tank and ballast tank readings on bulk carriers during discharge
- Outer-port general and project cargo quays — deck and coaming readings on cargo ships, including wind component carriers
- Inner-harbour cruise quays — tank, machinery-space and scrubber piping gauging within the call
- Fishing harbour berths — hull, hold boundary and tank gauging on trawlers and coastal vessels
- Bay anchorage — launch-served readings on waiting ships in moderate conditions, with steel lists sent to onward yards
Thickness measurement through the survey cycle at A Coruña
Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at A Coruña usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Coastal administration, offshore wind and EU requirements
Port state control at A Coruña falls under the Paris MoU, with inspections carried out by the Spanish maritime administration, the Dirección General de la Marina Mercante, through the Capitanía Marítima. Tankers calling at the outer port are of interest to inspectors, particularly older ones, and a measured set of ballast tank and deck readings before arrival is a practical protection for the owner. The Galician coast has a history of serious casualties, which keeps the authorities and the public attentive to the condition of tankers and bulk ships on these approaches.
EU measures add to the picture. Under the EU's ship recycling rules a hazardous-materials inventory must be on board whenever a ship enters its ports; emissions trading has covered shipping since 2024 and FuelEU Maritime since 2025, so owners with ageing tankers weigh these obligations against the remaining life of their steel. The outer port's role in Spain's plans for offshore wind brings in heavy-lift and installation vessels, whose structures take unusual loads, and gauging those ships before a campaign is a way for charterers to confirm that the hulls are fit for it.
Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at A Coruña meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.
Typical gauging jobs at A Coruña
Work at A Coruña centres on tankers and bulk carriers at the outer port, with cruise and fishing work in the old harbour. The superintendent provides the survey status and the compartments of concern, we check with the agent and terminal what the cargo plan permits, and the technicians travel from India once the stay is firm. Because the two harbours are separate, the plan names the berth and the access arrangements. Typical requests include:
- Ballast tank and deck gauging on a product tanker at the outer port during cargo operations, preparing for the next survey.
- Condition gauging of an older crude tanker for an owner weighing life extension against sale, covering ballast tanks and cargo tanks once gas-free.
- Hold frame and hopper tank readings on a bulk carrier discharging coal at the dry bulk berths, ahead of its special survey.
- Scrubber wash-water and overboard piping gauging on a cruise ship during a call in the inner harbour.
- Hull and ballast tank gauging on a heavy-lift vessel before an offshore wind component campaign, to document the structure's state for the charterer.
How a thickness measurement job runs at A Coruña
The sequence for a thickness measurement job at A Coruña is short and written down, so the yard, the surveyor and the superintendent know who arranges what.
A Coruña's own airport, Alvedro, serves the area, with Santiago de Compostela airport as an alternative; technicians commonly connect through Madrid or Lisbon from India. The outer port is a road journey along the coast from the city. The ship's agent arranges ISPS passes at both harbours and a launch for any anchorage visit. Spain is part of the Schengen area, so each technician needs a visa obtained in India, applied for once the ship's stay is confirmed and supported by an invitation naming the vessel. Storm delays are common, so flights are booked late.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
We send the team from India to the ship for each job rather than keeping staff at the port, and plan the mobilisation around visas and the vessel's itinerary. The work is planned and supervised by the founder, our Responsible NDT Level III (ASNT NDT Level III in UT, RT, MT, PT and VT, with more than eleven years of international field experience). Technicians hold certification under the company's written practice to ASNT SNT-TC-1A; Atlantis is ISO 9001 and ISO 14001 certified.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Crude oil tankers
- Product tankers
- Dry bulk carriers
- General and project cargo ships
- Wind component carriers and heavy-lift vessels
- Cruise ships
- Fishing vessels
- Coastal ferries and workboats
Frequently asked questions
Which of A Coruña's two ports will my ship use?
Tankers and bulk carriers generally use the outer port at Punta Langosteira, while cruise ships and fishing vessels use the older inner harbour. Your ship's agent will confirm the berth. We plan access around the terminal concerned, and a single mobilisation can cover both harbours where timing allows.
Can cargo tanks be gauged while a tanker is alongside?
Cargo tanks can be measured only when they are gas-free and the terminal's permit rules are met, which usually means after discharge and cleaning. Deck, pump room and ballast tank readings can often be taken during cargo operations, so we plan the work in stages that follow the cargo plan.
Is there a drydock at A Coruña for large ships?
Not for large merchant ships. Small and medium vessels can be repaired in the inner harbour, but bigger ships usually go to Ferrol, Vigo or another yard on the coast. We gauge at A Coruña and prepare the steel list so the yard can plan the docking from measured plate.
Does winter weather stop gauging at the outer port?
Heavy swell can interrupt berthing, boarding and cargo work for days at the exposed outer port. We keep the plan flexible and confirm sea state with the agent before travel. Compartments inside the ship are unaffected by weather once the team is aboard, but getting to the ship is the constraint.
Can you gauge ships working on offshore wind projects?
Yes. Heavy-lift, installation and component-carrier vessels take unusual loads, and charterers sometimes want an independent record of hull condition before a campaign. We measure decks, ballast tanks and hold structure alongside, and report compartment by compartment so the results can support the charterer's vessel acceptance.
Does thickness measurement at A Coruña need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.