Vigo Hull Gauging: Thickness Measurement in Galicia's Biggest Repair Port

Vigo is the busiest ship-repair and fishing centre on Spain's Atlantic coast, with several yards, floating docks and a harbour that serves fishing fleets, car carriers, container ships and cruise vessels. For gauging it is the place where afloat readings turn into docking work. Our ultrasonic thickness technicians travel from India to the ship, measuring hull, tanks and piping at the yard, the quay or the anchorage.

Yards and floating docks in the ría

Vigo's repair yards run floating docks and long quays, so a ship can be gauged afloat, then docked in the same stay. Readings feed the steel list while repairs are still being scoped.

Europe's busiest fishing port

Large trawlers, freezer vessels and fish-carrying ships use Vigo constantly. Their hulls and fish-hold boundaries suffer hard wear, which makes thickness records valuable before a refit.

Car carriers and cruise calls

Vehicle carriers loading at the port and cruise ships calling at the transatlantic quay give short windows for deck, tank and scrubber piping readings between operations.

Inspection services for ships at Vigo

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

The Ría de Vigo and its working harbour

Vigo stands on the southern shore of a deep, sheltered ría in Galicia, protected from the Atlantic by the Cíes Islands at its mouth. The geography is the port's asset: ships anchor and berth in calm water close to a city whose economy has long depended on the sea. Berths run along the waterfront from the old fishing quays and the cruise terminal to the container, vehicle and general cargo facilities further out, and the shipbuilding and repair yards sit on both sides of the ría, with a steady stream of small craft crossing between them.

Fishing is the defining trade. The port lands more fish than any other in Europe by most accounts, serving a large distant-water fleet of trawlers and freezer ships along with a coastal fleet, and a cluster of cold-chain and processing firms depends on it. Alongside the fishing vessels, car carriers load vehicles built at the plant in the Vigo area, container ships and feeders call at the terminal on the southern side, and cruise ships berth at the central quays. Ro-ro, general cargo and bulk ships call for the region's industries, and offshore and research vessels use the yards for maintenance.

For gauging, Vigo's mix is attractive because many types of ship pass through a short stretch of water. A trawler hauled for refit, a car carrier waiting for its next cargo, a cruise ship on a short call and a general cargo ship in for repairs each have a different pattern of wear and a different window for the work. Fishing vessels often show wastage around fish holds, in ballast and fuel tanks and at the shell where ice or gear has rubbed. Car carriers show wear on ramps and vehicle decks, and cruise ships bring concern about scrubber piping and tanks, so the programme is chosen ship by ship.

Yards, quays and anchorages where gauging happens

The yards are the centre of Vigo's gauging work. Metalships & Docks operates floating docks and a long repair quay on the ría and takes mid-sized merchant ships, offshore vessels and fishing ships; several other yards, among them Freire, Armón and Barreras, build and repair vessels from small to large. A dock stay gives full access to the bottom and side shell, and the superintendent usually wants renewal-survey and condition readings completed before steel orders are placed. We work to the yard's sequence and report compartment by compartment, so the steel list can be revised as tanks are cleaned and released.

Outside the yards, gauging is done alongside at the fishing quays, the vehicle and container terminals and the cruise berths, or at the anchorage in the ría, where launches reach ships waiting for a berth or for orders. The sheltered water makes anchorage boarding easier than on most Atlantic harbours, and holds and ballast tanks on an idle bulk or general cargo ship can be measured while it waits. Equipment travels with the technicians, including magnetic particle yokes for cracks at frame ends, hatch corners and welded attachments found during the readings.

  • Metalships & Docks, Vigo — dry-dock and afloat gauging on merchant, offshore and fishing vessels around its floating docks
  • Other ría yards (Freire, Armón, Barreras) — newbuild, conversion and repair gauging as each yard's programme allows
  • Fishing port quays — hull, fish-hold boundary and tank gauging on trawlers and freezer vessels in port
  • Vehicle terminal berths — ramp, vehicle deck and ballast tank gauging on car carriers between cargoes
  • Container terminal and general cargo quays — deck, hatch coaming and ballast tank readings on short-sea and feeder ships
  • Cruise quays and the ría anchorage — tank, piping and scrubber readings, and launch-served work on waiting ships

Thickness measurement through the survey cycle at Vigo

Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at Vigo usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Spanish maritime administration and the pressures on Vigo's fleet

Port state control in Vigo falls under the Paris MoU and is carried out by the Spanish maritime administration, the Dirección General de la Marina Mercante, through the Capitanía Marítima in the port. Inspectors target older ships and those with a poor record, and Vigo's mix of long-serving fishing tonnage and visiting merchant ships provides plenty of candidates. A superintendent who has taken thickness readings before arrival is less likely to be surprised by a structural deficiency raised during an inspection, and has time to plan repair work around the stay.

Obligations under EU law add pressure. Every ship that calls here also needs an Inventory of Hazardous Materials, as the EU recycling rules for ships demand, while the emissions trading scheme has reached shipping from 2024 and FuelEU Maritime from 2025. Fishing vessels are covered by their own fleet rules and safety regimes, and owners who intend to extend a vessel's life often seek independent thickness records before committing to major steel renewal. For merchant ships, the same readings support sale and purchase, charter on and off-hire checks and the planning of the next docking, whichever yard is chosen.

Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Vigo meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.

Typical gauging jobs at Vigo

Vigo's work is yard-led for larger ships and quay-led for the busy fishing and vehicle trades. The superintendent or owner sends the survey status, the repair specification and any earlier gauging report, and we agree which compartments are available and in what order. The team travels from India once the dock slot or the call date is firm, and where possible the same technicians cover the afloat readings and the docked stage. Typical requests include:

  • Renewal-survey gauging on a general cargo ship in dock at a ría yard, covering hold frames, tank tops, ballast tanks and hatch coamings.
  • Hull, fish-hold boundary and ballast tank gauging on a freezer trawler hauled out for refit, to size steel renewal before work begins.
  • Ramp and vehicle-deck plating readings on a car carrier between cargoes at the vehicle terminal, ahead of an intermediate survey.
  • Scrubber wash-water and overboard piping gauging on a cruise ship during a call, for owners planning maintenance.
  • A pre-docking steel estimate taken on a bulk carrier at anchor in the ría, with the list sent to the yard before the dock slot starts.

How a thickness measurement job runs at Vigo

The sequence for a thickness measurement job at Vigo is short and written down, so the yard, the surveyor and the superintendent know who arranges what.

The nearest airport is Vigo-Peinador, with additional routes through Santiago de Compostela, A Coruña or Porto; technicians usually connect through Madrid or Lisbon from India. Spain is in the Schengen area, so each technician needs a visa obtained in India, applied for once the dock slot or call is confirmed and supported by an invitation naming the vessel. The ship's agent arranges port passes and launches, while each yard issues its own site access. Dock dates move, so flights are confirmed against the yard's latest schedule.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

We send the team from India to the ship for each job rather than keeping staff at the port, and plan the mobilisation around visas and the vessel's itinerary. The work is planned and supervised by the founder, our Responsible NDT Level III (ASNT NDT Level III in UT, RT, MT, PT and VT, with more than eleven years of international field experience). Technicians hold certification under the company's written practice to ASNT SNT-TC-1A; Atlantis is ISO 9001 and ISO 14001 certified.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Fishing trawlers and freezer vessels
  • Fish carriers and reefer ships
  • Car carriers
  • Container ships and feeders
  • Cruise ships
  • General cargo and ro-ro ships
  • Offshore support and research vessels
  • Bulk carriers

Frequently asked questions

Can gauging be done in a floating dock at Vigo?

Yes. Floating docks give access to the bottom and side shell once the ship is blocked, and we measure after the yard has cleaned the surface. We coordinate with the dock master and the yard's work sequence, because the dock is often wanted for the next ship, and we report compartment by compartment so renewals can be decided during the stay.

Is a fishing trawler gauged the same way as a merchant ship?

Yes. Fishing vessels are measured in the same way as other ships, with particular attention to fish-hold boundaries, ballast and fuel tanks, the shell at the waterline and areas worn by gear or ice. Owners use the readings to size steel renewal at refit or to support a sale or life-extension decision.

Is the ría anchorage suitable for gauging?

Often, because the water is sheltered by the Cíes Islands. A launch from the agent takes the team to a ship waiting for a berth or orders, and ballast tanks, deck plating and empty holds can be measured. Cargo tanks on tankers are left for a gas-free stay, and we confirm access and safety with the master.

Can you gauge a ship at Vigo before it goes to a different yard?

Yes. Readings taken at Vigo, at the quay or at anchor, become a measured steel list that you can send to any yard, in Galicia or elsewhere, so the repair estimate is based on actual plate rather than on the last survey report. Telling us the target yard helps us format the report to match.

What lead time is needed for a gauging job at Vigo?

As early as the ship's schedule is known. Visas for the technicians take time to arrange, and a dock slot or planned call gives us room to complete them and agree the scope. Short-notice requests are still worth sending, and we will say honestly whether a team can reach the ship in time.

Does thickness measurement at Vigo need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.