Maritime inspection · Spain

Ultrasonic Thickness Measurement for Ships in the Ría de Avilés

Avilés sits on a sheltered ría on the Asturian coast, and its quays exist to feed and empty a steelworks and a metal industry. Bulk carriers bring ore, coal and limestone; general cargo ships take away coil, plate and aluminium. Those cargoes are hard on holds and tank tops. Gauging technicians travel from India to the ship, so the work is planned around the vessel's discharge and the visa lead time rather than around any base here.

Holds that carry ore and coal

Abrasive cargo and heavy grabs wear tank tops, lower hold frames and hopper plating faster than the age of the ship suggests. We gauge those areas systematically while the holds are empty and safe to enter.

Metal cargo, metal-stained decks

Coil, plate and ingot carriers load concentrated weights on decks and tank tops. Readings around stowage areas, hatch coamings and lashing points show where steel has thinned under repeated loading.

Short discharge windows

A bulker may be alongside only as long as the cargo programme needs. We agree a priority order of holds and tanks with the chief officer beforehand so the most useful readings come first.

Inspection services for ships at Avilés

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

The Ría de Avilés: an industrial estuary on the Asturian coast

The port of Avilés occupies the lower reaches of a ría, a drowned river valley, and the outer area at San Juan de Nieva close to the breakwaters. Ships enter between the outer moles and then work up a dredged channel with industrial quays on both banks. The Cantabrian Sea off this coast can be rough from autumn to spring, and a north-westerly swell can keep ships waiting outside for a suitable tide and sea state. Once inside, the ría is sheltered, which makes alongside gauging comparatively comfortable for the technicians once the ship has berthed.

Traffic follows local industry. A large integrated steelworks on the ría takes iron ore, coal, coke and fluxes by sea, and ships it out as coil and plate. A primary aluminium plant and a zinc works nearby have historically added their own raw materials and metal products, and the Autoridad Portuaria de Avilés also handles fertiliser, scrap, wood products and general cargo. Most vessels are handy and supramax bulk carriers, coasters, metal carriers and the occasional tanker for the industrial users, together with port tugs, pilot boats and dredgers working in the channel.

Gauging demand here is therefore mostly structural wear in cargo spaces rather than hull fouling or machinery questions. Bulk carriers are surveyed on the enhanced programme and the quay stay can be used to measure hold frames, tank tops and hopper tank boundaries that cannot be reached at sea. General cargo ships carrying steel products arrive with local denting and thinning that owners want quantified before a survey or sale. Because many ships call repeatedly on the same ore or coil rotation, owners also gauge for trend: the same plates on the same frames, read every time the ship comes back.

Where a ship can be gauged in and around Avilés

Most work is done alongside at the industrial quays once discharge has opened the holds. Bulk carriers at the ore and coal berths can be gauged hold by hold as the grabs clear each space, subject to the terminal's safety rules and the ship's enclosed-space entry procedure. General cargo and metal carriers at the multipurpose quays allow access to the tank top, the hatch coamings and the underside of the hatch covers between cargo operations. Scrap and fertiliser calls are shorter, so the programme is cut down to the spaces that matter most.

Avilés is not a large-drydock port. Ships needing a dock for steel renewal normally go to a larger yard elsewhere on the northern or Galician coast, and readings taken in Avilés become the starting steel list for that docking. Small repair yards and slipways on the ría deal with coasters, tugs and workboats, and a technician team can gauge there when a vessel is hauled out. Anchorage work outside the breakwaters depends on sea state and is arranged through the ship's agent with a launch, but it is rarely the first choice on this exposed coast.

  • Ore, coal and bulk quays serving the steelworks: hold frame, tank top and hopper tank gauging during and after discharge
  • Multipurpose and metal-products quays: deck, coaming and hatch cover gauging on coil, plate and aluminium carriers
  • San Juan de Nieva outer area: general cargo and fertiliser berths for shorter-stay structural readings
  • Small ship-repair yards and slipways on the ría: coasters, tugs and workboats hauled for repair
  • Anchorage off the breakwaters: pre-arrival gauging by launch when sea state allows
  • Larger yards on the northern coast: docking-stage gauging after steel lists are prepared in Avilés

Thickness measurement through the survey cycle at Avilés

How much steel has to be gauged depends on which survey the ship is due for, its type and its age. The pattern below is the usual one under IACS unified requirements; the attending surveyor and the class rules for the ship decide the final extent. For a ship calling at Avilés, we agree the programme with the class and the owner before the team mobilises.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Port state control and the steel-trade backdrop

Ships calling at Avilés are inspected under the Paris MoU regime, carried out in Spain by marine inspectors attached to the Capitanía Marítima under the Dirección General de la Marina Mercante. Older bulk carriers and small general cargo ships on tramp rotations are frequent subjects, and inspectors pay close attention to hull condition, hatch covers and the state of cargo holds. A recent set of thickness readings gives the master something solid to show if structural questions arise, and gives the owner a record that stands independently of the last class report.

The EU Ship Recycling Regulation requires ships calling at EU ports to carry an Inventory of Hazardous Materials, and some owners combine IHM verification work with a structural check when a ship is approaching the end of its trading life. Carbon rules now bite on bulk tonnage too, because EU ETS covers voyages between EU ports and part of those starting or ending outside, and FuelEU Maritime has followed. A ship that must justify a retrofit or a long-term employment on the steel trade often asks first what steel it still has, and a gauging report is where that answer starts.

Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Avilés meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.

Typical gauging jobs at Avilés

Requests from Avilés are shaped by cargo wear and by owners running older tonnage on regular ore, coal or coil rotations. Most come from superintendents who know which holds worry them, so the first conversation is about the programme: which spaces, in what order, and what the ship's discharge window allows. Where cracking is likely at frame brackets or coaming corners, magnetic particle equipment travels with the team. Examples of work we see here include:

  • Hold frame and lower bracket gauging on a supramax carrying coal and ore, ahead of its special survey and measured against the class diminution limits.
  • Tank top plating and hopper tank readings on a handy bulker after a long run of abrasive cargo, grid-spaced so wear patterns are visible on the report.
  • Deck and hatch coaming gauging on a metal carrier whose decks take heavy coil loads, with magnetic particle testing at coaming corners.
  • Ballast tank readings on a coaster during a planned lay-by, producing a steel estimate for a docking at a yard along the coast.
  • Owner's condition gauging of an older general cargo ship being considered for purchase, covering holds, tank tops and main deck.

How a thickness measurement job runs at Avilés

A gauging job at Avilés runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.

Technicians usually fly from India to a European hub and then to Asturias Airport, which lies a short distance from the port, with Bilbao as an alternative when connections suit. Terminal access is arranged by the ship's agent, who also books a launch for any anchorage work. Spain is in the Schengen area, so visas must be issued before travel, and the team plans around that lead time and the vessel's expected arrival, especially in winter when weather can move the berthing time.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Handy and supramax bulk carriers
  • Metal and coil carriers
  • General cargo ships
  • Coasters and short-sea cargo ships
  • Fertiliser and scrap carriers
  • Small product tankers
  • Tugs and dredgers

Frequently asked questions

Can holds on a bulk carrier be gauged while it discharges ore or coal in Avilés?

Yes, once a hold has been emptied and cleared for entry. We agree the order of holds with the chief officer, wait for the ship's enclosed-space permit, and gauge frames, tank tops and hopper tanks while the next hold is still being worked. Dusty cargoes slow access, so a longer discharge produces a fuller set of readings than a short call.

Is there a drydock in Avilés for steel renewal after gauging?

Not for large merchant ships. Avilés has smaller repair facilities on the ría for coasters and workboats, while bigger vessels normally dock at yards elsewhere on the northern or Galician coast. Gauging in Avilés is often used to prepare the steel list, so the yard can order plate and plan crop-and-renew work before the ship arrives.

Does winter swell on the Asturian coast affect gauging at the quay?

Inside the ría the quays are well sheltered, so alongside gauging proceeds normally once the ship is berthed. The weather mostly affects arrival times, and a ship may wait outside for sea state. We keep technician travel flexible for this reason and adjust the schedule when the ship's agent reports a revised berthing time.

What is measured on general cargo ships that carry coil and plate?

The areas where concentrated loads act: tank top plating under stowage, hatch coaming tops and corners, the hatch cover skirts and the main deck around lashing points. Magnetic particle testing is added where cracks are suspected. The report records readings by plate or frame so that wear can be compared with earlier survey figures.

How early should a request for gauging in Avilés be sent?

As soon as the ship's schedule is known. Technicians need Schengen visas, and the measurement plan depends on which holds are being discharged and when. Short-notice requests are still worth sending with the berth, expected dates and scope, and we will tell you plainly whether a team can reach the ship in time.

Does thickness measurement at Avilés need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.