Maritime inspection · United Kingdom

Tanker Thickness Measurement at the Fawley Marine Terminal

Fawley is a tanker port first and last: crude carriers and product tankers come to the refinery jetties on the western shore of Southampton Water to discharge or load, and leave when the cargo is done. A tanker's time alongside is short and tightly controlled, so gauging here means choosing the right spaces. Atlantis mobilises technicians from India to board the ship at the jetty and work to the terminal's permit rules.

Ballast spaces while cargo moves

Cargo tanks are off limits while discharge or loading is under way, but segregated ballast tanks, peak tanks and cofferdams are not. We plan ballast-side readings that run in parallel with cargo operations.

Deck and piping outside the hazardous zone

Deck plating, external pipe runs and the engine room can be gauged within the terminal's permit system, with hot-work and spark controls agreed beforehand and enforced on the jetty and on board.

Evidence for vetting and docking

Charterers and terminals screen tankers closely. Fresh gauging gives a superintendent a documented condition record for vetting, and a steel estimate for the next docking at a yard elsewhere in Europe.

Inspection services for ships at Fawley

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

Fawley: refinery jetties on the western shore of Southampton Water

Fawley lies on the western side of Southampton Water, on the Hampshire shore between the Solent and the head of the estuary, facing Southampton's own docks across the water. The refinery stands on the shoreline with a marine terminal of several jetties reaching into deep water, and tankers arrive from the Solent with a pilot and tugs. The water is sheltered by the Isle of Wight, and Southampton's long period of high water gives deep-draught tankers more time at the jetty approach than most estuary ports can offer. Beyond the refinery, Calshot Spit marks the entrance to the water, and Hythe and Marchwood lie further up on the same shore.

Traffic is concentrated in a few ship types. Crude oil tankers, from medium-sized vessels up to larger crude carriers, arrive to discharge feedstock, and product tankers load petrol, diesel, jet fuel and other refined products for the UK coast and export. Coastal tankers and smaller chemical or bitumen ships also use the terminal. Tankers here spend a defined time alongside for discharge or loading, followed by departure on the tide, and a ship that has just finished a cargo may be gas-freed or in a ballast condition, which opens up different gauging options.

The result is a port where the scope is chosen by cargo status. A tanker discharging crude has cargo tanks full or part full and gas-dangerous, while the ballast tanks may be empty or in the course of being filled. A tanker on ballast after discharge is a better candidate for wider tank work, but terminals prefer ships to leave promptly. For superintendents, the best use of a Fawley stay is a carefully prepared set of readings in ballast spaces, deck and piping, with cargo-tank work left for a drydock or a gas-free anchorage visit.

Where a tanker can be gauged at Fawley

Gauging at the jetty is subject to the terminal's rules. The ship's agent submits the team's details in advance, the terminal issues passes, and the master and terminal agree the permit to work before anyone boards. Our equipment is chosen to suit the zone, and no hot work is carried out without a formal permit. Work starts at deck level, where plating, external pipe runs and coamings can be read, then moves into segregated ballast tanks, cofferdams and the engine room once the permits and gas-free status are in place.

There is no repair drydock at Fawley itself, and the Solent area has limited drydocking capacity for large tankers, so ships needing steel renewal usually dock at yards on the Continent or elsewhere in the UK. Gauging at the jetty provides the base for the steel list. A tanker waiting for a berth may lie at anchor in the Solent or off the Isle of Wight, where a short launch-borne deck scope is sometimes possible, though cargo-tank work is kept for gas-free periods.

  • Refinery marine terminal jetties: deck plating, external piping and manifold-area structure outside the cargo hazard zone.
  • Segregated ballast tanks at the jetty: double-bottom, wing and peak tanks prepared in advance and entered under permit.
  • Engine-room and sea-water piping: scrubber overboard lines and cooling systems on tankers fitted with scrubbers.
  • Cofferdams and void spaces: readings taken while cargo operations continue elsewhere on board.
  • Solent anchorages: short launch-borne scopes on tankers held for a berth or for tide.

Thickness measurement through the survey cycle at Fawley

Every renewal survey asks for more thickness measurement than the last, and for oil tankers, chemical tankers and bulk carriers the ESP Code adds close-up survey on top. The table is the usual shape of the work; the class rules and the surveyor set the exact extent, which is why the measurement plan for a job at Fawley is agreed in writing before mobilisation.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Port state control, tanker vetting and the rules at the jetty

Port state control in the UK is the Maritime and Coastguard Agency's responsibility, and the UK has applied Paris MoU practice through its own law since leaving the EU. Oil tankers older than a certain age are priority targets for expanded inspections, and an inspector who finds ballast tanks with extensive coating breakdown, or a deck with pitting, may ask for thickness records. For tankers under the Enhanced Survey Programme, thickness measurement at renewal surveys is mandatory, and gauging between surveys keeps the owner aware of trends.

Commercial vetting adds its own pressure. Terminal operators and charterers inspect tankers against industry vetting standards, and a vessel with a poor structural record may be refused. A superintendent managing a tanker fleet on the UK and North Sea trades therefore uses time at jetties such as Fawley to collect condition evidence. The IMO's rules on hazardous materials, EU ship recycling requirements for ships calling EU ports and the UK's own emissions reporting also influence decisions about whether to repair, scrub or retire an older tanker.

Ships trading to Fawley are inside a sulphur emission control area, where fuel must not exceed 0.10% sulphur unless an exhaust gas cleaning system (scrubber) is fitted. Scrubber wash-water piping, the overboard discharge and the hull penetration around it are among the fastest-corroding parts of a modern ship, so they belong in the gauging scope at every docking and, on open-loop systems, between dockings.

Typical thickness gauging jobs at Fawley

Work at Fawley is built around the permit system and cargo status. We agree a scope with the superintendent and the master that starts with the spaces always available during cargo work, namely ballast tanks, cofferdams, deck and piping, and extends to cargo tanks only when the ship is gas-free and the terminal consents. The readings go into the class TM format, with areas near the allowable diminution marked.

  • Segregated ballast tank gauging on a crude tanker during discharge, with the double bottom and wing tanks prepared by the crew.
  • Deck plating and external piping readings on a product tanker while loading, outside the hazardous zone and within the permit.
  • Forepeak, aft peak and cofferdam gauging on a coastal tanker as part of a pre-docking steel estimate.
  • Overboard discharge and scrubber wash-water pipe readings on a product tanker that runs an exhaust gas cleaning system.
  • Pre-purchase condition gauging of a product tanker lying alongside at the terminal.

How a thickness measurement job runs at Fawley

A gauging job at Fawley runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.

Southampton Airport is the nearest airport with limited services, and most teams fly into Heathrow or Gatwick and continue by road or rail towards Southampton and Fawley. The terminal controls access to the jetties, with passes issued through the vessel's agent, and some tasks need advance safety induction. Technicians travel from India on UK visas, applied for once the call is confirmed, and owners expecting repeat visits can keep visas in place. Launches for the Solent anchorages are arranged by the agent.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Crude oil tankers
  • Product tankers
  • Coastal tankers
  • Chemical and bitumen tankers
  • Tugs and terminal support craft
  • Pilot boats and mooring launches

Frequently asked questions

Can cargo tanks be gauged at the Fawley jetties?

Generally not while cargo is on board or being worked. Cargo tank entry needs a gas-free certificate and the terminal's agreement. The usual approach is to gauge ballast tanks, cofferdams, deck and piping at the jetty, and leave cargo-tank work for a drydock or a period when the ship is gas-freed and the terminal consents.

How does the permit system affect gauging at the terminal?

Every task needs a permit to work agreed by the master and the terminal before anyone boards. Hot work is excluded, equipment is selected for the zone, and the team follows the ship's enclosed-space entry procedure. We submit the team's details to the agent beforehand, so passes and safety inductions are ready when the ship is alongside.

Is there a drydock at Fawley for tanker steel renewal?

No. The Solent area has limited capacity for large tankers, so owners dock at yards elsewhere in the UK or on the Continent. Gauging at Fawley gives the steel estimate and the evidence for tender, helping the yard plan material and the class surveyor to agree the renewal list.

Can a tanker be gauged at the Solent anchorage?

A short deck and air-pipe scope is sometimes possible by launch if the weather and the pilot station allow safe boarding. Tank work at anchor needs gas-free status and is limited. For a full ballast programme, the jetty or a drydock is the realistic setting.

How is a Fawley job arranged with an India-mobilised team?

The superintendent supplies the ship's dates, jetty and scope. We apply for UK visas, book flights to London and onward travel, and submit the team's details to the agent for terminal passes. Cargo programmes change, so we keep the scope in priority order, and agree any change with the master and the terminal.

Does thickness measurement at Fawley need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.