Maritime inspection · Turkey

Ultrasonic Thickness Measurement for Ships Calling at Karadeniz Ereğli

Ereğli is a steel town on Turkey's Black Sea coast, and its port exists to serve the integrated steelworks behind it. Bulk carriers arrive with iron ore and coal and sail with steel products, so the ships are mostly Handysize to Panamax tonnage working a hard cargo programme. Atlantis sends technicians from India to the vessel for each job, and the gauging is planned around discharge sequences, loading windows and the anchorage waits that the coast's weather imposes.

Steel-trade bulk carriers

Iron ore and coal come in, coils, slabs and plate go out. That cycle works holds hard, and abrasion and corrosion of hold frames, hopper plating and tank-top plating are exactly what thickness measurement is asked to size.

Long discharge windows

Grab discharge of ore and coal empties holds one after another over days. As each hold is cleaned and declared safe, frames and bulkheads can be gauged without pulling the ship off its berth.

Steel scope before the Marmara

Heavy repair for Black Sea bulkers usually happens in the Marmara yards. Readings taken at Ereğli let a superintendent send yards a measured steel scope before the ship makes the passage.

Inspection services for ships at Ereğli

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

Ereğli: a steelworks port on the western Black Sea

Karadeniz Ereğli sits on the western Black Sea coast of Turkey, between Istanbul and Zonguldak, on an open shoreline with no natural harbour of any size. The port was built to serve the steelworks, and its breakwaters shelter a handful of berths where raw materials are discharged and finished products are shipped. Ships approach from the open sea, so swell and onshore winds matter more here than in a river or fjord port, and berthing slots are sometimes lost to weather in the winter months. Anchorage areas lie off the coast for ships waiting for a berth.

The traffic is dominated by dry bulk. Iron ore and coking coal arrive from the Black Sea, the Mediterranean and further afield, usually in Handysize, Supramax and Panamax bulk carriers, and the outbound trade is steel in the form of coils, slabs, plate and long products, carried by bulkers and general cargo ships with strengthened tank tops and large hatch openings. Because the cargo is dense and abrasive, ships calling here tend to show wear in the lower hold frames, the tank top, the hopper plating and the hatch cover and coaming structure, which is where gauging attention is usually concentrated.

The same ships often continue to other Black Sea and Marmara ports in a single voyage, and many are older vessels in regional trades whose owners watch their steel condition closely. Ereğli therefore sees both owner-driven condition gauging between cargoes and programmes timed to a coming special survey. There is no large commercial drydock at Ereğli itself for ocean-going ships, so the port's role in an inspection plan is usually early evidence, taken while the ship is discharging, that feeds a docking decision made elsewhere on the Turkish coast.

Where a ship can be gauged at Ereğli

At the steelworks berths, gauging follows the cargo operation. Holds are gauged one at a time as the grabs finish and the cleaning gang has swept the tank top, with the ship's crew preparing ventilation, lighting and safe access in advance and the master issuing the enclosed-space entry permit for each space. A bulk carrier that stays several days discharging can usually take a complete programme of frames, bulkheads and hatch coamings in that time, while a quick ore or coal discharge may support only a few holds. Access to the berths follows the port's own ISPS rules and is booked through the ship's agent.

When berths are occupied, ships wait at anchor off the coast. Those waits can be long enough for deck work, hatch cover panels and coamings, ballast tank readings and, where the holds are empty, hold structure. Boarding is by launch and is weather-dependent, so the programme is ordered with the highest-priority areas first. For a full docking-grade scope, owners generally plan the work in a yard in the Marmara, and the Ereğli readings become the preliminary steel estimate.

  • Steelworks bulk berths — hold frame, bulkhead and tank-top gauging on bulk carriers during grab discharge of ore and coal
  • Steel product berths — hatch cover, coaming and hold checks on general cargo ships and bulkers taking coils, slabs and plate
  • Outer anchorage off the coast — deck, hatch cover and ballast tank gauging on ships waiting for a berth, reached by launch
  • Ballast tank access during cargo work — topside, hopper and double-bottom tanks measured once emptied, ventilated and certified safe
  • Pre-docking checks before a Marmara yard call — an early steel list for the superintendent, built from readings taken in hold and tank

Thickness measurement through the survey cycle at Ereğli

How much steel has to be gauged depends on which survey the ship is due for, its type and its age. The pattern below is the usual one under IACS unified requirements; the attending surveyor and the class rules for the ship decide the final extent. For a ship calling at Ereğli, we agree the programme with the class and the owner before the team mobilises.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Black Sea trade, port state control and what drives inspection here

Turkey is a member of both the Black Sea MoU and the Mediterranean MoU, and bulk carriers on regional trades are regularly inspected under port state control. Structural condition is a recurring theme with older bulkers: wasted hatch coamings, corroded air pipe heads and wasting in hold frames are the sort of findings that lead a manager to commission gauging before the next inspection finds it first. Turkish-flag and Turkish-managed bulk tonnage is classed with a mix of international societies and the national society, and superintendents usually work to the class's own thickness measurement report format.

The Black Sea is outside the Mediterranean emission control area, so ships calling at Ereğli face the global fuel limit rather than the 0.10% area limit, although ships that continue into the Sea of Marmara cross into the ECA. For vessels that will later trade to European Union ports, the EU Ship Recycling Regulation requires a current Inventory of Hazardous Materials, and voyages touching EU ports bring EU ETS reporting. These rules do not change how steel is measured, but they do shape how owners decide when to dock a ship and how much steel work to put into it.

Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Ereğli meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.

Typical thickness gauging jobs at Ereğli

Work at Ereğli follows the steel cycle. A bulk carrier discharging ore or coal gives access to holds in sequence, a ship loading steel gives a shorter and busier window for hatch covers and decks, and a ship at anchor gives time for tanks. Most programmes are scoped by the superintendent as a preparation for a special or intermediate survey, a sale, or a charterer's inspection, and readings are sent to the technical department as each area is finished.

  • Hold frame, hopper and tank-top gauging on a Supramax bulk carrier discharging coking coal ahead of its third special survey in a Marmara yard.
  • Hatch cover panel, coaming and cross-deck gauging on a Handysize general cargo ship loading steel coils, to confirm which items need renewal at the next docking.
  • Ballast tank gauging on a Panamax bulker waiting at anchor for a berth, giving the owner's technical department an early view of topside and hopper tank condition.
  • Pre-purchase condition gauging of an older bulk carrier at the discharge berth, with the buyer's superintendent attending and holds opened for inspection.
  • Magnetic particle checks of hatch-corner and frame-bracket welds on a bulk carrier after cracking was reported at the same details on a sister ship.

How a thickness measurement job runs at Ereğli

The sequence for a thickness measurement job at Ereğli is short and written down, so the yard, the surveyor and the superintendent know who arranges what.

The nearest international airports are in Istanbul, with Sabiha Gökçen on the Anatolian side the more convenient for the coast road east, though the journey to Ereğli is by road and depends on traffic. Port passes at the steelworks berths and launches for anchorage work are arranged through the ship's agent, with crew lists and certificates sent in advance. Turkey requires a visa for Indian passport holders, so we begin the application once a call is likely and keep the validity covering the ship's expected window, which can shift with weather and berthing.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

We send the team from India to the ship for each job rather than keeping staff at the port, and plan the mobilisation around visas and the vessel's itinerary. The work is planned and supervised by the founder, our Responsible NDT Level III (ASNT NDT Level III in UT, RT, MT, PT and VT, with more than eleven years of international field experience). Technicians hold certification under the company's written practice to ASNT SNT-TC-1A; Atlantis is ISO 9001 and ISO 14001 certified.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Handysize and Supramax bulk carriers
  • Panamax bulk carriers
  • General cargo ships carrying steel
  • Multipurpose and heavy-lift ships
  • Coasters on Black Sea routes
  • Small tankers and bunker tankers
  • Tugs and harbour craft

Frequently asked questions

Can holds be gauged while the ship is discharging iron ore or coal?

Yes, one hold at a time. Once the grabs have finished a hold and the cleaning gang has swept the tank top, the master can issue the entry permit and we gauge frames, bulkheads and plating. Holds still being worked are left until later. The superintendent agrees the order of holds with us so that the most worn areas are measured first.

Is there a drydock at Ereğli for a renewal survey?

Not for ocean-going bulk carriers. Owners usually dock in the Marmara region or at a yard elsewhere on the Turkish coast. What Ereğli offers is the chance to take readings during cargo work, so the steel estimate is ready before the ship reaches the yard and the yard can order plate and plan the work earlier.

What can be done if the ship has to wait at anchor off Ereğli?

A wait for berth is useful time. Deck plating, hatch covers, coamings and ballast tanks that the crew have prepared can be gauged, and empty holds can be measured if they are safe to enter. Boarding is by launch and depends on sea conditions, so we agree a priority list and measure the key areas first.

Do winter conditions on the Black Sea coast affect gauging?

They can. Swell and strong onshore winds may delay launches at the anchorage and disturb berthing slots, and cold weather makes outdoor work on deck slower. Inside holds and tanks the conditions are steadier. We build slack into the plan and move interior work forward when deck work is not possible.

Does thickness measurement at Ereğli need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.