Maritime inspection · Bulgaria
Ultrasonic Thickness Measurement and Hull Gauging in Varna
Varna is the centre of Bulgarian dry-bulk ship management and the place where many Black Sea grain and fertiliser carriers go for repair. If your bulk carrier or general cargo ship is working cargo at Port Varna East or Varna West, or is booked into one of the city's repair yards, a gauging team mobilised from India meets it, lays out measurement points against the survey scope and hands over records the attending surveyor can work from.
Two repair yards in the city
Varna has two established repair yards, MTG Dolphin and Odessos Shiprepair Yard. A drydock stay at either is the window to gauge bottom plating, sea chests and side shell before the steel list is fixed.
Bulk-trade wear in holds
Bulk carriers loading fertilisers at Varna West, and grain ships worked hard by grabs, show wastage on hold frames, lower brackets, hopper plating and hatch coamings. Gauging maps it before the next renewal survey does.
Schengen visas, planned early
Bulgaria has been a full Schengen member since January 2025, so the team travels on Schengen visas. We start the application once the yard slot or loading window is firm and share the visa timeline with you.
Inspection services for ships at Varna
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreVarna's two port areas and their shipping
The Port of Varna works from two separate areas. Varna East sits in the city on Varna Bay and handles general cargo, containers and project cargo. Varna West lies inland at the far end of the lake and canal system, close to the Devnya industrial zone, and is the bulk side of the port: grain, fertilisers, soda ash, cement and other dry cargoes cross its berths. Ships bound for Varna West, and for most repair berths, pass through the canals that join Lake Varna to the sea, so a single call can combine cargo work, a yard stay and lay-by time within a short distance of each other.
Varna is also home to Navigation Maritime Bulgare, the country's main dry-bulk owner, to a cluster of crewing agencies and ship-management companies, and to the Nikola Vaptsarov Naval Academy. For managers in the city, a ship calling at its home port is the easiest moment for a superintendent to attend the gauging in person and walk the holds with the team. Grain loading follows the Bulgarian harvest, and ships waiting at the Varna Bay anchorage for a berth or for cargo can have idle days that suit tank and hold gauging.
What sets inspection demand apart here is the age and employment of the tonnage. Black Sea grain, fertiliser and steel trades have long been worked by older bulk carriers and general cargo ships, and once a ship reaches its third renewal survey, the required close-up survey and thickness measurement in holds and ballast tanks rise sharply. Fertiliser residues and moisture attack hold frames and lower brackets, grabs gouge tank-top and hopper plating, and hatch covers take years of wave loading on short-sea passages. The result is steady demand for gauging that tells an owner, before the yard submits its repair offer, how much steel the next survey is likely to need.
Where ships are gauged in and around Varna
The two repair yards are the natural places for a full gauging programme. MTG Dolphin combines ship repair with newbuilding work, and Odessos Shiprepair Yard concentrates on repair and drydocking. In dock, the team can reach bottom and bilge plating, the sea chests and the lower side shell, while staging rigged for the repair gives reach to the upper frames in the holds and to hatch cover undersides that would otherwise need a cherry-picker. Gauging in the first days of the stay, before staging is moved, lets the yard and class agree the renewal list from measured figures rather than estimates.
Outside the yards, gauging is done afloat. At Varna West the holds of a bulk carrier can be measured after discharge and before loading, and ballast tanks can be entered whenever the chief officer has them ventilated and the entry permit signed. At Varna East and at the bay anchorage, the usual scope is deck plating, hatch coamings, air pipes and ventilators, deck piping and whichever tanks are empty, with the work fitted around cargo operations, bunkering and any port state control visit. Each location has its own access rules, and the plan is written around them before the team travels.
- MTG Dolphin — Varna ship repair and newbuilding yard; drydock stays give access to bottom, bilge and side shell plating for renewal-survey gauging.
- Odessos Shiprepair Yard — repair and drydocking yard in Varna; suited to pre-repair gauging of holds, ballast tanks and hatch covers while the yard's staging is in place.
- Port Varna West — bulk berths near Devnya; empty holds between discharge and loading allow frame, bracket and hopper plating to be gauged.
- Port Varna East — city terminal for general cargo and containers; deck, hatch coaming and deck-piping gauging during the cargo call.
- Varna Bay anchorage — ships waiting for a berth or cargo; ballast tank and deck gauging with launch access arranged through the ship's agent.
Thickness measurement through the survey cycle at Varna
Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at Varna usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Port state control, emissions rules and Black Sea trading conditions
Bulgaria, as an EU member state, inspects ships under the EU port state control directive and holds membership of both the Paris MoU and the Black Sea MoU. On older bulk carriers, structural findings such as wasted hatch coamings, holed air pipes and corroded deck fittings can turn a routine inspection into a deficiency to be rectified before departure, with class called in and repairs agreed before the ship sails. Having measured thicknesses on file, or having them taken while the ship is still alongside, gives the owner and the class surveyor the figures they need to settle on a permanent or temporary repair.
No emission control area covers the Black Sea, which leaves ships at sea on the global 0.50% sulphur cap; at a Bulgarian berth, though, EU law requires fuel of 0.10% sulphur or less, or an equivalent abatement method. Voyages to and from Varna are covered by the EU ETS, which has applied to shipping since 2024, and by FuelEU Maritime since 2025; both now sit alongside steel condition in decisions about whether to keep, retrofit or sell an older ship. Trading conditions in the Black Sea have changed since the war in Ukraine began in 2022, with routing and war-risk cover set by owners and underwriters. That affects voyage planning more than gauging alongside in Varna, and we follow the owner's security guidance when scheduling attendance.
Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Varna meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.
Typical thickness gauging jobs in Varna
Requests for ship inspection in Varna tend to follow the bulk trades and the repair calendar. The jobs below are the patterns that fit the port's mix of yard stays, cargo windows and anchorage waits. Each is scoped from the ship's survey status, the class requirements for thickness measurement at that survey and the access the yard or terminal can give, and the plan is confirmed with the superintendent before anyone travels.
- Third renewal survey of a handysize bulk carrier at a Varna yard: hold frames, hopper and topside tanks, hatch covers and coamings gauged early so the steel list is agreed before cropping starts.
- Pre-docking gauging in Varna Bay on a supramax lying at anchorage a few weeks before its yard slot, giving the owner measured wastage to order steel and plan the yard period against.
- Re-gauging at an annual survey of areas recorded with substantial corrosion at the last renewal, carried out in empty holds at Varna West between discharge and loading.
- Condition gauging for a buyer inspecting a general cargo ship for purchase, covering deck, hatch cover, hold and shell plating while the vessel lies alongside in Varna.
- Ballast and fire-main pipe wall measurement during a repair stay, mapping thinning on deck and engine-room lines so pipe renewal is ordered once, in the right lengths.
How a thickness measurement job runs at Varna
A gauging job at Varna runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.
The team flies into Varna Airport, or into Sofia for wider international connections and onward travel to the coast. The repair yards and the Port Varna terminals are ISPS facilities, so gate passes for the technicians and their equipment are requested through the ship's agent or the yard's security department with passport details in advance; at the anchorage, the agent books the launch. Because Bulgaria is in the Schengen area, the team needs Schengen visas, and we schedule mobilisation from India around the visa decision as well as the ship's arrival, so tell us the yard or ETA window as early as you can.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Handysize and supramax bulk carriers
- General cargo and multipurpose ships
- Coasters and mini-bulkers
- Container feeder ships
- Product and chemical tankers
- Dredgers and work vessels
Frequently asked questions
Can you gauge a bulk carrier at a Varna yard before the repair specification is fixed?
Yes, and that is the most useful timing. If the team gauges at the start of the stay, the yard and the class surveyor can agree the renewal list from measured figures, and steel can be ordered once. Send us the last thickness measurement report, the survey status and the yard dates, and we will lay out the measurement points before the team leaves India.
Do you offer thickness measurement in Bulgaria outside Varna?
Yes. The same team can attend ships at Burgas, at the Rosenets oil terminal and at anchorages along the Bulgarian coast, and can continue to Constanța in Romania if a fleet has several ships in the area. Grouping calls on one mobilisation makes better use of the Schengen visas and the travel from India.
Can gauging continue while the ship loads grain at Varna West?
Holds cannot be gauged once cargo is in them, so hold work has to happen between discharge and loading or before the first hatch opens. Ballast tanks, the deck, hatch coamings and deck piping can usually be measured during loading, provided the chief officer agrees tank entry and the work stays clear of the stevedores and the cargo gear.
How far ahead should we book UTM in Varna for a drydock?
The moment the yard slot is firm. The limiting step is the Schengen visa for technicians travelling from India, not the gauging itself, so early notice lets us fix travel dates around the docking. If the docking moves, tell us straight away and we re-plan the mobilisation to match the new dates.
Does thickness measurement at Varna need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.