Ship Thickness Measurement at the Altınova Shipyards, Yalova
Yalova's Altınova shipyard zone, on the southern shore of the Sea of Marmara near the mouth of the Gulf of Izmit, is a concentrated cluster of Turkish shipyards for newbuilding, conversion and repair. Ships arrive here for docking, renewal surveys and steel renewal, and the gauging plan decides how quickly the yard can start on the steel. We mobilise a team from India for thickness measurement in Yalova, timed to the docking and coordinated with the yard and the superintendent.
Gauging timed to the dock
In-dock gauging at Altınova is planned around the docking programme: bottom and side shell while the ship is dry, tanks as they are cleaned and certified, with readings passed to the yard as each area is finished.
Pre-docking steel estimates
Readings taken before the ship arrives, at anchor off Yalova or at its last cargo port in the Marmara, let the yard order plate and plan staging and labour before the ship is opened up.
Close to Tuzla and Kocaeli
Altınova lies across the water from Tuzla and close to the Kocaeli terminals, so jobs in the Yalova yards can be combined with work at Tuzla or in the Gulf of Izmit within one mobilisation.
Inspection services for ships at Yalova
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreYalova and the Altınova shipyard zone
Yalova is a province on the southern shore of the Sea of Marmara, across the water from Istanbul and linked to it by fast ferries and, by road, through the Osmangazi Bridge over the Gulf of Izmit. Its maritime identity rests on shipbuilding rather than cargo. The Altınova shipyard zone, east of the city near the entrance to the gulf, has developed into a cluster of yards building and repairing ships for Turkish and international owners, with floating docks, building berths and outfitting quays side by side.
The yards at Altınova build tugs, ferries, chemical and product tankers, offshore and fishing vessels and other specialised ships, and many of them also take ships for docking, repair and conversion. Yalova ship repair brings in bulk carriers, tankers, general cargo ships and ro-ro vessels from owners in Turkey, Greece, the Black Sea countries and beyond, often for renewal surveys where steel renewal is expected. Because the yards are a short passage from the Istanbul anchorages and the Kocaeli terminals, ships can come in from their last cargo port in the Marmara with little deviation, and superintendents from Istanbul can attend daily. Dry docking in Yalova is normally planned well ahead, which leaves time to plan the gauging properly too.
Inspection demand in Yalova is defined by the yard stay. Ships are here specifically to be docked and repaired, so the gauging extent is often the full extent the survey in hand requires, and its timing matters: readings that arrive late hold up steel renewal, staging and the undocking date. For older ships at their third or fourth renewal survey, gauging and steel renewal are often the critical path of the whole docking, and the superintendent needs measured data early to control it. Conversion projects add their own needs, such as establishing the condition of structure that will be reused in the converted ship.
Where we gauge in the Yalova yards
Most work is in floating docks and at the repair quays of the Altınova yards, under each yard's safety, permit and access rules. In dock, we measure bottom plating, bilge, side shell and sea chests while the hull is dry and staging or access platforms are in place, and gauge cargo holds, ballast tanks and cargo tanks as they are cleaned, gas-freed and certified. Alongside, before or after docking, the focus shifts to decks, hatch covers, internal structure and piping systems, which can be reached without holding up the dock.
Pre-docking gauging is done at anchor off Yalova or at the ship's last port, so that the yard receives a steel renewal estimate before the docking date. After steel renewal, we can re-gauge adjacent plating that was close to the renewal limit, so the superintendent has a complete record to put before the attending class surveyor. Each yard runs its own gate and permit procedures, which the ship's agent and the yard's project manager arrange before the team arrives. In-dock thickness gauging and the post-renewal checks go into one report, so the surveyor sees the whole picture rather than two partial ones.
- Floating docks at the Altınova yards — bottom, bilge, side shell and sea chest gauging while the ship is dry during the renewal or docking survey
- Repair quays in the yard zone — gauging of holds, tanks, decks, hatch covers and piping before and after docking
- Anchorage off Yalova — pre-docking gauging on ships waiting for a dock, giving the yard a steel estimate before arrival
- Conversion berths — condition gauging of existing structure to be retained in conversion projects, marked against the conversion drawings
- Tuzla yards and Kocaeli terminals nearby — combined programmes across the eastern Marmara within one mobilisation
Thickness measurement through the survey cycle at Yalova
Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at Yalova usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Regulation and market context for Turkish shipyards
Yalova lies on the Sea of Marmara, outside the Mediterranean SOx ECA (which ends at the entrance to the Dardanelles), and Turkey participates in both the Mediterranean MoU and the Black Sea MoU on port state control. For a ship in a Yalova dock, the regulatory work is mostly class and flag: renewal and docking surveys, the ESP requirements for oil tankers, chemical tankers and bulk carriers, and any port state control deficiencies carried in from previous ports. A docking is also the natural time to deal with scrubber wash-water and overboard piping, which is easiest to repair at the shell connections with the ship dry.
The market around the yards is competitive and international. Turkish shipyards compete for European and regional repair work with yards in the Black Sea, the Mediterranean and the Middle East, and schedule reliability is a central factor in choosing between them. That puts weight on early, organised gauging: a yard can only commit to an undocking date once it knows the steel scope, and owners who bring measured readings to the discussion are better placed to agree a realistic programme. Ships with EU owners or trading to EU ports also carry EU ETS and FuelEU obligations on those voyages.
Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Yalova meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.
Typical thickness gauging jobs in Yalova
Nearly all Yalova jobs are linked to a docking. A superintendent sends the survey status and previous thickness reports, we agree a gauging plan with the yard's project manager, and the team arrives for pre-docking readings or for the first days of the docking. Thickness measurement in Yalova is therefore planned in detail before travel, not worked out on arrival.
- Third renewal survey gauging on a chemical tanker in an Altınova floating dock, measuring bottom and side shell while dry and cargo and ballast tanks as they are certified.
- Pre-docking gauging on a Handysize bulk carrier at anchor off Yalova, with hold frames, hopper plating and topside tanks measured so the yard can order steel before docking.
- Gauging of existing structure on a ship coming in for conversion, to confirm which plating and stiffeners can be reused in the new arrangement.
- Re-gauging of plating adjacent to renewed areas on a general cargo ship after steel renewal, completing the record for the attending surveyor.
- Sea water, ballast and fire main piping inspection on a ro-ro ship during its docking, ahead of the yard's pipe renewal decisions.
How a thickness measurement job runs at Yalova
A gauging job at Yalova runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.
The team flies into Istanbul, usually Sabiha Gökçen Airport, and reaches Yalova by road over the Osmangazi Bridge or by fast ferry from Istanbul. Each yard in the Altınova zone has its own gate procedures, so access is arranged through the yard's project manager and the ship's agent, with crew lists, technician certificates and equipment details sent in advance; launches for anchorage work are booked by the agent. Turkish visas are required for technicians travelling from India, so we apply once the docking date is set and ask to be told at once if the yard moves the slot.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Chemical and product tankers
- Bulk carriers
- General cargo ships
- Ro-ro ships
- Tugs and offshore vessels
- Ferries
- Fishing vessels
Frequently asked questions
When should gauging start for a docking at Altınova?
Ideally before the ship arrives. Pre-docking gauging at anchor or at the last cargo port gives the yard a steel estimate before docking. Where that is not possible, we aim to start in the first days in dock with the areas most likely to need renewal, so steel ordering is not held up while the rest of the ship is measured.
Can you work within the yard's own schedule and permits?
Yes. Every Altınova yard runs its own permit-to-work, gas-free certification and access procedures, and we follow them. We agree a gauging sequence with the yard's project manager so that staging, cleaning and gas-freeing are done in the order that suits both the measurement and the steelwork, and so the dock is not kept waiting on readings.
Do you measure structure on ships coming to Yalova for conversion?
Yes. In a conversion, the owner needs to know which existing structure can be kept. We gauge plating and stiffeners in the areas to be retained or modified, mark readings against the conversion drawings, and identify where wastage would make reuse impractical, so the design and steel quantities rest on measured data.
Can one trip cover yards in Yalova and Tuzla?
Yes. The two shipyard areas face each other across the eastern Marmara and are linked by road and ferry. If you have ships docking in both within a short period, we plan a single mobilisation with a visa period that covers both, and sequence the jobs around each yard's docking dates.
Does thickness measurement at Yalova need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.