Maritime inspection · Montenegro
Docking and Refit Thickness Gauging at Bijela, Montenegro
Bijela is a shipyard settlement on the western shore of the Bay of Kotor, near Herceg Novi and the Kamenari ferry crossing. The yard has historically repaired and built merchant ships, and its slipway and dock facilities now draw refit work on large yachts and small vessels. Atlantis NDT supports these dockings with ultrasonic gauging, using technicians who travel from India and are not based in Montenegro.
A yard for dockings, not call days
Bijela is where hull work is done, so gauging here is a docking programme: bottom plating, shell, rudder and tanks read while the vessel is out of the water, with results feeding straight into steel renewal decisions.
Refit decisions made on measured steel
A yard specification needs plating thicknesses before blasting and coating. Readings taken early let the owner, the surveyor and the yard agree on renewal areas before the dock schedule tightens.
On the Kamenari side of Verige
Bijela lies near the narrow Verige channel, where a short car ferry crosses between Kamenari and Lepetani. Road access is simple from Herceg Novi, and gauging teams reach the yard from the coast without crossing the bay.
Inspection services for ships at Bijela
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreBijela and the western side of the Bay of Kotor
Bijela is a small settlement within Herceg Novi municipality, on the western shore of the Bay of Kotor and a short distance from the narrow channel of Verige. Its waterfront has been shaped by shipbuilding for generations, and the yard's slipway and dock area are the largest repair facility in Montenegro. The surrounding water is calm, deep and well protected, which makes the site attractive for work that needs stable conditions, such as blasting, coating and precise thickness measurement.
Traffic at Bijela is unlike that of Kotor or Bar. There are no scheduled services and no cargo terminal: ships come for repair, refit or conversion, stay for the length of the job and then leave. Large yachts and small commercial vessels form the core of the work, and the redevelopment of the site towards yacht refit has changed its character from merchant shipbuilding. Ships and yachts that arrive here have usually been planned for months, and a thickness programme can be built into the work list from the start.
For inspection, the yard environment is what makes Bijela different. A hull out of the water and with old coating removed is the best condition in which plating can be gauged, and every reading can be mapped to a frame and plate. Tanks open for entry and cleaning give access to internal structure at the same time. The attending surveyor and the yard planner can see steel renewal areas on the day, and the owner's superintendent can approve or revise the specification while the ship is still in the dock.
Where gauging happens at the yard
Within the yard, gauging is done on the vessel's hull and internal structure in whichever dock or slipway position it occupies. On a dry hull the technicians work along shell, bottom, bilge keels, rudder and propeller area from ground level or from staging, using couplant suited to the surface state. Inside, tanks that have been cleaned, ventilated and tested are entered under a permit, and gauged along bulkheads, floors and longitudinals. Yard staff control access, lifting and hot work, so the sequence of blasting, gauging and steel work is agreed with the yard planner before the ship enters the dock.
Ships and yachts that need a pre-docking record can be gauged afloat before arrival, at a berth in Tivat or Kotor or at an anchorage in the bay, and then at the yard for the docking itself. Using the same team for both stages keeps measurement points aligned from estimate to final steel report. For larger commercial ships, the Adriatic yards in Croatia and Italy remain alternatives, and the bay's shipyards compete with them mainly on yacht and small-ship work.
- Dry-docked or slipway hull: shell, bottom plating, rudder and propeller area gauged after coating removal
- Cleaned and gas-free tanks: bulkhead, floor and longitudinal readings through tank entry under permit
- Afloat berth at the yard quay: deck, superstructure and accessible tank boundaries before or after the dock period
- Pre-arrival gauging at Tivat or Kotor: steel estimate for the yard from a berth elsewhere in the bay
- Final steel check after renewal: plating readings to confirm the work against the specification
Thickness measurement through the survey cycle at Bijela
Every renewal survey asks for more thickness measurement than the last, and for oil tankers, chemical tankers and bulk carriers the ESP Code adds close-up survey on top. The table is the usual shape of the work; the class rules and the surveyor set the exact extent, which is why the measurement plan for a job at Bijela is agreed in writing before mobilisation.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Regulation and the Montenegrin yard setting
Bijela is in Montenegro, a Paris MoU member, and the Maritime Safety Administration oversees ships and ports there. A ship that has been repaired at a Montenegrin yard re-enters service under the same inspection regime as any other ship in the region, so documented steel work matters when the ship next calls at a Paris MoU port. Class societies attend docking surveys and set the rules for steel renewal limits, while the yard follows the owner's specification and the surveyor's decisions on the day.
Montenegro is not in the EU, but many ships repaired here trade to EU ports and fall under EU requirements, including the hazardous materials inventory for ships calling there and the carbon rules for voyages touching EU ports. Where thickness readings are meant for credit to a class docking survey, the firm taking them must be acceptable to that society, and the superintendent should confirm this at planning. Readings taken for the owner's estimates and for the yard's quotation are used independently of class. Entry rules for visiting technicians are national and checked in advance.
Since 1 May 2025 the whole Mediterranean has been a sulphur emission control area, so ships calling at Bijela burn 0.10% sulphur fuel or run a scrubber. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service and are worth adding to the gauging scope at every docking.
Typical thickness gauging jobs at Bijela
Bijela jobs follow the yard calendar: a docking is booked, the hull is blasted, and gauging fits into the days between coating removal and steel work. Superintendents benefit from sending us the plating plan, the previous survey's thickness report and the yard's docking schedule early. We use these to plan the team size and the order of measurements, and to check Montenegrin entry lead time before travel from India.
- Full bottom and shell plating gauging on a yacht on the slipway, after blasting and before steel renewal is marked
- Tank bulkhead and double-bottom readings on a small tanker or workboat under docking survey
- Rudder, stock area and propeller shaft bossing gauging on a vessel in dock, supporting a class surveyor's attendance
- Pre-arrival steel estimate on a ship afloat at Tivat, passed to the yard before the dock date is fixed
- Post-renewal plating check on new insert plates, confirming thickness against the drawing and the yard's specification
How a thickness measurement job runs at Bijela
Most of the work on a Bijela job happens before the team boards: scope, plan and access are settled first, so the time on board goes on measurement.
Tivat Airport is the nearest, followed by Dubrovnik in Croatia, and both are within a road transfer of the yard along the bay. Herceg Novi is close and the yard issues its own access passes through the owner's representative or the yard planner. Montenegro operates its own visa rules, separate from Schengen, so we check what Indian technicians need when an enquiry arrives and set the mobilisation date accordingly. Yard schedules rarely move for visa delays, so early notice matters.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
The inspection team is mobilised from India for each job; nobody is stationed at the port, so mobilisation is planned against the vessel's schedule and visa lead times. Our founder and Responsible NDT Level III, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has over eleven years of international field experience, plans and supervises the work. Technicians are certified under the company's written practice to ASNT SNT-TC-1A, and the company holds ISO 9001 and ISO 14001 certification.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Large steel yachts
- Small tankers and bunker barges
- Workboats and tugs
- Coastal passenger ships
- Small general cargo ships
- Pilot and patrol boats
- Floating craft under conversion
Frequently asked questions
Is Bijela used for commercial ships or only for yachts?
Historically it was a commercial ship repair and building yard, and today the focus has shifted towards yacht and small-ship refit. What the yard can take at any time depends on its current facilities and schedule, so we confirm the docking arrangement with the owner's superintendent before planning the gauging programme.
When in the docking should thickness gauging be carried out?
After coating removal and before steel renewal areas are marked. That gives clean surfaces for readings and lets the surveyor and the yard see where plating is below the renewal limit. Tank gauging follows cleaning and gas-free certification, and a final check confirms the new insert plates.
Can you gauge before the ship arrives at Bijela?
Yes. A pre-arrival survey afloat at Tivat, Kotor or an anchorage in the bay gives the yard steel estimates before the dock date is fixed. The same technicians can then attend the docking, which keeps measurement locations the same from estimate to final report and reduces repetition.
How do you reach a shipyard in Montenegro from India?
The team travels by air to Tivat, Dubrovnik or Podgorica and continues by road. Montenegro applies its own entry rules to Indian citizens, so we check them when the enquiry comes in, add the lead time to the plan and confirm the yard's site access arrangements with the owner's representative.
Does thickness measurement at Bijela need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.