Maritime inspection · Spain
Ship Thickness Surveys in Alicante: Ferries, Cruise Ships and Bulk Cargo
Alicante's harbour sits right in front of the city and works as a ferry port to Algeria and the Balearic Islands, a cruise stop and a smaller cargo gateway for cement, stone and general freight. Ships on fixed timetables are easy to plan around, and that suits ultrasonic gauging. We send technicians from India to the vessel, with port passes arranged by the ship's agent, and match the scope to what each ship type can offer alongside.
Algeria and Balearic ferry rotations
Ferries sailing to Oran, Algiers and the islands lie alongside between departures. That gap is long enough for focused readings of ramps, car decks, ballast tanks and fire main piping when access is prepared by the crew.
Cruise calls with limited hours
Cruise ships dock for a day and leave, so gauging is limited to prepared spaces. Voids, sea-water lines and tanks selected by the technical department give useful readings without disturbing guests or the sailing time.
Bulk and general cargo stops
Ships loading cement, stone or salt-related cargoes from this stretch of coast give access to holds and decks between operations. We read frames, coamings and tank tops once the hold is clear and the loading plan allows.
Inspection services for ships at Alicante
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreThe port of Alicante: passenger quays beside the old town
The Autoridad Portuaria de Alicante manages a compact harbour in the centre of the city, framed by breakwaters that shelter a basin open to the south-east. The approach is uncomplicated and the pilots board outside the entrance, although a brisk easterly can make the entry lively and delay a ship. Passenger and ferry terminals occupy the quays closest to the seafront and the Santa Bárbara hill, while cargo berths are placed on the outer and southern sides, so the commercial and leisure uses of the harbour are kept apart.
Alicante's passenger traffic is varied. Ferries cross to the Algerian ports of Oran and Algiers, and services link the city with the Balearic Islands during the summer season. Cruise ships call throughout the year, and the port is also popular as a yacht base, which means the basin carries a lot of marina traffic as well. On the cargo side, the port ships cement, stone, aggregates and general goods, and trades in cereal and fertiliser pass through in smaller volumes. The nearby salt works at Torrevieja send out salt through their own harbour, so some bulk tonnage in this area never calls at Alicante itself.
Seasons set the rhythm. Passenger services peak in summer, and ferries run hard when returning families and holidaymakers fill the decks. Winter is the quiet period when ships schedule maintenance and surveys, often elsewhere. Tidal range is small and has little effect on berth depth, so planning is shaped by wind, berth allocation and the ship's schedule. The anchorage off the port is used by ships waiting for a berth or for cargo, and some coasters spend several days there between voyages. Good agent liaison is the key to a smooth survey, because quay space can change at short notice.
Where gauging happens in Alicante
Most thickness work in Alicante is done at the berth. Ferries on the Algerian route have a few hours between arrival and departure, and between those the ramp, car deck and tank tops are accessible once the vehicles are gone. Cruise ships have their turnaround time, and the technical department can have selected spaces ventilated and tested. Cargo ships at the outer quays give longer stays and easier access to holds, decks and hatch covers, as long as the terminal agrees and the cargo plan leaves space clear.
There is no drydock for ocean-going ships in the harbour. Small craft, tugs and yachts are handled by local boatyards, but merchant ships needing steel renewal usually dock at Cartagena, Valencia or a yard further afield. This makes Alicante a good place to prepare the docking: readings taken here give the superintendent a measured scope to take to the yard, and the technicians can continue the work at the docking port if required. Anchorage jobs are possible for short sampling work when a launch and calm water are available.
- Ferry berths for Algeria and the islands — ramp, car-deck, ballast tank and fire main gauging between departures
- Cruise quays — voids, sea-water cooling lines and scrubber piping on turnaround days, as prepared by the technical department
- Outer cargo quays — hold frame, hatch coaming and deck readings on bulk carriers and general cargo ships
- Boatyards for tugs and small craft — hull plating readings before a haul-out or repair
- Alicante anchorage — short sampling jobs on coasters and bulkers waiting for a berth or orders
- Docking yards at Cartagena and Valencia — gauging started here continues alongside the docking survey
Thickness measurement through the survey cycle at Alicante
Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at Alicante usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Port state control and shipping context for Alicante
Port state control is exercised in Alicante under the Paris MoU by the Capitanía Marítima, part of Spain's Dirección General de la Marina Mercante. Ferries on international routes to Algeria receive attention to structure, watertight integrity and fire safety, and corrosion of ballast tanks and piping can be recorded as a deficiency if a master cannot show measurements. Cruise ships and cargo vessels face the same checks, and recent thickness readings are a practical response when an inspector asks about condition.
EU measures add context for owners operating from Spanish waters. Ships calling at EU ports need an Inventory of Hazardous Materials under the Ship Recycling Regulation, and EU ETS and FuelEU Maritime shape decisions on energy and retrofits for ferry and cruise operators. The Algerian service is run with fairly mature tonnage, and operators look at how much steel will need to be renewed before committing to another season. Where a retrofit exposes structure that is normally closed up, taking readings at that moment can prevent a repeat visit to the same space later.
Since 1 May 2025 the whole Mediterranean has been a sulphur emission control area, so ships calling at Alicante burn 0.10% sulphur fuel or run a scrubber. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service and are worth adding to the gauging scope at every docking.
Typical gauging work at Alicante
Work at Alicante usually fits one of three patterns: programmed visits to ferries on set rotations, short calls on cruise ships, and longer work on cargo ships with time alongside. Scope, access and report layout are agreed with the superintendent before the technicians travel, so the hours at the quay are spent measuring. Examples that suit this port:
- Car-deck, ramp and ballast tank gauging on an Algeria route ferry during a winter lay-over.
- Sea-water line, void and scrubber piping readings on a cruise ship on a turnaround day.
- Hold frame and hatch coaming gauging on a bulk carrier after discharge at the outer quay.
- Pre-docking steel estimate on a coaster or ferry, with readings taken in Alicante before the yard in Cartagena or Valencia is selected.
- Condition gauging on a ship being sold or chartered, giving the buyer measured hull and tank data.
How a thickness measurement job runs at Alicante
A gauging job at Alicante runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.
Alicante-Elche Airport is a short road journey from the port and has wide European connections, plus routes through Gulf and other hubs that suit travel from India. The ship's agent arranges port passes for the ferry and cargo areas and a launch for any anchorage work. Schengen visas are required for the technicians, so send the vessel's dates as early as you can; once visas are issued we confirm mobilisation against the ship's timetable.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Ro-pax ferries to Algeria
- Balearic ferries
- Cruise ships
- Bulk carriers
- General cargo ships
- Coasters
- Tugs and workboats
Frequently asked questions
Can an Algeria ferry be gauged between departures?
Often, yes. With ramps down and car decks empty, plating, ballast tanks and piping can be gauged if the crew prepares access. The time between arrival and sailing is limited, so a targeted list works best; deeper programmes involving gas-freeing or staging are better placed in the ship's overhaul period.
Is there a drydock at Alicante?
Not for merchant ships of any size. Small craft and yachts use boatyards, while ferries and cargo ships needing renewal normally dock in Cartagena, Valencia or further afield. Gauging in Alicante gives the owner a measured steel estimate before a yard is chosen, and helps compare quotations.
What can be done during a cruise call?
Short readings in voids, sea-water piping, scrubber lines and selected tanks, provided the technical department prepares the spaces and entry permits in advance. Anything needing staging, cleaning or long gas-freeing should wait for a dry-dock period. We agree the list with the hotel and technical teams before the ship arrives.
Can ships at the Alicante anchorage be surveyed?
Short jobs are possible, depending on launch access, swell and the agent's clearance. A coaster or bulker waiting for cargo can give time, but it may move at short notice. We prefer a narrow, well-defined scope at anchor and leave larger programmes for a berth stop.
Are bulk carrier holds accessible at the outer quays?
After discharge and cleaning, yes, if the loading plan leaves the hold empty and the terminal permits entry. We read frames, hopper and bulkhead plating and hatch coamings, and stop when cargo operations resume. The hold order is agreed with the chief officer beforehand.
Does thickness measurement at Alicante need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.