Tank Inspection Services in Dubai 2026 — ASNT Level III Led

Atlantis NDT delivers tank inspection services in Dubai. Methods: UT (including PAUT and TOFD), RT, MT, PT and VT, with procedures and reports reviewed by an ASNT NDT Level III. Dubai facilities in the oil & gas, petrochemical, and downstream sectors require rigorous tank inspection services. Technicians are certified by their employer to its SNT-TC-1A written practice.

Tank Inspection Services Scope

Tank inspection covers: floor plates and bottom annulus via MFL; shell courses via UT thickness survey; roof, nozzles, and foundation via visual and settlement measurement — all per API 653, with API 650 new-construction alignment and EEMUA 159 guidance where applicable. Atlantis NDT Level III approves every Procedure + signs off final disposition + audit-ready records via Atlantis NDT ERP.

Code + Compliance

Tank Inspection Services per: ASME B&PV Sections V + VIII + IX + XI; ASME B31 piping series; API 510 + 570 + 571 + 579 + 580 + 581 + 653 + 1104 + 1169; ASTM E-series; ISO 17635/17636/17640; AWS D1.1/3.6; IACS Rec-20 marine; NACE MR0175 + MR0103 sour-service.

Free Consultation

Atlantis NDT publishes no pricing — varies by region + scope. Request your free 30-minute consultation. Every job is quoted on request. See also verticals, Dubai ERP, Dubai training, Dubai consulting.

What tank inspection involves

Aboveground storage tank inspection covers the shell, floor, roof and appurtenances, establishing minimum thickness by course, floor condition, settlement, and the resulting inspection intervals under API 653.

Scope of work

  • External inspection of shell, roof, appurtenances, foundation and containment
  • Ultrasonic shell thickness by course with minimum-required-thickness calculation
  • Floor scanning by magnetic flux leakage with ultrasonic prove-up of indications
  • Settlement survey and evaluation against API 653 Annex B criteria
  • Vacuum box testing of floor welds and, where required, hydrostatic testing after repair

Governing codes

API 653 for inspection, repair, alteration and reconstruction, API 650 as the construction code, API 575 for practice, and API 579 where fitness-for-service assessment is required.

The Dubai asset base

Dubai serves as the commercial nerve centre for Middle East energy operations, with ENOC, DEWA, and Emarat facilities concentrated across Jebel Ali and the broader UAE industrial corridor. The emirate's position as a logistics and engineering hub makes it ideal for managing digital twin data across offshore platforms, onshore storage tanks, and the complex pipeline infrastructure connecting Gulf production to export terminals. Extreme desert temperatures and coastal humidity create demanding corrosion environments where predictive maintenance planning through digital twin analytics delivers measurable ROI.

How the work is controlled

Agree personnel qualification, equipment checks, procedure revision and review responsibilities for the examination. Retain those records with the results and coverage limitations.

What you receive

  • A report in your required format, with findings located against the component and, where relevant, against a persistent corrosion monitoring location so trends stay continuous between campaigns
  • Raw data in the instrument-native format plus an open export, so the dataset outlives any single supplier relationship
  • The procedure revision, technician certification state and instrument calibration status applicable at the time of examination
  • Where a finding affects continued service, the specific code clause governing the acceptance decision

Related: asset integrity management software · inspection management software · ASNT Level III consulting · digital twin for asset integrity. Request a quote for Dubai.