Turnaround and shutdown inspection

A turnaround is the most expensive time to discover that the inspection scope was wrong. Inspection decisions drive the critical path: a finding late in the window becomes a repair, a material order and an extension. We plan inspection with the turnaround team months ahead, then run it on site with the people, equipment and reporting to keep pace with the schedule.

Before the outage

  • Inspection scope built from the RBI plan, inspection history and open recommendations, not from last turnaround’s list.
  • Inspection work packs per item: methods, coverage, access, cleaning, and the acceptance criteria to apply.
  • Contingency planning for likely findings: repair procedures, materials and FFS options agreed in advance.
  • Personnel and equipment plan, including advanced NDT that needs procedure qualification before the outage.

During the outage

  • Internal and external visual inspection of vessels, columns, reactors and drums.
  • Heat-exchanger tube inspection by ECT, RFT, NFT and IRIS, with bundle maps and plugging recommendations.
  • Fired-heater tube inspection to API 573: thickness, diameter growth and creep-related checks.
  • Weld and crack inspection by PAUT, TOFD, MT and PT on items identified in the plan.
  • Repair and alteration inspection to ASME PCC-2, NBIC and the applicable API inspection code.
  • Daily progress and findings reports so emergent work is raised while there is still time to act.

After start-up

A post-turnaround inspection report for each item, updated thickness and condition data for the inspection database and RBI model, closed and open recommendations, and the next inspection dates calculated from the new data.

Governing codes and standards

  • API 510, API 570, API 653
  • API 572 and API 573 (vessel, exchanger and heater inspection practices)
  • API 579-1/ASME FFS-1
  • ASME PCC-2 and NBIC (repairs)
  • API RP 580/581 (RBI scope)

What you receive

  • Turnaround inspection scope and work packs
  • Daily findings and progress reports
  • Item inspection reports
  • Updated thickness data and inspection dates
  • Post-turnaround summary report

Industries served

  • Refining and petrochemical
  • Fertiliser and chemicals
  • Gas processing and LNG
  • Power generation
  • Steel and metals

Frequently asked questions

How early should turnaround inspection planning start?

As early as the turnaround scope is frozen, typically many months ahead, so that advanced NDT procedures can be qualified, access and cleaning planned, and contingency repairs prepared before the outage starts.

Talk to an inspection engineer

Send the equipment list or drawings, the inspection you need and your timing. Quotes are prepared for each scope and region.

Request a Quote

Request an inspection quote (RFQ)

Tell us the asset, the method, where it is, the governing code, your dates, the size of the job and the report you need. We reply with questions or a quote. Affordable, accessible, fully customizable — no published pricing.












Or email the same details to info@atlantisndt.com. Mobilisation: North America; confirm your location in your RFQ.

Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.