Affordable NDT ERP in Guyana — Fully Customizable, All Business Apps Included

Atlantis NDT ERP — affordable, accessible, fully customizable. All integrated business apps included out-of-the-box. Built for Guyana inspection companies: ASNT NDT + ISO 9712 + API ICP + AWS CWI + NACE CIP dual-scheme certification tracking, work orders + dispatch, calibration management with NIST/NPL traceability, invoicing + multi-currency accounting, CRM + sales pipeline, payroll + HR, document control per ISO 9001 + 17020 + 17025, mobile + offline field capture, audit-ready records.

Modules + Features for Guyana Inspection Companies

pre-configured modules: inspector cert tracking (ASNT + ISO 9712 + API ICP + AWS CWI + NACE CIP + CSWIP + PCN + ASNT 9712 (formerly ACCP) + NAS 410 + EN 4179 aerospace + JSNDI/KSNT/AINDT/ABENDI/ISNT regional schemes), equipment + calibration cert tracking (NIST + UKAS + NPL + PTB + BAM traceability), work-order management + dispatch, field-service mobile + offline app, customer + supplier management, inspection report generation (per ASME V + API 510/570/653 + IACS Marine + custom-client formats), document control + procedure library + Level III sign-off workflow, audit-trail recording, multi-currency invoicing + accounting, payroll + HR + time-sheet + project management + fleet management + CRM + e-commerce B2B portal.

Code + Compliance Framework

Audit-defensible records per ISO 9001:2015 + ISO 17020 (inspection body) + ISO 17025 (calibration laboratory) + ISO 17024 (personnel cert body). Every inspection, procedure revision, inspector cert and calibration cert is timestamped with reviewer approval recorded. ASME B&PV V + VIII + IX + XI; ASME B31.1/3/4/8/12 piping; API 510 + 570 + 571 + 653 + 936 + 1169; NACE MR0175 + MR0103 sour-service; ASTM E-series; ISO 17635/17636/17640; EN 13445/13480; IACS Rec-20 marine. Dual-scheme cert (ASNT + ISO 9712) for global mobility.

Integrations

Atlantis ERP has an open REST API, so it connects to SAP, Maximo, NetSuite or any other system that accepts API connections; each integration is scoped with you during implementation. Cloud SaaS + multi-tenant or single-tenant on-prem options for highly regulated customers (defense, nuclear).

Free Consultation + Tailored Quote in Guyana

Atlantis NDT publishes no pricing — pricing varies by region, team size, module scope, integration depth. Request your free 30-minute consultation with Atlantis NDT founder Anoop Rayavarapu (ASNT NDT Level III in UT, RT, MT, PT and VT). Output: tailored scoping + module map + integration scope + implementation timeline + tailored quote. Affordable, accessible, fully customizable. See also Atlantis NDT ERP hub, ASNT Level III consulting, ISO 9001 and ISO 14001 quality system.

Guyana's industrial base is barely a decade old and almost entirely offshore. An NDT ERP serving this market has to carry the evidence those operators audit against — ABS class rules and IACS survey regimes for FPSO hull, topsides and moorings, API 510, API 570 and API 653, ASME BPVC Section VIII and Section V, Guyana EPA environmental permit conditions under the Environmental Protection Act — with technician.

Four FPSOs work the Stabroek Block, Liza Destiny at about 130,000 bpd, Liza Unity and Prosperity at roughly 265,000 bpd each and One Guyana on Yellowtail at about 260,000 bpd, together producing around 900,000 bpd in Q2 2026. The fifth vessel, Errea Wittu, arrived on 21 August 2026 for Uaru start-up in Q4. Onshore work is shore-base and pipeline: the US$300 million Vreed-en-Hoop SURF base opened in January 2025, and the 300 MW Wales gas-to-energy plant with its NGL facility and roughly 250 km pipeline is chasing first power at end-2026. Beyond oil, only Bosai's Linden bauxite plant and the Aurora gold mine carry real fixed-plant inspection. Operators including ExxonMobil Guyana (Stabroek Block operator), SBM Offshore (FPSO owner-operator), Vreed-en-Hoop Shore Base Inc (NRG Holdings / Jan De Nul) set the pre-qualification bar their contractors inherit. The system of record for that evidence is the ERP, not a spreadsheet a technician maintains between jobs.

Source: Per-city industrial and compliance research file; ASNT SNT-TC-1A employer certification framework

NDT ERP in Guyana — what the system has to evidence
FactorWhat appliesWhy it matters
Sectors servedDeepwater oil production (FPSOs), Subsea infrastructure and shore-base logistics, Gas-to-power and NGL processing, Bauxite and gold mining, Rum distilling and sugarSets which methods, report formats and codes the system must handle
Codes audited againstABS class rules and IACS survey regimes for FPSO hull, topsides and moorings, API 510, API 570 and API 653, ASME BPVC Section VIII and Section V, Guyana EPA environmental permit conditions under the Environmental Protection Act, Petroleum Activities Act 2023 and MARAD annual FPSO safety inspection, Local Content Act 2021 requirements for Guyanese-registered service providersEach demands retrievable evidence, not a claim of compliance
What must be retrievable on demandTechnician certification currency · equipment calibration status · the report against the asset that generated itThese three are what an auditor asks for first
DeploymentCloud or on-premise · configured to the codes above · offline field captureField crews lose connectivity; the record cannot depend on it

What must an NDT ERP track for inspection firms in Guyana?

Evidence against ABS class rules and IACS survey regimes for FPSO hull, topsides and moorings, API 510, API 570 and API 653, ASME BPVC Section VIII and Section V, Guyana EPA environmental permit conditions under the Environmental Protection Act, Petroleum Activities Act 2023 and MARAD annual FPSO safety inspection. That means each technician's certification currency by method and level, each instrument's calibration status on the day it was used, and every inspection report bound to the asset and the job that produced it. An auditor asks for those three before anything else.

Can an inspection company in Guyana run this alongside its existing accounting?

Yes. The ERP owns operations — jobs, technicians, equipment, reports — and pushes finished invoices to the accounting system, which keeps the chart of accounts, tax and reconciliation. For US firms that usually means QuickBooks; the split is documented in the QuickBooks integration guide rather than forcing a migration nobody asked for.

Does it work offline for field crews in Guyana?

Yes. Field capture runs offline and syncs when the device reconnects, because turnaround decks, tank interiors and remote sites have no usable signal and a record that depends on connectivity is a record that gets rewritten from memory hours later. Offline capture is the difference between a contemporaneous record and a reconstruction.

How long does implementation take for a firm in Guyana?

The configuration follows the codes and workflows above rather than a fixed template, so the timeline is set by how much existing data has to be migrated and cleaned — certification records and calibration history are the two that consume the time. Firms usually run the first job cycle in parallel before cutting over.

What happens to inspection records if a technician leaves?

They stay with the asset and the job, which is the point. Employer-based certification ends when the holder leaves, but the reports they signed remain part of the asset's inspection history and are still auditable. A system that stores records per technician rather than per asset loses that history on every departure.

Related: the NDT ERP overview, personnel certification tracking, equipment calibration tracking, QuickBooks integration and the RFP requirements checklist. Firms preparing for an audit should also read the NDT programme gap assessment.