Maritime inspection · China

Ship Thickness Measurement and Hull Gauging in Shanghai

Shanghai handles more container traffic than any other port, and its berths at Yangshan and Waigaoqiao see the newest scrubber-fitted tonnage alongside hard-worked feeders, while bulk carriers wait in the Yangtze estuary and ships go into the repair yards upriver. When the only free hours before a survey fall during a Yangshan call, an estuary wait or a docking upriver, that is where the measurements have to be taken. Our technicians travel from India for each job, and the plan is built around the ship's berth schedule rather than ours.

Scoped for short container calls

Yangshan and Waigaoqiao berth windows are tight. We fix the list of decks, coamings, piping runs and any tanks that can be certified safe before arrival, so the gauging fits the cargo plan rather than fighting it.

Estuary anchorage as a gauging window

Bulk carriers and tankers waiting in the Yangtze estuary for a berth or river passage can open holds and ballast tanks without losing cargo time — a practical slot for pre-purchase or pre-docking readings.

Data that follows the ship upriver

Readings taken at a Shanghai berth or anchorage are laid out on the class TM report formats, so the yard on the lower Yangtze and the attending surveyor can build on them at the docking.

Inspection services for ships at Shanghai

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

Shanghai: the container giant at the mouth of the Yangtze

Shanghai is the world's busiest container port, and most of that volume moves through two places: the deep-water terminals at Yangshan, built on islands offshore and linked to the mainland by the Donghai Bridge, and the Waigaoqiao terminals on the south bank of the Yangtze estuary. Mainline services to Europe, the Mediterranean and North America call here alongside a dense network of intra-Asia feeders and Yangtze river shuttles. The result is a port where the largest scrubber-fitted container ships and small, heavily worked feeders lie only a few berths apart, with very different inspection needs.

Container berth stays are short and tightly scheduled, so gauging on a Shanghai call has to be scoped before the ship arrives: which deck, hatch coaming and side-shell areas are reachable with cargo on board, which ballast tanks can be ventilated and certified safe during the stay, and which piping runs can be reached without interfering with cargo operations. Longer windows come from elsewhere in the port system. Bulk carriers and ore carriers often wait at the anchorages in the Yangtze estuary for a berth or for passage upstream, tankers serve the oil and petrochemical terminals around the estuary, and ships heading for repair at yards on the lower Yangtze can be gauged before the steel list is fixed.

What sets Shanghai apart is how much of the decision-making sits in the city itself. Shanghai is a centre for Chinese shipowning, ship leasing and shipping services, so many survey, drydock and sale-and-purchase decisions are taken here even when the ship is somewhere else. Owners buying second-hand tonnage, charterers taking ships on period, lessors receiving a ship back and superintendents preparing for a third or fourth renewal survey all need condition data they can rely on, and a ship calling at Shanghai is often the most convenient place to collect it.

Where hull gauging in Shanghai takes place

Most ultrasonic thickness gauging in Shanghai falls into three settings. At the container terminals the work is limited to what can be reached during cargo operations, so it suits weather deck structure, hatch coamings, accommodation and machinery-space piping, and scrubber overboard lines. At anchorage in the estuary, a bulk carrier or tanker in ballast can open tanks and holds, and the team works from a launch arranged by the ship's agent. At a repair yard the whole ship is available, staging and lighting are in place, and gauging can run alongside the class surveyor's close-up survey.

Shanghai's own big shipyards — Jiangnan on Changxing Island, Hudong-Zhonghua and Shanghai Waigaoqiao Shipbuilding — concentrate on newbuilding, so ships trading to Shanghai often dock for repairs elsewhere, further up the Yangtze or in the Zhoushan archipelago to the south. We plan the mobilisation around wherever the ship is actually going to sit still, and keep the measurement plan consistent from pre-docking gauging to the final survey report. Where the next docking is elsewhere in China, the Shanghai readings are handed over with their locations marked on the ship's drawings, so the next yard and surveyor can use them directly.

  • Yangshan Deep-Water Port — mainline container ships during their working time alongside; weather deck, hatch coamings and scrubber overboard lines, reached without disturbing the crane plan.
  • Waigaoqiao container terminals — gauging on feeders and intra-Asia container ships, where ballast tanks can sometimes be opened during a longer stay.
  • Yangtze estuary anchorages — bulk carriers, ore carriers and tankers waiting for berths or river passage; hold and tank gauging by launch through the ship's agent.
  • Oil and petrochemical terminals around the estuary — product and chemical tankers alongside; deck, external shell and piping readings, with tank entry only once gas-free certification allows.
  • Repair yards on the lower Yangtze — renewal survey gauging, pre-docking steel estimates and re-gauging of renewed plating during drydock periods.
  • Wusongkou cruise terminal — piping and structural gauging on cruise ships during turnaround calls, scoped around passenger operations and the ship's own maintenance plan.

Thickness measurement through the survey cycle at Shanghai

Every renewal survey asks for more thickness measurement than the last, and for oil tankers, chemical tankers and bulk carriers the ESP Code adds close-up survey on top. The table is the usual shape of the work; the class rules and the surveyor set the exact extent, which is why the measurement plan for a job at Shanghai is agreed in writing before mobilisation.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Port state control, emission rules and the Shanghai market

Shanghai falls under the Tokyo MoU, with port state control carried out by the China Maritime Safety Administration. Inspectors look at structural condition, corrosion in accessible spaces and the state of the fire main and other safety-critical piping, so a superintendent with a doubtful deck area or a wasted fire main is better served gauging and repairing before arrival than explaining it at the gangway. China also applies its own domestic emission control rules in coastal and inland waters, including limits on open-loop scrubber wash-water discharge in some areas, and ships trading between Shanghai and the Yangtze river ports have to plan scrubber operation around them.

That matters for inspection because scrubber wash-water and overboard piping sees heavy, uneven service: long periods in open-loop mode at sea, then closed-loop or idle spells near the coast. Erosion and corrosion in those lines, and at the overboard penetrations in the shell, are a known source of leaks. Shanghai is also a centre of Chinese ship leasing, and a lessor taking a ship back at the end of a bareboat charter needs a condition record as much as an owner buying second-hand. An independent, well-documented thickness survey serves both.

Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Shanghai meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.

Typical thickness gauging jobs in Shanghai

Ship inspection in Shanghai is shaped by short container calls on one side and long estuary waits and yard periods on the other. The jobs below are the kinds of scope superintendents ask for, and each is planned around the ship's actual window — a berth plan, an anchorage notice or a confirmed dock date — with the team mobilised from India once that window is firm enough to apply for visas.

  • Scrubber wash-water and overboard piping on a mainline container ship at Yangshan, gauged during its scheduled time alongside, with the shell penetrations checked from inside the engine room.
  • Pre-purchase condition gauging of a Capesize or Panamax bulk carrier waiting at the Yangtze estuary anchorage, covering hold frames, hopper tanks, hatch covers and coamings for the buyer's technical team.
  • Pre-docking gauging of a feeder container ship before it moves to a lower Yangtze repair yard, so the steel renewal estimate and yard specification are ready before the dock date.
  • Fire main, ballast and sea-water piping gauging on an ageing product tanker at a Shanghai oil terminal ahead of a vetting inspection, focused on lines with a history of pinhole leaks.
  • Off-hire condition gauging of a ship redelivered in Shanghai at the end of a bareboat charter, giving owner and lessor a shared record of hull and tank condition.

How a thickness measurement job runs at Shanghai

Most of the work on a Shanghai job happens before the team boards: scope, plan and access are settled first, so the time on board goes on measurement.

Most teams land at Shanghai Pudong International Airport; Hongqiao is useful for domestic connections to the upriver yards. Yangshan is reached by road over the Donghai Bridge, and terminal access is through port passes arranged by the ship's agent; anchorage boarding depends on a launch the agent times to the ship's position in the estuary. Technicians travel on Chinese business visas, and the application normally needs an invitation letter from a company in China, so we start the paperwork as soon as the berth, anchorage window or dock date is confirmed rather than waiting for the final ETA.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

The inspection team is mobilised from India for each job; nobody is stationed at the port, so mobilisation is planned against the vessel's schedule and visa lead times. Our founder and Responsible NDT Level III, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has over eleven years of international field experience, plans and supervises the work. Technicians are certified under the company's written practice to ASNT SNT-TC-1A, and the company holds ISO 9001 and ISO 14001 certification.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Container ships
  • Feeder container ships
  • Bulk carriers
  • Ore carriers
  • Product and chemical tankers
  • Cruise ships

Frequently asked questions

Can thickness gauging at Yangshan be done during a normal container call?

Yes, within limits. A container ship alongside at Yangshan is working cargo the whole time, so gauging concentrates on what is accessible and safe: weather deck, hatch coamings, accommodation and machinery spaces, and scrubber and sea-water piping. Ballast tanks can be included only if the ship can ventilate and certify them during the stay. We agree that list with the master and superintendent before arrival so nothing depends on improvisation alongside.

Is it better to gauge at anchorage in the Yangtze estuary or at the yard?

It depends on the purpose. For a pre-purchase inspection in Shanghai or a pre-docking steel estimate, a ship in ballast at anchorage gives good access to holds and tanks without using dock time. For renewal-survey gauging that the class surveyor will verify, the yard is usually better, because staging, lighting and cleaning are already in place and the close-up survey happens at the same time.

Do China's domestic emission rules affect scrubber piping inspection in Shanghai?

Indirectly. Where Chinese rules restrict open-loop discharge, ships run closed-loop, switch to compliant fuel or shut the scrubber down, and that idle time is a practical window to gauge wash-water and overboard lines. We take the ship's scrubber operating pattern into account when choosing measurement points, because erosion and corrosion concentrate where flow direction, velocity and water chemistry change.

How far ahead should we contact you for a Shanghai job?

The moment the window is known. The team travels from India, and a Chinese business visa needs an invitation letter and processing time, so a dock date or charter redelivery confirmed some weeks ahead is comfortable. Short-notice berth calls are harder; for those we discuss with the superintendent whether the gauging can move to the next suitable call or to the next yard stay.

Does thickness measurement at Shanghai need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.