Maritime inspection · China

Ultrasonic Thickness Gauging for Ships in Xiamen

Xiamen is the main container port of Fujian province, on the western side of the Taiwan Strait. Its terminals around Xiamen Bay serve intra-Asia, Southeast Asian and long-haul container services, alongside bulk carriers, ro-ro ships and cruise calls. Short-sea ships calling here wear hard and stay briefly, so gauging is often spread over several calls, an anchorage wait or a docking further along the Fujian coast. The team comes from India for each job, and its timing allows for typhoons and the winter monsoon.

Ballast tank gauging split across calls

Feeders on tight rotations rarely open every tank in one stay. Dividing the tanks into groups that fit each Xiamen call, and combining the readings afterwards, completes the scope before the survey without extra off-hire.

Short-sea corrosion targeted

Frequent ballast changes, cargo handling at every port and a warm, humid climate keep corrosion active in ballast tanks, hold structure and deck fittings. Measurement points are placed where that wear concentrates.

Planned around two weather seasons

Typhoons in summer and autumn and the strong north-east monsoon through the strait in winter can both interrupt launch work. Anchorage jobs at those times are planned with slack and with the critical tanks listed first.

Inspection services for ships at Xiamen

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

Xiamen: Fujian's container port on the Taiwan Strait

Xiamen's harbour is a sheltered bay around Xiamen Island, with container terminals spread around the bay, including the Haicang area on the mainland shore, and a cruise terminal on the island itself. It is the province's principal container gateway. Container lines link Xiamen with the rest of the China coast, Southeast Asia and long-haul markets, and the port also handles bulk cargo, project cargo and vehicles. Shipping across the strait connects the city with Taiwan, and coastal services run north and south along the Fujian shore.

The ships are a mix typical of a large regional port: feeders and intra-Asia container ships on busy rotations, mid-sized bulk carriers bringing coal and other raw materials to the Fujian coast, ro-ro ships and car carriers, and coastal cargo ships. Warm, humid conditions and short-sea rotations with frequent ballasting keep corrosion active in ballast tanks, void spaces and deck piping, and these ships see more cargo handling per year than a deep-sea bulk carrier ever does. A Xiamen call is often short, but anchorage waits in the bay and its approaches give longer windows for gauging ships in ballast.

Shipbuilding and repair are part of the bay too. Xiamen Shipbuilding Industry is known in particular for car carriers, and repair facilities around the bay and along the Fujian coast take ships for docking. For owners of feeder and short-sea fleets that trade constantly along the China coast, Xiamen can be a convenient place to dock, with pre-docking gauging done during a preceding Xiamen call; the readings are most useful when the next dock is only a short coastal passage away and there is no time to measure at sea. The weather sets its own calendar: typhoons in summer and autumn, and strong north-east monsoon winds through the Taiwan Strait in winter, can interrupt anchorage and launch work and need to be allowed for in any schedule.

Berths, anchorages and yards around Xiamen Bay

Xiamen work is done alongside or at anchor far more often than in dock. The container terminals at Haicang give access to deck structure, coamings and piping on container ships, and to ballast tanks when the ship's stay and ballast plan allow. Bulk berths around the bay allow hold gauging after discharge, while ro-ro ships release their vehicle decks as cargo moves. At anchorage, ships waiting in ballast can open holds and tanks for pre-purchase, on-hire or pre-docking gauging, with the team boarding by launch arranged through the agent. Inside the bay the water is sheltered, so outside the monsoon and typhoon periods launch transfers to ships at anchor are usually straightforward.

Docking work takes place in the repair yards around Xiamen and elsewhere on the Fujian coast. For short-sea and feeder owners, the value of a Xiamen gauging often lies in the sequence: readings taken at berth or anchorage define the steel renewal scope, the yard prepares accordingly, and the survey gauging in dock then confirms and completes the picture. Ships that trade between Xiamen and the Pearl River Delta can equally carry the Xiamen readings to a yard further south.

  • Haicang container terminals — container berths on the mainland side of the bay; deck, coaming and scrubber discharge lines, plus ballast tanks when the stay and ballast plan allow.
  • Bulk and general cargo berths around the bay — coal and raw-material carriers of handy and Supramax size; hold plating, hopper slopes and hatch covers once discharge ends.
  • Xiamen Bay anchorages — sheltered water for launch boarding outside the typhoon and monsoon periods; ships in ballast measured ahead of a sale, a charter or a yard visit.
  • Ro-ro berths — car deck, ramp and stern door gauging on ro-ro ships and car carriers as decks become free during cargo work.
  • Fujian coast repair yards — dockings for short-sea and feeder owners, with renewal survey gauging and re-measurement of steel the yard has replaced.

Thickness measurement through the survey cycle at Xiamen

Every renewal survey asks for more thickness measurement than the last, and for oil tankers, chemical tankers and bulk carriers the ESP Code adds close-up survey on top. The table is the usual shape of the work; the class rules and the surveyor set the exact extent, which is why the measurement plan for a job at Xiamen is agreed in writing before mobilisation.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Coastal rules and short-sea trading in Fujian

Foreign ships at Xiamen are inspected under the Tokyo MoU by China's Maritime Safety Administration, and the Fujian coast is inside China's domestic emission control arrangements, which also limit where open-loop scrubbers may discharge. Smaller feeder and short-sea ships seldom carry scrubbers at all, so their inspection needs centre on hull structure, tanks and piping rather than exhaust-cleaning systems; the larger container ships calling at Haicang are where scrubber piping becomes part of the scope.

Short-sea trading is hard on ships in ways that reward regular gauging. Frequent port calls and ballast changes, cargo handling at every stop and a warm, humid climate all speed up corrosion in ballast tanks, hold structure and deck fittings. Ships in the trade between Fujian, the rest of the China coast and Southeast Asia also face scrutiny from charterers and port state inspectors, who look closely at hatch covers, ballast tank coatings and fire main condition. Feeder ship thickness measurement between surveys lets the owner plan steel and piping renewal into the next docking instead of reacting to a deficiency raised at the gangway.

Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Xiamen meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.

Typical thickness gauging jobs in Xiamen

Ship inspection in Xiamen is usually built around a short-sea or feeder ship's regular call, an anchorage wait, or a docking on the Fujian coast. We fix the scope with the superintendent beforehand, mobilise the team from India for the confirmed window, and keep a margin in the plan during the typhoon and winter monsoon seasons. Earlier TM reports, where the owner has them, are used to place the measurement points.

  • Ballast tank gauging on a feeder container ship split across two Xiamen calls, so the full tank scope is complete before its intermediate survey.
  • After discharge at a Xiamen bulk berth, a Supramax's holds and hatch covers measured and its hatch corners crack-tested, ahead of a charterer's hold inspection.
  • A short-sea ship anchored off Xiamen before heading to a Fujian yard: ballast tanks and holds measured so the steel list for its renewal survey is ready on arrival.
  • A ro-ro ship's car decks, ramps and stern door measured during its Xiamen call, with each deck released by the chief officer as the vehicles move off.
  • Delivery into a time charter at Xiamen: a bulk carrier's holds and tanks measured so that owner and charterer start the charter with a shared condition record.

How a thickness measurement job runs at Xiamen

The sequence for a thickness measurement job at Xiamen is short and written down, so the yard, the surveyor and the superintendent know who arranges what.

Arrival is at Xiamen Gaoqi International Airport — or the new Xiang'an airport once it takes over from Gaoqi — normally via a Chinese or Southeast Asian hub. The ship's agent obtains passes for Haicang and the other port areas and books the launch for any anchorage boarding, weather permitting. For an India-based team, the Chinese business visa and its supporting invitation letter are the step that needs most notice, so applications are made as soon as the berth, anchorage window or dock date is fixed.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

We send the team from India to the ship for each job rather than keeping staff at the port, and plan the mobilisation around visas and the vessel's itinerary. The work is planned and supervised by the founder, our Responsible NDT Level III (ASNT NDT Level III in UT, RT, MT, PT and VT, with more than eleven years of international field experience). Technicians hold certification under the company's written practice to ASNT SNT-TC-1A; Atlantis is ISO 9001 and ISO 14001 certified.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Container ships
  • Feeder container ships
  • Bulk carriers
  • Ro-ro ships and car carriers
  • Coastal cargo ships
  • Cruise ships

Frequently asked questions

Can ballast tank gauging on a feeder be split over several Xiamen calls?

Yes, and on tight rotations it is often the only practical way. We divide the tanks into groups that can each be ventilated, entered and gauged within one call, record exactly what has been covered, and complete the rest at following calls. The readings are then combined into one report on the TM formats ahead of the survey.

Does the winter monsoon in the Taiwan Strait affect anchorage work?

It can. Strong north-easterly winds through the strait in winter, like typhoons in summer and autumn, make launch transfers difficult and sometimes stop them. Berth and yard work is less affected. When a Xiamen job falls in either season, we agree priorities with the superintendent so the most important spaces are gauged first.

Where does corrosion concentrate on short-sea ships trading from Xiamen?

Ballast tanks are the first concern, particularly where coating has broken down on the upper side shell and bulkheads, and at stiffener edges and welds. Hold frames and hatch coamings suffer from cargo handling at frequent calls, and deck piping and air pipe heads waste in the humid, salty air. We place measurement points to capture those areas as well as the minimum the survey requires.

Can gauging done in Xiamen be used when the ship docks elsewhere?

Yes. Hull gauging in Xiamen, whether at a berth or at anchorage, is recorded against the ship's structural drawings and the TM report layout, so the yard and the class surveyor at the docking port can use them for planning. Where the docking is in a Fujian or Pearl River Delta yard, the same team can follow the ship and complete the survey gauging in dock.

Does thickness measurement at Xiamen need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.