Maritime inspection · China
Thickness Measurement at the Zhoushan Ship-Repair Yards
The Zhoushan archipelago, off the Zhejiang coast, is one of the busiest ship-repair centres in the world, with docks able to take VLCCs, large ore carriers and big container ships. Superintendents book dockings here for renewal surveys, steel renewal and retrofit work, and need gauging that keeps pace with the yard programme. Our technicians come from India for the length of the dock period and work alongside the class surveyor and the yard's steel department until the survey items are closed.
Gauging paced to the yard
A Zhoushan dock period is planned around steel. Readings issued space by space, with substantial and excessive wastage flagged the same day, let the yard order and cut plate while tanks are still open and staged.
Pre-docking data before arrival
Gauging on a preceding voyage, at a discharge port or at the Zhoushan anchorages gives the yard a steel renewal estimate before the ship enters dock, so the specification reflects measured condition.
Retrofit systems coming due
Many scrubbers and ballast water treatment systems were installed in these yards. Their wash-water, overboard and sea-water piping and shell penetrations are now reaching the age where gauging and crack detection matter.
Inspection services for ships at Zhoushan
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreZhoushan: an island ship-repair cluster for the largest ships
Zhoushan is an archipelago of many islands at the mouth of Hangzhou Bay, joined to Ningbo on the mainland by a chain of road bridges. Its repair yards are spread across several of the islands, and between them they offer graving docks and floating docks sized for the largest tankers, ore carriers and container ships trading to China. COSCO Shipping Heavy Industry runs one of the major repair yards here and has been adding dock capacity, and a number of private repair yards work alongside the state-owned groups, which gives owners a wider choice of dock dates than a single-yard port can offer.
Ships come to Zhoushan for the work that needs a dock: renewal (special) surveys with their close-up survey and gauging, intermediate docking surveys, hull blasting and coating, propeller and rudder work, and steel renewal. The yards were also among the main retrofit centres when scrubbers and ballast water treatment systems were fitted across the global fleet, and much of that equipment, with its piping and shell penetrations, is now coming round for its own inspection and repair. Tankers and bulk carriers at their third or later renewal survey bring the heaviest gauging scope — extensive measurement of cargo and ballast tank structure under the enhanced survey programme.
What makes gauging distinctive here is pace. A large repair yard runs many ships at once, and a ship's dock period is planned around steel: the sooner the extent of renewal is known, the sooner plates can be ordered, cut and fitted. Gauging that arrives late, or in a form the class surveyor cannot use, holds up the whole programme. The useful work starts before the ship arrives, with pre-docking gauging and a clear measurement plan, and continues in dock with the readings delivered space by space as tanks are cleaned, ventilated and staged.
Gauging inside the Zhoushan repair yards
Hull gauging in Zhoushan happens almost entirely inside a yard, either in dock or at the yard's repair quays. In dock, the team gauges bottom and side shell, cargo and ballast tanks, and holds as they are made available; at the quay, work continues on deck structure, piping and tanks once the ship has floated out. The yard controls access, hot work and staging, so every day starts with the yard's own permit and safety routine, and the gauging sequence follows the yard's cleaning and staging plan rather than our own preference.
Coordination between three parties decides how well a docking goes: the owner's superintendent, who sets the scope; the class surveyor, who decides where readings are needed and verifies them; and the yard, which renews the steel. We issue readings on the class TM report formats with substantial and excessive wastage marked, so the yard can raise steel renewal quantities and the surveyor can confirm the extent before plates are cut. The gauging programme is shared with whoever runs the blasting and coating schedule as well, because blasting, coating and gauging compete for the same tank access and staging, and their order has to be agreed tank by tank.
- COSCO Shipping Heavy Industry (Zhoushan) — renewal survey gauging, steel renewal estimates and re-gauging of renewed areas on large tankers, bulk carriers and container ships in dock.
- Private repair yards across the archipelago — docking-survey gauging and piping inspection for owners booking mid-sized tankers, bulk carriers and container ships.
- Repair quays and lay-by berths — completion of deck, piping and tank gauging after undocking while the ship finishes its yard programme afloat.
- Scrubber and ballast water treatment installations — wash-water, overboard and sea-water piping gauging, with crack detection at shell penetrations and pipe supports.
- Zhoushan anchorages — pre-docking gauging of ballast tanks and holds while the ship waits for its dock to become free.
Thickness measurement through the survey cycle at Zhoushan
Every renewal survey asks for more thickness measurement than the last, and for oil tankers, chemical tankers and bulk carriers the ESP Code adds close-up survey on top. The table is the usual shape of the work; the class rules and the surveyor set the exact extent, which is why the measurement plan for a job at Zhoushan is agreed in writing before mobilisation.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Survey, emission and market context for Zhoushan dockings
Ships docking in Zhoushan sit under the Tokyo MoU port state control regime while in Chinese waters, but the stronger regulatory driver here is class. The yard period is where the renewal survey requirements of IACS UR Z7, and for ESP ships the requirements of UR Z10.1 to Z10.5 and the 2011 ESP Code, have to be met. For oil tankers, chemical tankers and bulk carriers at the third renewal survey and beyond, the gauging covers transverse sections, cargo and ballast tank structure and suspect areas, and it must be complete and reviewed before the surveyor can close the survey.
Commercially, Zhoushan competes on dock capacity for the largest ships, and international owners send tankers and bulk carriers here alongside the Chinese fleets. Charterers' vetting and oil-major requirements push older tankers toward CAP, which needs a thorough gauging record, and an owner can plan a CAP survey and a renewal survey into the same dock period. Scrubber-fitted ships also bring China's domestic emission rules into the yard discussion: open-loop discharge is restricted in some Chinese waters, and repairs to wash-water systems are often scheduled into the docking.
Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Zhoushan meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.
Typical thickness gauging jobs in Zhoushan yards
Zhoushan work runs to the yard's timetable. The scope is agreed with the superintendent and checked against the class requirements before mobilisation; the team arrives for the docking date, works through the spaces as the yard opens them, and stays until the class surveyor has the readings needed to close the survey items. Planning starts well ahead because the team needs Chinese visas.
- Third renewal survey gauging on a VLCC in dock, covering transverse sections, cargo and ballast tank structure and suspect areas, with substantial corrosion flagged daily to the yard.
- Combined CAP and renewal survey gauging on an ageing Suezmax, planned so the CAP measurement record and the class TM report come from one consistent set of readings.
- Pre-docking gauging of a Capesize bulk carrier's holds and ballast tanks at anchorage while it waits for its dock, giving the yard an early steel renewal estimate.
- Re-gauging of renewed and doubled areas after steel work, so the final TM report reflects the as-repaired condition before the ship undocks.
- Scrubber wash-water and overboard piping gauging, with magnetic particle crack detection at shell penetrations and pipe supports, on a container ship docked for its intermediate survey.
How a thickness measurement job runs at Zhoushan
A gauging job at Zhoushan runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.
Access to the archipelago is through Ningbo Lishe International Airport or Shanghai Pudong, then by road over the bridges that link the islands to the mainland; Zhoushan Putuoshan Airport handles domestic flights. Yard access is controlled by the yard itself, with gate passes, safety induction and work permits arranged through the owner's site team or the ship's agent. Technicians travel from India on Chinese business visas, and the invitation letter the visa application needs is easiest to obtain once the docking contract is signed — so tell us the dock date as soon as it is fixed.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Crude oil tankers (VLCCs and Suezmaxes)
- Ore carriers
- Bulk carriers
- Container ships
- Product and chemical tankers
- Gas carriers
Frequently asked questions
Is there value in measuring before the ship arrives at the Zhoushan yard?
Yes, and it helps the dock programme. Pre-docking gauging during a previous port call, or while the ship waits at anchorage, gives the yard an estimate of steel renewal before the ship docks, so plate can be ordered and the work planned. The readings are then confirmed or extended in dock, alongside the class surveyor's close-up survey.
How do you work with the yard and the class surveyor during the docking?
The superintendent sets the scope, the class surveyor indicates the areas and sections to be measured, and the yard provides cleaning, ventilation, lighting and staging. We gauge in the sequence the yard opens spaces, issue readings daily with substantial and excessive wastage marked, and attend the surveyor's review so questions about locations or values are resolved on the spot.
Is it worth combining CAP gauging with the renewal survey in Zhoushan?
For a tanker heading toward its fourth renewal survey, or one charterers are already asking about, it usually is. The tank access, cleaning and staging needed for renewal survey gauging are the same conditions CAP measurement needs. Planning both scopes together avoids opening, cleaning and staging the same tanks twice, and gives the owner one consistent set of readings.
What happens if gauging finds more wastage than the yard planned for?
We flag it as soon as the readings are taken, not at the end of the docking. The superintendent and yard can then decide on additional renewal while the tank is still open and staged, and the class surveyor sees the extent of the problem directly. Late surprises are what extend dock periods; early, complete readings let the owner make the decision with time to act.
Does thickness measurement at Zhoushan need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.