Maritime inspection · Greece
Rhodes: Thickness Gauging for Dodecanese Ferries and Island Shipping
Rhodes is the hub of the Dodecanese, a few hours from the Turkish coast, with ferries, cruise ships, island supply vessels and fuel tankers using its harbours. Many of the ships that call have fixed timetables and short layovers. A team travels from India to the vessel, and gauging is fitted to the port call or to the winter break when island services slow down.
Dodecanese ferry timetables
Island ferries and fast craft run to published schedules, so layovers are short and predictable. We agree a priority list of spaces with the superintendent and work to the timetable rather than against it.
Winter break for deeper readings
Passenger traffic falls sharply after the summer, and ships that were in daily service become available for tank, void and vehicle deck gauging that cannot be fitted into a season of daily sailings.
Turkish coast within reach
Rhodes lies close to Marmaris and Fethiye, and ships often move between the two sides. Where visas and dates allow, one mobilisation can be planned around calls in both countries.
Inspection services for ships at Rhodes
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreRhodes: gateway to the Dodecanese
Rhodes is the largest of the Dodecanese islands, lying off the south-west coast of Turkey at the eastern edge of the Aegean. The island's main harbour, Mandraki, is small and best known for yachts and excursion boats, while the commercial port next to it takes ferries, cruise ships and cargo. Rhodes Port Authority and the Hellenic Coast Guard administer the harbours, and a second, smaller harbour at Kolona and other facilities around the island serve fishing and local craft. The geography makes Rhodes a transport node for the whole chain, with services radiating to Kos, Kalymnos, Symi, Karpathos and beyond.
The ships that call are varied. Conventional ferries and fast craft link the Dodecanese with Piraeus and with each other, cruise ships call through the season and often anchor off the harbour in calm weather, and general cargo ships deliver building materials, supplies and consumer goods for the island and its neighbours. Fuel arrives by coastal product tanker, and some ships on the Greece-Turkey crossing use the port as an intermediate call. Much of the tonnage is coastal or short-sea, and a significant share is older: ships that have worked island routes for many years show wear on vehicle decks, ramps, weather decks and the boundaries of ballast tanks.
Rhodes is more exposed to weather than the north coast of Crete. Summer afternoon winds can complicate berthing, and winter storms from the south-west sometimes close the harbour for hours at a time. Because of that, work that needs calm water, such as anchorage gauging or launch transfers, is planned with margin. In midwinter, when services are reduced and some ships are laid up, a fuller condition programme is realistic. Island operators often schedule the biggest jobs for those months, so Rhodes sees much of its gauging between November and March.
Where ships can be gauged around Rhodes
In the commercial port, gauging is done alongside at the ferry and cargo quays. A ferry or cargo ship in port for a day offers accessible plating, vehicle decks, ramps, hatch covers and any tanks the crew has prepared. Product tankers delivering fuel are limited to deck, deck piping and ballast spaces and work within the terminal's permit rules. Cruise ships are usually on tight turnarounds, so readings concentrate on accessible deck and void spaces that the hotel operation does not block.
There is no large drydock on Rhodes. Ships needing hull steel work normally go to the Athens repair zones, to a yard in the Aegean or to Turkey, where yards at Marmaris and elsewhere along the coast serve yachts and smaller commercial ships. That means gauging on Rhodes is again a preparation step: measured readings help the technical manager set a steel estimate, compare yard offers and decide whether a repair can wait. For ships laid up in the harbour or at an anchorage during the winter, a longer programme can be planned over several days.
- Commercial port ferry quays — vehicle deck, ramp, weather deck and ballast tank readings on island ferries and fast craft
- Cargo quays — hatch cover, coaming and hold gauging on general cargo ships during discharge
- Fuel berth — deck, deck piping and ballast tank readings on product tankers within terminal rules
- Cruise berths and anchorage off the harbour — deck and void space gauging during turnaround calls
- Winter lay-up berths — extended programmes on ships idle between seasons
Thickness measurement through the survey cycle at Rhodes
Every renewal survey asks for more thickness measurement than the last, and for oil tankers, chemical tankers and bulk carriers the ESP Code adds close-up survey on top. The table is the usual shape of the work; the class rules and the surveyor set the exact extent, which is why the measurement plan for a job at Rhodes is agreed in writing before mobilisation.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Port state control and island regulation
Port state control at Rhodes falls under the Paris MoU and is carried out by the Hellenic Coast Guard, which also oversees passenger ship certification for the island services. Domestic ferries are surveyed regularly, so owners keep close watch on steel wastage in vehicle decks and ballast tanks. The Mediterranean emission control area for sulphur, in force from 1 May 2025, covers the Dodecanese. Shipping has been inside EU ETS since 2024 and FuelEU Maritime since 2025, and both apply to island voyages as well as longer routes.
Rhodes sits near Turkish waters, which adds some practical points. Ships that cross between the two countries may be managed from either side, and a gauging scope agreed in one place may need to be carried out in the other. Where that happens, we need to know which technicians will cross and what visas each needs before the dates are set. For ships calling at EU ports an Inventory of Hazardous Materials must be on board, and changes of ownership or management on the island routes sometimes prompt a condition check outside the usual survey cycle.
Since 1 May 2025 the whole Mediterranean has been a sulphur emission control area, so ships calling at Rhodes burn 0.10% sulphur fuel or run a scrubber. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service and are worth adding to the gauging scope at every docking.
Typical thickness gauging jobs at Rhodes
Rhodes jobs tend to be built around the island operator's timetable. The superintendent names the spaces and the days available, we confirm what can be made safe by the crew in time, and the readings are reported by area as each is finished so the next step can be decided while the ship is still in port.
- Vehicle deck, ramp and ballast tank gauging on a Dodecanese ferry during winter lay-up, supporting the refit steel estimate.
- Hatch cover and coaming readings on a general cargo ship delivering building materials to the island.
- Deck plating and deck piping readings on a coastal product tanker alongside the fuel berth before vetting.
- Pre-purchase condition gauging on an older ro-pax ship at the quay, with the buyer's superintendent attending.
- Scrubber overboard piping inspection on a cruise ship during a turnaround call, after a discharge flange was found weeping.
How a thickness measurement job runs at Rhodes
A gauging job at Rhodes runs the same way whatever the ship type. The sequence below is what the superintendent, the attending surveyor and the yard can expect from us.
The team flies into Rhodes International Airport Diagoras, usually through Athens, and travels by road to the harbour; the airport is a short drive from the town. Port passes, launch boarding for ships at anchor and any terminal permits are organised by the ship's agent from the crew list and equipment details we send ahead. Every technician needs a Schengen visa issued in India, because Greece applies the Schengen rules. For work that also covers a Turkish port we check that country's separate entry requirement at enquiry. Telling us the winter refit dates early helps visa planning.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
Atlantis mobilises its inspection team from India to the vessel, for each job. There is no office or agent at the port; the team travels to the ship, which is why the planning step comes first. Work is planned and supervised by our Responsible NDT Level III, the founder, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has more than eleven years of international field experience. Technicians are qualified and certified under the company's written practice to ASNT SNT-TC-1A, and Atlantis is certified to ISO 9001 and ISO 14001.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- Island ferries and fast craft
- Ro-pax ships
- Cruise ships
- Coastal product tankers
- General cargo ships
- Ro-ro and container units
- Offshore and service craft
Frequently asked questions
Can a ferry be gauged during a Rhodes layover?
To a degree. A short layover usually allows deck, ramp and accessible plating readings, but tank entry needs spaces ventilated, tested and certified in advance. For ballast tanks and voids, the winter break is a far more realistic window, and we plan that programme with the superintendent well ahead.
Is there a drydock on Rhodes for steel renewal?
No large drydock is available on the island. Ships needing hull steel work normally go to Athens-area yards, to an Aegean yard or to the Turkish coast. Gauging here is best used to prepare: measured readings let you compare yard offers and order plate before the ship leaves Rhodes.
How does the weather affect work at Rhodes?
Strong summer winds and winter storms can delay berthing and launch transfers. Alongside work in the harbour is usually less affected, but anchorage jobs need margin. We leave slack in the schedule and keep the superintendent informed whenever the master or the agent changes the plan for weather.
Can one trip cover Rhodes and a Turkish port?
Sometimes. Marmaris and Fethiye are close, but Turkey needs its own entry permission separate from the Schengen visa. If both are in the plan, tell us when scoping so we can check requirements for each technician and fit the dates for both ships.
What can be gauged on a cruise ship in port?
Accessible deck, void and some tank spaces, depending on the turnaround and the hotel operation. We agree a short priority list with the technical manager and avoid areas that guests or catering use. Longer programmes belong in refit or lay-up, when more spaces can be opened safely.
Does thickness measurement at Rhodes need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.