Maritime inspection · Greece

Souda Bay, Crete: Thickness Measurement for Ships in a Deep Natural Harbour

Souda Bay is one of the deepest natural anchorages in the Mediterranean, tucked into the north-west of Crete beside Chania. Part of it is a naval base, and the commercial port handles ferries, cruise calls, fuel and cargo. Civil ships lie in a sheltered bay with plenty of room at anchor. We mobilise a team from India to the vessel and plan readings around the ship's commercial programme and the bay's access rules.

Sheltered bay, calm working water

Souda Bay's long, deep inlet keeps most weather off ships at anchor and alongside, which makes launch transfers and tank entry planning more predictable than on the open coast of Crete.

Civil port next to a naval base

The commercial quays share the bay with military facilities. We plan civil jobs only, and all access, passes and boat movements are cleared through the ship's agent and the port authority.

Fuel and ferry traffic in one bay

Ro-pax ships on the Piraeus run, cruise calls and product tankers all use the bay, giving a mix of deck, vehicle deck, ballast tank and piping gauging in a single location.

Inspection services for ships at Souda

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

Souda: a long, deep inlet on the west of Crete

Souda Bay cuts into the north coast of Crete west of the Akrotiri peninsula, with the town of Chania a short distance to the west. The inlet is long and deep, and Souda Island at its mouth gives extra protection, so the bay offers sheltered water of a kind that is rare on the exposed Cretan coast. The commercial port at Souda is administered by the Chania Port Authority, and the military installations on the bay are controlled separately, with restrictions on movements and photography that civil visitors should respect.

Commercial traffic is a steady mix. Ro-pax ferries run overnight from Piraeus, cruise ships call during the season, and product tankers discharge fuel for the western half of the island. General cargo ships and container units deliver supplies for the region around Chania, and fishing and service craft use the smaller quays further along the shore. Many of these ships are coastal or short-sea tonnage on regular Aegean rotations, with ferries following published timetables and cargo ships fitting discharge between other ports. A ship that visits regularly gathers wear at the same predictable places: weather decks, ramps, ballast tank boundaries and piping.

Because the bay is so well sheltered, anchorage work is more practical here than at most Cretan ports. Ships waiting for a berth or for orders can lie for days without the swell that interrupts boat transfers elsewhere. That helps gauging that needs a longer quiet window, such as deck and hatch cover readings followed by tank entries, and it suits pre-docking surveys on ships that will sail on to a repair yard. The main constraint is not the weather but access: only civil areas and civil anchorage positions are available to us, and the agent decides what can be arranged.

Where gauging can be carried out at Souda

In the civil port, gauging is done alongside at the ferry and cargo quays and at the fuel berth, with every pass and permit arranged by the ship's agent. A ro-pax ferry alongside offers vehicle decks, ramps and accessible plating, while a cargo ship discharging gives access to open holds and hatch covers. Product tankers at the fuel berth are limited to deck, deck piping and ballast spaces within the terminal's rules, and work may pause during cargo transfer.

Souda does not have a large repair yard or drydock. Hull work on ships that call here is normally carried out in the Athens repair zones, in the Aegean or in yards elsewhere in the Mediterranean. Gauging at Souda therefore serves as preparation: readings taken at anchor or alongside give the technical manager a measured basis for a steel estimate, and they identify areas that need early attention. For ships laid up in the bay between charters, a fuller programme including ballast tanks and voids can be planned over several days.

  • Civil passenger and ferry quays — vehicle deck, ramp and ballast tank readings on ro-pax ships during layovers
  • Cargo quays — hatch cover, coaming, hold and deck gauging on general cargo ships and coasters during discharge
  • Fuel berth — deck, deck piping and ballast space gauging on product tankers within permit rules
  • Civil anchorage positions in the bay — pre-docking and condition gauging on ships waiting for orders, reached by launch
  • Lay-up positions in the bay — extended gauging of idle ships, planned with the owner's repair list

Thickness measurement through the survey cycle at Souda

How much steel has to be gauged depends on which survey the ship is due for, its type and its age. The pattern below is the usual one under IACS unified requirements; the attending surveyor and the class rules for the ship decide the final extent. For a ship calling at Souda, we agree the programme with the class and the owner before the team mobilises.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

Port state control and the setting of the bay

Greek port state control under the Paris MoU is carried out by the Hellenic Coast Guard, and the same authority supervises passenger ship safety on the island routes. Domestic ferries face regular certificate inspections, so owners track structural condition closely, and wastage on vehicle decks and ballast tanks is a recurring theme. The Mediterranean sulphur emission control area, in force since 1 May 2025, applies around Crete. EU ETS (since 2024) and FuelEU Maritime (since 2025) cover voyages to and from Souda.

The military presence affects planning rather than the technical work. Photography of the bay and of restricted areas is controlled, so our reports show only the vessel under inspection. The agent should confirm which berths and anchorage positions are open to civil work and whether any exercise or restriction is in force on the dates. For ships calling at EU ports, an Inventory of Hazardous Materials is required on board, and a purchase or change of manager can add a condition check to the usual survey cycle.

Since 1 May 2025 the whole Mediterranean has been a sulphur emission control area, so ships calling at Souda burn 0.10% sulphur fuel or run a scrubber. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service and are worth adding to the gauging scope at every docking.

Typical thickness gauging jobs at Souda

Most Souda jobs are short and targeted, built around the ship's call and agreed in advance with the superintendent. The brief names the spaces, the window and the decision the readings must support, and we report by area as each is completed so the superintendent can act before the ship sails.

  • Vehicle deck and ramp plating readings on a ro-pax ferry during an overnight stay, with ballast tank gauging planned for the winter lay-up.
  • Hatch cover and coaming gauging on a general cargo ship discharging at the cargo quay before a new fixture.
  • Deck plating and deck piping readings on a coastal product tanker alongside the fuel berth, ahead of a vetting inspection.
  • Pre-docking condition gauging at anchor in the bay on an older bulk carrier, giving the manager a steel estimate for a yard in mainland Greece.
  • Scrubber overboard piping inspection on a ro-pax ship after the crew found weeping near a shell connection.

How a thickness measurement job runs at Souda

Most of the work on a Souda job happens before the team boards: scope, plan and access are settled first, so the time on board goes on measurement.

The team flies in to Chania's Ioannis Daskalogiannis Airport, usually connecting through Athens, and reaches the port by road along the bay. Port passes, any launch boarding and permits for the fuel berth are arranged by the ship's agent, with crew lists and technician certificates sent in advance; the agent also confirms which areas are open to civil work. Because Greece applies the Schengen rules, every technician travels on a Schengen visa obtained in India. We recommend sending us the ship's expected dates as early as they are known, so visa applications can begin before the call is fixed.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

The inspection team is mobilised from India for each job; nobody is stationed at the port, so mobilisation is planned against the vessel's schedule and visa lead times. Our founder and Responsible NDT Level III, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has over eleven years of international field experience, plans and supervises the work. Technicians are certified under the company's written practice to ASNT SNT-TC-1A, and the company holds ISO 9001 and ISO 14001 certification.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Ro-pax ferries
  • Cruise ships
  • Product tankers
  • General cargo ships and coasters
  • Container ships and ro-ro units
  • Bulk carriers on regional trades
  • Offshore and service craft

Frequently asked questions

Can ships be gauged at anchor in Souda Bay?

Yes, at civil anchorage positions. The bay is sheltered, so launch transfers are usually more reliable than on the open Cretan coast. The agent books the launch and confirms the position is open to civil work. Spaces must be ventilated, tested and certified safe before we enter, and the master decides whether weather and the ship's programme allow it.

Does the naval base affect our gauging job?

It affects access and reporting rather than the technique. Only civil areas are used, passes and boat movements are arranged through the agent, and our photographs show only the vessel being inspected. If an exercise or restriction is in force on your dates, the agent will tell us, and we adjust the plan.

Is there a drydock at Souda for steel renewal?

There is no large repair yard here. Ships needing hull steel work normally go to yards near Athens or elsewhere in the Mediterranean. Gauging at Souda is best used as preparation, giving the owner measured readings to compare yard offers and to order plate before the ship leaves Crete.

What can be done on a ferry that is only alongside overnight?

Vehicle deck, ramp and accessible plating readings are realistic in a night stay. Tank entry needs preparation in advance and is better left for winter lay-up. We agree a short list of priority areas with the superintendent and measure them in the available hours.

Can one trip cover Souda and Heraklion?

Often yes. Both are on the north coast of Crete and are linked by road, so one mobilisation can cover ships at each if their dates line up. Tell us the vessels and windows, and we will plan the order of jobs and the visa period as one trip.

Does thickness measurement at Souda need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.