Maritime inspection · Greece
Ship Thickness Gauging at the Port of Corfu
Corfu is the Ionian Sea's busiest passenger port, a gateway where Italian and Albanian ferries, cruise ships and Greek island services all meet within a short stretch of waterfront. Ships here work to published timetables and rarely stay long. That shapes the gauging: short, targeted scopes planned around a turnaround. Technicians travel from India to join the ship at Corfu, with a work list agreed beforehand with the superintendent.
Adriatic ferries on a fixed rotation
Ro-pax ships linking Corfu with Italian ports sail to a pattern. Gauging fits the layover, concentrating on vehicle decks, ramp structure and ballast tanks, with ship staff clearing decks of parked traffic.
Cruise turnarounds, short and busy
Cruise ships call for a day and leave by evening. Work is limited to spaces the technical department can release, most often scrubber wash-water lines, sea-water pipework and a few voids.
Winter calm for longer scopes
Outside the tourist season passenger traffic thins and ferries run lighter schedules. That is the time for fuller deck and tank gauging, planned with the owner ahead of a spring docking.
Inspection services for ships at Corfu
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreCorfu's harbours on the Ionian coast
The main harbour at Corfu town lies on the island's east coast, facing the Albanian and Greek mainland across the Corfu Channel. A new port with ferry and cruise berths sits beside the old town, while the old harbour serves smaller craft. The channel is narrow at its northern end and wide open to the south, so the approach from the Adriatic is straightforward, but ships entering the harbour pass local ferries, yachts and fishing craft on a busy summer day.
Passenger traffic dominates. International ro-pax ferries run between Corfu and Italian ports on the Adriatic and Ionian coasts, domestic ferries link the island with Igoumenitsa, the mainland port facing it, and Greek islands, and cruise ships are scheduled in numbers during the season. Cargo is lighter: coasters bring supplies and building materials, coastal tankers supply fuel, and a few ships call with aggregate or other bulk goods. The seasonal swing is large, with the harbour crowded in summer and noticeably quiet in winter.
Corfu's weather is milder than the Aegean's, though winter storms from the south-west can shut berths for a day or two, and the swell inside the harbour matters for launch transfers. Ships seldom anchor for long, since the berths turn over quickly, but a ship waiting for a slot or for orders may anchor off the town in reasonable shelter. For gauging, the best windows are the winter lay-overs, when ro-pax ferries run reduced schedules and cruise calls fall away. A superintendent who books early can often secure a longer stay at a quiet berth, which turns a short targeted check into a full deck and tank programme.
Gauging at Corfu's berths and where ships dock instead
The island has a small shipyard and slipway for local craft, fishing boats and workboats, but no drydock for larger merchant ships or the big ferries. Work on the big ferries therefore happens at the quay: vehicle decks, ramps, side shell above the waterline, ballast tanks and, on cruise ships, the scrubber and sea-water pipework. When a hull docking is due, ships generally go to a yard in mainland Greece or across the Ionian Sea to Italy, and the Corfu readings are prepared for that docking.
Access depends on the berth. At the new port ferry berths, ships lie between rotations with vehicle decks empty for short periods, and the crew must agree release of the decks. Cruise berths are busier, with passengers embarking and shore excursions leaving, so gauging stays within the machinery and piping spaces the ship's engineers choose to open. In every case the ship's agent submits the technicians' details to the port authority and the ISPS security staff before arrival.
- New port ferry berths: car-deck, ramp and ballast-tank gauging on Adriatic and Ionian ro-pax ships between rotations.
- Cruise berths at the town: scrubber wash-water, sea-water piping and selected voids on cruise ships during the call.
- Old harbour quays: shell and tank readings on small coasters, tugs and workboats that use the smaller berths.
- Local slipway and small yard: hull gauging on fishing and harbour craft hauled out for survey.
- Anchorage off the town: launch-served gauging on ships waiting for a berth, weather and swell permitting.
- Handover to a docking yard: readings in TM plan format for the owner's chosen yard in Greece or Italy.
Thickness measurement through the survey cycle at Corfu
How much steel has to be gauged depends on which survey the ship is due for, its type and its age. The pattern below is the usual one under IACS unified requirements; the attending surveyor and the class rules for the ship decide the final extent. For a ship calling at Corfu, we agree the programme with the class and the owner before the team mobilises.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Ferries, passenger rules and Corfu's regulatory setting
Corfu is under Greek jurisdiction, with the Hellenic Coast Guard handling inspections and Paris MoU port state control applying to visiting foreign-flag ships. Ro-pax and cruise ships carry passenger-ship safety obligations that go beyond cargo ship rules, so a structural defect on a car deck or in the ballast system is a safety matter as well as a maintenance one. Coast Guard inspectors and flag state surveyors have a close view of the ferries on the Corfu run, which is a reason for owners to keep thickness records current.
Several EU rules push ferry owners to look at their steel. The Ship Recycling Regulation requires an up-to-date Inventory of Hazardous Materials, EU ETS covers passenger ships above the size threshold, and FuelEU Maritime is changing fuel choices. Older Adriatic ferries are being compared with newbuild alternatives, and thickness readings help an owner judge how many seasons remain in the hull. Cruise ships fitted with scrubbers have an added reason to measure wash-water pipework, because local discharge rules in the Ionian are applied through the port authority.
Since 1 May 2025 the whole Mediterranean has been a sulphur emission control area, so ships calling at Corfu burn 0.10% sulphur fuel or run a scrubber. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service and are worth adding to the gauging scope at every docking.
Typical gauging jobs at Corfu
Corfu jobs are short, selective and tied to a timetable. The superintendent sends the ferry's schedule, the class survey status and the areas of concern, and the team plans the work around the turnaround. Results are returned quickly so that the owner can decide whether a repair can wait for winter or must be brought forward. Typical requests are:
- An Adriatic ro-pax ferry between rotations: vehicle-deck plating, ramp structure and ballast-tank readings, with magnetic particle testing at ramp hinges.
- A cruise ship in port for a day: wall-thickness readings on scrubber wash-water and overboard lines, taken with the system shut down.
- A domestic ferry in winter lay-over: fuller gauging of decks, side shell and tanks ahead of a spring docking at a mainland yard.
- A small coaster at the old harbour: hold and deck gauging after discharge, for the owner's survey preparation.
- A pre-purchase check on a ferry or coaster, completed alongside before the buyer decides.
How a thickness measurement job runs at Corfu
Most of the work on a Corfu job happens before the team boards: scope, plan and access are settled first, so the time on board goes on measurement.
Corfu has its own international airport, with seasonal direct flights from several European cities and connections through Athens, so the team can usually reach the island without a long road transfer. Technicians from India need a Schengen visa for Greece. Because ferry and cruise timetables are fixed, mobilisation is tied to a confirmed berth and turnaround, and the agent files port access and security details with the harbour authority beforehand.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
The inspection team is mobilised from India for each job; nobody is stationed at the port, so mobilisation is planned against the vessel's schedule and visa lead times. Our founder and Responsible NDT Level III, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has over eleven years of international field experience, plans and supervises the work. Technicians are certified under the company's written practice to ASNT SNT-TC-1A, and the company holds ISO 9001 and ISO 14001 certification.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- International ro-pax ferries
- Domestic and island ferries
- Cruise ships
- Coasters and small cargo ships
- Coastal tankers
- Tugs and pilot boats
- Yachts and excursion craft
Frequently asked questions
Can a ro-pax ferry be gauged during a short turnaround at Corfu?
Yes, if the scope is focused. With the vehicle deck cleared and tanks prepared, the team can cover a defined list of areas, usually ramps, deck plating near the stern and a few ballast tanks. We agree the order of priority beforehand so the most important readings are done first.
Is there a drydock at Corfu for larger ships?
Not for merchant ships or large ferries. The island's small yard serves local craft. Larger vessels dock on the Greek mainland or at an Italian yard, and the Corfu gauging is arranged as preparation, with readings recorded in a format the docking yard can use.
Can cruise ship scrubber piping be inspected while passengers are aboard?
Often, yes, because the piping sits in machinery spaces and tunnels away from guests. The ship's engineers shut down and isolate the system, provide access and arrange hot-work and enclosed-space permits where needed. We measure wall thickness at bends, flanges and overboard connections.
What is the best season for longer gauging at Corfu?
Winter, when passenger traffic eases and ferries run lighter timetables. Some ships lie for longer between rotations, and cruise calls are rare. That lets us plan fuller scopes on decks and tanks, although the weather can delay launch transfers at the anchorage on stormy days.
Does thickness measurement at Corfu need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.