Maritime inspection · Greece
Ultrasonic Thickness Gauging for Ferries Calling at Igoumenitsa
Igoumenitsa, on the Epirus coast opposite Corfu, is where the Egnatia motorway meets the Adriatic ferry lines, so its quays handle a steady flow of lorries bound for Italy as well as the busy ferries to Corfu. Calls by the big Italy-route ro-pax ships are often brief, while the Corfu ferries turn round all day, so planning decides how much gauging gets done here. For each job we bring technicians from India and fit the work into layovers, lay days and the winter timetable.
Corfu shuttle ferries
Smaller ferries cross between Igoumenitsa and Corfu many times a day, several of them with open vehicle decks exposed to spray and heavy lorry traffic. Gauging decks, ramps, ballast tanks and hull framing fits best into overnight stops or quieter winter days.
Short calls on the Italy routes
Many Adriatic ro-pax ferries stop at Igoumenitsa only long enough to discharge and load before continuing south or back to Italy. Lines that terminate here, and lay days built into rotations, give the longer windows that tank gauging needs.
Freight from the Egnatia corridor
The motorway east to Thessaloniki and the Balkans feeds lorries and trailers onto the Italy ferries. That freight is what wears vehicle-deck plating, lashing points and ramp structure, the areas a measured survey on these ships should cover first.
Inspection services for ships at Igoumenitsa
Each service has its own page with the method, the class requirements and what the report contains.
Ultrasonic Thickness Measurement (UTM)
Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.
ExploreSpecial Survey Thickness Measurement
Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.
ExploreCAS (Condition Assessment Scheme)
Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.
ExploreCAP Thickness Measurement
Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.
ExploreESP Gauging
Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.
ExploreHull Structural Integrity
Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.
ExploreShip Piping Inspection
Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.
ExploreScrubber Piping Inspection
EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.
ExploreIHM (Inventory of Hazardous Materials)
IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.
ExploreMarine NDT Services
Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.
ExploreIgoumenitsa: Epirus ferry port at the end of the Egnatia corridor
Igoumenitsa sits in a sheltered bay on the Epirus coast of north-western Greece, facing the island of Corfu across a narrow stretch of the Ionian Sea, with the Albanian border a short distance to the north. The town grew as a port, and its role was transformed when the Egnatia motorway connected it with Ioannina, Thessaloniki and the border crossings into the Balkans and Turkey. Lorries that once crossed Greece on slower roads now reach the Adriatic ferries here directly. The Igoumenitsa Port Authority operates a large modern terminal for the international lines, with ro-pax berths, linkspans and marshalling yards, and keeps separate berths for the domestic ferries to Corfu and the nearby islands. Approaches from the Ionian are short and open, with no locks or bars to wait for.
Two fleets share the port. The international ro-pax ferries link Igoumenitsa with Ancona, Bari, Brindisi and Venice; most call here on rotations that continue to or from Patras, while some lines turn round at Igoumenitsa itself. They carry heavy goods vehicles, trailers, cars and passengers throughout the year, with summer adding holiday traffic. The domestic fleet is smaller and busier: ferries shuttling to Corfu town and to Lefkimmi in the south of the island, and services to Paxi, each making several crossings a day in season. These are mostly smaller ro-pax vessels, several of them with open or partly open vehicle decks. Coastal cargo ships, fishing vessels and yachts complete the picture, and between them the two fleets keep the quays busy from early morning until late at night.
The bay is protected by the coast and by Corfu, but winter storms from the south and south-west can still disturb the strait and occasionally delay sailings, and heavy rain is a feature of the Epirus winter. Summer is calm and busy, and tides are negligible. For inspection, the rhythm of the port matters more than the weather. International ferries spend a short, fixed time alongside, Corfu ferries turn round quickly through the day, and operators take ships out of service mainly in the winter months for dockings and refits elsewhere. The practical windows are therefore overnight stops, scheduled lay days, the quieter winter timetable, and periods when a ferry is held in port between charters or before being redeployed.
Gauging options at Igoumenitsa
There is no shipyard at Igoumenitsa, so all gauging here is done afloat. On the international ferries, the work takes place at the ro-pax berths while vehicles are off: vehicle-deck plating and stiffeners, internal and stern ramps, shell door surrounds, mooring decks and the structure beneath lashing points. On a ship whose line terminates here, or which spends a lay day in port, ballast tanks and voids can be added if the crew empties and certifies them. Corfu ferries are best gauged during their overnight stop or on a quieter winter day, when the vessel can be held at its berth for a few hours without breaking the island link.
When steel renewal is needed, the ships leave. International ferries usually dock in Attica, at Perama, Salamina or the Elefsina bay, or at yards in Italy or further afield chosen by their operators, and the domestic ferries go to whichever yards their owners use. Gauging at Igoumenitsa beforehand gives the operator a measured scope to send ahead, and lets the yard prepare plate and labour so the refit fits the winter window. For lorry-heavy ferries, readings on the main freight deck taken over successive calls also show how fast wastage is progressing, which helps decide whether a deck can wait for the next docking or needs attention now.
- International ro-pax berths: vehicle deck, ramp, shell door and lashing-point gauging while the ferry is discharged
- Terminating-line and lay-day berths: longer scopes with ballast tanks, voids and shell framing from inside
- Domestic ferry berths: deck, ramp and tank gauging on Corfu and Paxi ferries during overnight stops or winter lay-ups
- Igoumenitsa bay anchorage: condition and pre-purchase gauging by launch on vessels waiting off the port
- Attica and overseas yards: where Igoumenitsa ferries usually dock for bottom gauging and steel renewal
Thickness measurement through the survey cycle at Igoumenitsa
Every renewal survey asks for more thickness measurement than the last, and for oil tankers, chemical tankers and bulk carriers the ESP Code adds close-up survey on top. The table is the usual shape of the work; the class rules and the surveyor set the exact extent, which is why the measurement plan for a job at Igoumenitsa is agreed in writing before mobilisation.
| Survey | When it falls | What the thickness measurement usually covers |
|---|---|---|
| Annual survey | Every year, within three months of the anniversary date | General examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey. |
| Intermediate survey | In place of the second or third annual survey | Suspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age. |
| Renewal survey No. 1 | Around 5 years | The first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal. |
| Renewal survey No. 2 | Around 10 years | Wider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey. |
| Renewal survey No. 3 | Around 15 years | Extensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal. |
| Renewal survey No. 4 and later | Around 20 and 25 years | Gauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme. |
| Docking survey | Twice in each five-year period | Bottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged. |
Ferry inspection rules and the Corfu link
Igoumenitsa falls under the Paris MoU, with port state control and harbour supervision exercised by the Hellenic Coast Guard through the Igoumenitsa harbour master. The international ro-pax ferries are subject to EU host-state inspections for ro-pax ships in regular service, and the domestic ferries to Corfu and Paxi are surveyed by the Greek flag administration and their class under EU standards for passenger ships on domestic voyages. Ships calling at EU ports must carry an Inventory of Hazardous Materials under the EU Ship Recycling Regulation, and the Italy routes count as EU voyages for the Emissions Trading System and FuelEU Maritime.
The Corfu link is a lifeline for the island as well as a tourist route, so its ferries carry fuel trucks, supply lorries and construction traffic alongside holiday cars, and they run in every season. Open vehicle decks on some of these ships are wetted by rain and sea spray on every crossing, and their deck plating, coamings and drainage arrangements corrode faster than the enclosed decks of larger ferries. Operators deciding whether to keep or replace these ships need measured data on decks, ballast tanks and hull framing to judge how much life is left. The international ferries face a different pressure: freight from the Egnatia corridor keeps their decks loaded, and they must stay on schedule to keep the hauliers' business.
Since 1 May 2025 the whole Mediterranean has been a sulphur emission control area, so ships calling at Igoumenitsa burn 0.10% sulphur fuel or run a scrubber. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service and are worth adding to the gauging scope at every docking.
Gauging jobs typical of Igoumenitsa
Requests at Igoumenitsa come from two directions. Operators of the Italy-route ferries want vehicle decks, ramps and tanks measured during calls and lay days, building a steel scope for the next refit without missing a sailing. Owners of the domestic ferries want condition data on smaller, hard-worked ships, usually during overnight stops or the winter. Buyers looking at a ferry held in port between deployments bring pre-purchase work. Each plan is agreed with the operator and master so that gauging fits the timetable, starting with the structure that matters most, and results are sent area by area so the next call's scope can be adjusted. Typical scopes:
- Open vehicle deck, ramp and drainage area gauging on a Corfu shuttle ferry over two overnight stops in the winter timetable.
- Main freight deck and lashing-point gauging on an Italy-route ro-pax ferry during a lay day, with readings compared against the previous survey.
- Ballast tank and void-space gauging on a ferry whose Brindisi line terminates at Igoumenitsa, ahead of a winter docking in Attica.
- Magnetic particle checks at bow door or stern-ramp hinge foundations on an international ferry, together with gauging of the adjacent plating.
- Pre-purchase condition gauging on a small ferry held in port between charters, covering deck, hull framing and tanks.
How a thickness measurement job runs at Igoumenitsa
The sequence for a thickness measurement job at Igoumenitsa is short and written down, so the yard, the surveyor and the superintendent know who arranges what.
Ioannina and Preveza (Aktion) airports are the closest mainland arrival points, with onward travel by road, and Corfu airport is across the strait by ferry; Athens and Thessaloniki give more international connections, with a longer road journey. The international terminal is an ISPS-controlled area, so the operator or the ship's agent arranges passes and boarding with the technicians' certificates and equipment lists. Technicians travel from India on Schengen visas. Because ferry lay days are usually fixed well ahead, we tie the visa application to the operator's published schedule.
- Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
- We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
- Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
- Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
- Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
- The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.
Who does the work, and when class approval applies
We send the team from India to the ship for each job rather than keeping staff at the port, and plan the mobilisation around visas and the vessel's itinerary. The work is planned and supervised by the founder, our Responsible NDT Level III (ASNT NDT Level III in UT, RT, MT, PT and VT, with more than eleven years of international field experience). Technicians hold certification under the company's written practice to ASNT SNT-TC-1A; Atlantis is ISO 9001 and ISO 14001 certified.
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Governing codes and standards
- IACS UR Z7 hull classification surveys
- IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
- IACS UR Z17 approval of service suppliers
- SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
- MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
- The rules of the vessel's classification society
What you receive
- Thickness measurement report on the class formats, with sketches
- Summary of substantial and excessive corrosion against allowable margins
- Pitting and grooving records with depth and extent
- Piping wall-thickness tables with isometric sketches
- Magnetic particle or penetrant crack-detection reports
- Gauge calibration records and technician certificates
Industries served
- International ro-pax ferries
- Freight ro-ro ships
- Domestic ferries to Corfu and Paxi
- Coastal cargo ships
- Fishing vessels
- Yachts
Frequently asked questions
International ferries stop only briefly at Igoumenitsa. Is gauging realistic?
During a short transit call, only a small scope, usually a section of vehicle deck or a ramp, and only if the operator agrees. The realistic windows are lay days, lines that terminate here, and periods when the ship is held in port. Many operators instead split the work between Igoumenitsa and Patras or the Italian port on the same rotation.
Can Corfu ferries be gauged without interrupting the island service?
Yes, by using the overnight stop or a winter day when the timetable allows one ship to be held. On these smaller ferries, the vehicle deck, ramps, drainage areas, ballast tanks and hull framing can usually be covered over one or two such windows. The operator decides which sailings can be released, and we plan the sequence so the ship is ready for its next crossing.
Why do open vehicle decks need particular attention?
Because they are wetted by rain and spray on every crossing and rarely dry out fully, while lorry tyres wear away the coating. Corrosion concentrates in deck plating near the drains, at the junction with coamings and side structure, and around lashing points. Measured readings show whether wastage is general or local, which decides between patch repairs and renewing deck plating at the next docking.
Can the same mobilisation include ships in Patras or Albanian ports?
Patras is reached by motorway and is often combined with Igoumenitsa on the same rotation. Albanian ports such as Vlorë and Durrës are close geographically but lie outside the Schengen area, and Albania has its own entry rules, which we check for each technician. Tell us early if a programme includes Albanian calls, so travel and entry can be planned together.
Does thickness measurement at Igoumenitsa need class approval?
Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.
Planning a survey or a drydock?
Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Request a QuoteRequest a ship gauging quote
Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.
Speak to an ASNT NDT Level III
Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.