CCS NDT Inspection — Code-Aligned Atlantis NDT Delivery 2026
Atlantis NDT performs NDT on CCS assets: UT (including PAUT and TOFD), RT, MT, PT and VT, with procedures and reports reviewed by an ASNT NDT Level III. Results can be carried into Atlantis ERP, the Digital Twin platform and the reporting software. Every job is quoted on request.
Assets We Inspect in CCS
amine absorber + stripper tower (post-combustion CO2 capture), dense-phase / super-critical CO2 transport pipeline (ASME B31.4 + ISO 27913 + DNV-RP-F104), CO2 injection well (Class VI per EPA UIC Program), salt-cavern + saline-aquifer + depleted-reservoir storage, BECCS biomass-energy CCS, DAC (direct air capture) unit. Methods: UT (including PAUT and TOFD), RT, MT, PT and VT. Technicians are certified by their employer to its SNT-TC-1A written practice, and procedures and reports are reviewed by an ASNT NDT Level III (UT, RT, MT, PT, VT). Plus integration with 3D Scanning (LiDAR + photogrammetry + drone) for as-built dimensional control.
Damage Mechanisms (API 571 Cross-Reference)
Dominant damage mechanisms in CCS per API RP 571: amine corrosion + cracking (NACE MR0103 + API 571 §4.5.4), wet super-critical CO2 corrosion (water control critical), brittle fracture on rapid depressurisation (low-temp transition), running-ductile-fracture propagation control, hard-spot + sour-service if H2S impurities present (NACE MR0175 / ISO 15156), cement-sheath integrity on injection well, caprock geomechanical breach risk. Atlantis NDT maps these damage mechanisms onto the inspection results on the 3D model, so the owner's integrity team sees every finding in context.
Inspection Data for RBI and FFS Programmes in CCS
Atlantis NDT does not perform RBI (API 580/581) or fitness-for-service (API 579) assessments. For CCS programs it supplies what those assessments depend on: qualified NDT data by damage mechanism, flaw sizing, thickness trends per CML and ASNT Level III review, exportable to the owner's RBI or integrity software. Records are retained in Atlantis NDT ERP with the procedure, calibration and certification evidence behind each result.
Atlantis NDT Stack Configuration for CCS
CCS customers get an integrated Atlantis NDT stack: Atlantis NDT ERP (asset register + circuit hierarchy + inspection schedule + cert tracking + calibration cert + audit-ready records), Digital Twin platform (3D asset model with overlaid damage-mechanism heat-map), Reporting Software (mobile + offline field capture with code-aligned templates), Atlantis NDT LMS (continuous inspector cert refresh per CCS-specific scope), Atlantis NDT Academy (ASNT SNT-TC-1A pathway + multi-scheme cert roster tracking). All affordable, accessible, fully customizable.
Free Consultation + Next Steps for CCS Operators
Atlantis NDT publishes no pricing — pricing varies by region, scope, delivery model, and team size. Free 30-minute consultation with Atlantis NDT founder Anoop Rayavarapu (ASNT NDT Level III in UT, RT, MT, PT and VT): asset-class scoping, damage-mechanism review, code-stack mapping, inspector roster + cert scheme review, software-stack scoping, delivery model preference. Every job is quoted on request; we reply within one business day. Request your free consultation. See also consulting services, training, Atlantis NDT Academy, 3D Scanning, ISO 9001 quality system.