Every refinery and chemical plant around the Houston Ship Channel is built from pressure vessels: crude towers, coke drums, reactors, separators, accumulators and the shells of heat exchangers. An API 510 inspector tells the owner whether each one can keep running at its rating, needs a repair or must be rerated. This page is for NDT technicians, welders, operators, engineers and contract inspectors in Harris, Galveston, Chambers and Brazoria counties preparing for the API 510 Pressure Vessel Inspector examination.
The Atlantis course is self-paced and online, with an instructor who answers your questions as you work through the codes. There is no Atlantis classroom in Houston. Atlantis has an office in Houston, yet a candidate in Baytown studies exactly the same material as one in Sugar Land or League City, on a schedule that suits their shift pattern. The American Petroleum Institute (API) sets the eligibility rules, administers the API 510 examination at Prometric test centres and issues the certification. The course prepares you for that examination; it does not count towards the experience API asks you to document.
Where API 510 inspectors work around Houston
The Energy Information Administration's survey of operable refineries as of January 2026 gives a dependable map of where crude is still processed near the city. The table lists the plants within reach of Houston with the operating company as EIA records it, the parent company in brackets where the two differ, and the processing units that generate the most vessel inspection.
| Operator (EIA listing) | Location | Crude distillation, barrels per calendar day | Units that add vessel work |
|---|---|---|---|
| Marathon Petroleum Co LP | Galveston Bay refinery, Texas City | 631,000 | Delayed coking, catalytic cracking, distillate and residual hydrocracking |
| ExxonMobil Refining & Supply Co | Baytown | 564,500 | Delayed and fluid coking, catalytic cracking, distillate hydrocracking |
| Deer Park Refining LP (Pemex) | Deer Park | 312,500 | Delayed coking, catalytic cracking, gas oil hydrocracking |
| Phillips 66 Company | Sweeny | 277,000 | Delayed coking, catalytic cracking |
| Valero Refining Co Texas LP | Texas City | 225,000 | Vacuum distillation, delayed coking, catalytic cracking |
| Valero Refining Co Texas LP | Houston | 205,000 | Vacuum distillation, catalytic cracking, distillate hydrocracking |
| Pasadena Refining Systems Inc (Chevron) | Pasadena | 118,750 | Vacuum distillation |
| Kinder Morgan Crude & Condensate | Galena Park | 105,000 | Atmospheric distillation of condensate |
| Hartree Refining LLC | Channelview | 45,000 | Atmospheric distillation |
| Texas International Terminals | Galveston | 45,000 | Atmospheric distillation |
| Petromax Refining Co LLC | Houston | 25,000 | Atmospheric distillation |
LyondellBasell's former Houston refinery is absent from the list because it stopped refining crude in 2025. Two ownership changes are worth knowing when you read job postings: Chevron bought the Pasadena refinery from Petrobras in 2019, and Shell completed the sale of its Deer Park refinery interest to its partner Pemex in 2022 while keeping full ownership of the Deer Park Chemicals plant next door.
Chemical plants add a second large population of vessels. ExxonMobil's 2026 fact sheet describes its Baytown complex as roughly 3,400 acres holding a refinery, a chemical plant and the Baytown Olefins Plant, with about 1,900 employees and an average of 4,800 contract personnel on site. Chevron Phillips Chemical's Cedar Bayou plant, also in Baytown, makes ethylene, normal alpha olefins, propylene and three types of polyethylene: high-density, low-density and linear low-density. Their reactors, quench towers and refrigeration drums are API 510 equipment once in service.
The vessels a Houston API 510 inspector signs for
- Columns and towers. Crude and vacuum towers, fractionators, strippers and absorbers, where shell thinning near liquid levels and feed nozzles is typical.
- Coke drums. EIA lists delayed coking at Baytown, Deer Park, Galveston Bay, Texas City and Sweeny. Drums that are filled hot and quenched on every cycle tend to bulge and crack, so shell distortion surveys and weld inspection at the skirt are routine work for the inspectors assigned to those units.
- Hydroprocessing reactors and separators. Hydrocracking capacity at Baytown, Deer Park, Galveston Bay and Valero's Houston refinery means thick-walled vessels in hot hydrogen service, where high-temperature hydrogen attack and high-temperature H2/H2S corrosion are the mechanisms to screen.
- Heat exchanger shells, channels and heads. NDT crews test the tubes; the API 510 inspector judges the pressure-retaining shell side and what the tube results mean for the next run.
- Drums and accumulators in sour and amine service. Overhead accumulators, amine contactors and regenerators, sour water strippers and flare knock-out drums are where wet H2S damage and amine stress corrosion cracking turn up.
- Boiler-side vessels. Deaerators, condensate drums and blowdown vessels sit beside the steam system; boiler water and steam condensate corrosion appears in the examination's damage-mechanism list for exactly this reason.
- Pressure-relieving devices. API RP 576 is on the examination, so learn how relief valves are inspected, tested and recorded.
Houston damage mechanisms in the API 510 Body of Knowledge
The current API 510 Body of Knowledge limits API RP 571 questions to its definitions section and fifteen mechanisms. A Houston candidate has usually met most of them on the job, which helps, but the exam asks for RP 571's description: the affected materials, the critical factors, the appearance of the damage and the inspection methods. The table links each mechanism to the local units where you have probably seen it.
| Mechanism on the BOK list | Typical Houston location | What to learn for the exam |
|---|---|---|
| Wet H2S damage (blistering, HIC, SOHIC, SSC) | Sour water strippers, overhead accumulators, FCC gas plants | Which forms affect which steels, and why hardness and PWHT matter |
| Amine stress corrosion cracking | Amine contactors, regenerators and lean/rich exchangers | The role of residual stress and why non-PWHT carbon steel is susceptible |
| High-temperature hydrogen attack; high-temperature H2/H2S corrosion | Hydrocracker and hydrotreater reactors, effluent exchangers | Critical factors of temperature and hydrogen partial pressure, and the limits of conventional NDE |
| Sulfidation; naphthenic acid corrosion | Crude and vacuum unit heater outlets, transfer lines and tower bottoms | How sulfur, acid content, velocity and alloy choice change the rate |
| Caustic corrosion; caustic stress corrosion cracking | Caustic treaters and injection points upstream of vessels | The temperature and concentration envelope, and why stress relief helps |
| Corrosion under insulation; chloride stress corrosion cracking | Insulated drums and columns exposed to humid, salty coastal air | Temperature ranges for carbon steel CUI and external chloride cracking of stainless |
| Brittle fracture | Older carbon steel vessels that are pressurised cold or hydrotested on a cool day | How MDMT and UCS-66 exemption curves connect to the mechanism |
Atmospheric corrosion, boiler water and steam condensate corrosion, hydrochloric acid corrosion and erosion/erosion-corrosion complete the list. Where your site's name for a problem differs from RP 571's, learn RP 571's terms, because those are the words the question uses.
Section VIII and API 510 calculations, with a Ship Channel example
Calculation questions concern existing vessels under internal pressure, in US customary or SI units. The Body of Knowledge names them: required thickness and part MAWP for cylindrical shells (UG-27) and for ellipsoidal and hemispherical heads (UG-32), joint efficiency from Table UW-12 and the radiography marks on a nameplate (UW-11), test pressure corrected for temperature (UG-99 and UG-100), impact-test exemption with UCS-66, and attachment weld sizes at openings (UW-16). Corrosion rates, remaining corrosion allowance, remaining life and inspection intervals come from API 510 itself, and API warns that their formulas may be asked closed-book.
Take a hypothetical overhead accumulator at a Ship Channel refinery: inside diameter 72 in., design pressure 250 psig, allowable stress given as 20,000 psi, and a nameplate showing spot radiography, so Table UW-12 gives E = 0.85 for its Type 1 longitudinal seams.
- Required shell thickness: t = PR / (SE − 0.6P) = 250 × 36 / (20,000 × 0.85 − 0.6 × 250) = 9,000 / 16,850 = 0.534 in.
- Corrosion rate: the shell read 0.750 in. eight years ago and 0.690 in. now, so (0.750 − 0.690) / 8 = 0.0075 in. per year.
- Remaining life: (0.690 − 0.534) / 0.0075 = 20.8 years.
- Internal inspection interval: API 510 allows the lesser of half the remaining life or ten years, so ten years governs here.
The common errors are using the diameter instead of the radius and taking E as 1.0 because the seams look sound. Worked examples of this kind are a large part of the course, and the instructor answers questions on any step that will not come out. For more on the code itself, see the API 510 code explainer.
Owner-user inspection departments and contract inspectors
Much of Houston's vessel inspection is planned and approved by the owner-user's own inspection group, the department at each refinery or chemical plant that keeps the equipment files, sets intervals and signs repair and rerate documents. API 510 recognises an owner-user's inspection organisation as one kind of authorized inspection agency, alongside independent organisations working under contract to the owner, which is why both employers appear on the applications Houston candidates submit.
Contractors supply most of the extra people during turnarounds; firms headquartered in the area, Team, Inc. in Sugar Land among them, provide inspection, condition assessment, maintenance and repair services. If your experience is spread across several contractors and sites, keep a running log of the vessels you inspected and your role on each, signed by the supervisor at the time. API verifies experience, and a record rebuilt years later from memory is harder to support.
Routes into API 510 for Houston candidates
API matches education to experience: one year of inspection activity with an engineering or technology degree, two years with a two-year degree or certificate, three years with a high school diploma, and five or more with no formal education, gained in the last ten years while employed by or under contract with an authorized inspection agency. The full scale and the wording API uses are on the API 510 certification requirements page.
- NDT technicians on contractor crews often have years of thickness surveys and weld inspection on vessels already. ASNT training for those roles is described on the NDT training in Houston page.
- Graduates of San Jacinto College's Fixed Equipment Inspection Technology degree will have taken pressure vessel inspection and pressure piping and valve inspection courses in their second year. Ask API whether your award counts towards the education tier before you rely on it.
- Welders and welding inspectors can count repair and fabrication work on vessels; some take the welding inspector credential first, described on the CWI exam preparation page for Houston.
- Operators and engineers know their units well but still need documented time supervising or performing inspection; with a bachelor's degree that is one year.
Studying for API 510 from a Houston job
Preparing while you work in a plant puts the paperwork the exam describes all around you. Read a manufacturer's data report and a nameplate in your unit, find the radiography mark and the MDMT, and check whether you could defend the joint efficiency used in the last thickness calculation.
Because the course is self-paced, a candidate on a rotating schedule at a Pasadena or Texas City site can work through Section VIII on days off and slow down during a turnaround. If a practice answer seems to contradict what your unit actually does, send it to the instructor; the reply works from the code text, which is what the examination marks.
Other ways to prepare in Houston, compared honestly
- College programmes. San Jacinto College and Lone Star College run inspection technology programmes over several terms; they suit people early in their careers rather than one exam window.
- In-person exam-prep classes. Private training companies run them on fixed dates, which suits candidates who can take the time off but is hard to fit around a turnaround.
- Employer mentoring. Valuable experience beside a certified inspector, though it rarely covers every code section the exam samples.
- The Atlantis course. Self-paced study with instructor Q&A, practice papers in the exam's two-part format and no fixed dates. Fees are quoted on request.
Sitting the exam and sponsoring candidates
Once API accepts your application you book a seat in Prometric's system; Prometric lists test centres in and around Houston. The day runs about 7.5 hours, closed-book first and open-book after lunch, with the code PDFs on the computer and nothing of your own allowed in the room. Avoid booking it straight after a night shift.
Houston-area owner-users and contractors can enrol several API 510 candidates at once, mixed with other API exams if needed. Employers help most by signing accurate experience records promptly and keeping candidates off the turnaround roster during the exam window. See the API exam schedule for windows and deadlines.
How the API 510 exam-prep course works from Houston, TX
The course is self-paced and online, on the Atlantis learning portal. You study on your own schedule, there are no scheduled class times, and an instructor answers your questions as you work through the material. You can start when you enrol and set your own pace towards the exam window you are aiming for.
What you work through
A study plan built on the API Body of Knowledge and the Publications Effectivity Sheet for your exam window, video lessons and study notes for each code and recommended practice the exam draws on, worked calculation examples, original practice questions with explanations, and timed practice papers that copy the closed-book and open-book structure of the real examination.
Instructor Q&A
When a calculation will not come out, a clause reads two ways or you cannot find where the open-book answer lives, you send the question and the instructor answers it. Questions are answered from the code text, so you learn where the answer sits as well as what it is.
Fees are quoted on request. The American Petroleum Institute sets the eligibility rules, administers the examination in person at Prometric test centres and issues the certification; each candidate applies to API individually. Atlantis is not an API-approved training provider and the course does not grant certification. API exam windows and application deadlines.
Frequently asked questions
Can I attend an API 510 class in Houston in person?
Not with Atlantis. There is no Atlantis classroom in Houston, although Atlantis has an office there. The API 510 course is self-paced and online, and an instructor answers your questions as you study, which suits shift work and turnaround travel along the Ship Channel. The examination itself is the only in-person part: you sit it at a Prometric test centre after API approves your application.
Do coke drum and hydrocracker topics come up on the API 510 exam?
Not by unit name. The examination tests API 510, the listed sections of API RP 571 and the other documents in the Body of Knowledge. Several listed mechanisms, such as high-temperature hydrogen attack, high-temperature H2/H2S corrosion and sulfidation, are exactly what Houston inspectors meet in hydroprocessing and coking units, so field experience helps, but the answer must come from RP 571's wording rather than site practice.
Does contract inspection on Ship Channel turnarounds count toward API 510 eligibility?
It can, if the work was supervising or performing inspection activities on pressure vessels as API 510 describes them and you were employed by or under contract with an authorized inspection agency at the time. API verifies the experience you document, so keep dates, sites, equipment and your role for each assignment, and ask a supervisor who saw the work to confirm it. The certification requirements page summarises the rules.
Which Section VIII calculations should a Houston candidate practise most?
UG-27 shell thickness and part MAWP, UG-32 head thickness for ellipsoidal and hemispherical heads, Table UW-12 joint efficiency with the nameplate radiography marks, UG-99 and UG-100 test pressure corrected for temperature, UCS-66 impact-test exemption and UW-16 weld sizes at openings. Add the API 510 corrosion rate, remaining life and interval rules, which may be asked closed-book. Practise each in both US customary and SI units.
I already hold API 570. Is API 510 worth adding in Houston?
For many unit inspectors it is, because a process unit is vessels joined by piping and contractors can then assign one person to both scopes. The two examinations share API RP 571, RP 577 and RP 578, parts of RP 576, ASME Section V and IX and PCC-2, though the RP 571 mechanism lists and the PCC-2 articles differ, so part of your study carries over. The new material is mainly API 510 itself, ASME Section VIII Division 1, RP 572 and the rest of RP 576.
Does a San Jacinto College inspection degree replace API 510 exam prep?
No; the two do different jobs. A college programme teaches inspection over several terms and can help you qualify for the education part of API's scale, if API accepts the award as engineering or technology. Exam prep focuses on the specific documents, editions and question styles of your exam window. Many candidates finish a degree, gain experience on the job and then prepare for the exam itself.
Can a Baytown or Pasadena employer enrol several API 510 candidates?
Yes. An owner-user or contractor can sponsor a group, and the group can mix API 510 with other API exams. Fees are quoted on request. Each candidate studies at their own pace, asks the instructor their own questions and applies to API individually. Tell us the number of candidates and the windows they are aiming for when you enquire.
Where do Houston candidates sit the API 510 exam?
At a Prometric test centre, booked after API approves the application; Prometric lists centres in and around Houston. The computer-based exam has 170 questions, 110 closed-book and 60 open-book, over a day of about 7.5 hours including a short tutorial and a lunch break. For the open-book part the code documents are on screen, and you may not bring books or notes.
Related pages
- API 510 training: course overview
- API 510 certification requirements
- API 570 training in Houston, TX
- API 580 training in Houston, TX
- API 653 training in Houston, TX
- API inspector training in the Gulf Coast
- NDT training in Houston, TX
- AWS CWI exam prep in Houston, TX
API 510 training in other cities: Corpus Christi, TX · Beaumont, TX · Lake Charles, LA · Baton Rouge, LA · New Orleans, LA · Mobile, AL.
Enquire about API 510 exam prep
Tell us which API examination you are preparing for, the exam window you are aiming at and, if you are an employer, how many candidates you are sponsoring. We reply within one business day with the course details and a quote.