NDT Inspection Management ERP in Rabigh — Certification, Calibration and Work Orders in One System

Atlantis NDT ERP is inspection-management software for NDT service companies, inspection contractors and QA departments operating in Rabigh, Saudi Arabia. It replaces the spreadsheet stack most inspection businesses run on: technician certification currency, equipment calibration control, inspection scheduling, multi-crew work orders, client asset registers, job costing and audit-ready document retention — on one Odoo-based platform with 30+ business apps behind it.

The Rabigh market this is configured for

Petro Rabigh integrates a major refinery with an ethylene/polyethylene petrochemical complex on the Red Sea coast — one of the largest single-site refining-petrochemical integrations globally, with the Rabigh II expansion adding ethylene crackers, aromatics units and specialty chemical trains. Cryogenic ethylene storage, high-temperature cracker furnaces, and dense brownfield piping create asset integrity challenges tracked via API 570/510 programs; digital twins let Petro Rabigh and its EPC partners visualize FFS assessments and RBI data across a sprawling integrated site without repeated site walks through hazardous cracker areas.

Industries served from Rabigh

Modules inspection companies actually switch for

Integrations

Runs alongside SAP, Oracle, Maximo, NetSuite, Dynamics 365, QuickBooks and Xero, and connects to the Atlantis Digital Twin platform so inspection results feed the 3D asset model without re-keying.

Frequently Asked Questions

Does Atlantis NDT ERP suit an inspection company based in Rabigh?

Yes. The platform ships pre-configured for inspection and testing businesses — ASNT SNT-TC-1A and ISO 9712 certification tracking with automatic lapse lockout, equipment calibration due-date control, API 510/570/653 inspection scheduling, work-order routing across multiple crews and sites, and client-ready reporting. Regional settings, currencies, tax treatment and language for Saudi Arabia are configured during onboarding rather than sold as an add-on module.

How long does implementation take for a mid-size Rabigh inspection contractor?

A typical 20–60 technician inspection business goes live in 6–10 weeks: week 1–2 discovery and data migration mapping, week 3–5 configuration of certification, calibration and work-order modules, week 6–7 pilot with one crew and one client contract, week 8–10 rollout and training. Historic certification records, calibration certificates and client/asset registers are migrated from spreadsheets or the incumbent system as part of the implementation.

Can it replace the spreadsheets we use for technician certification and equipment calibration?

That is the most common reason inspection companies adopt it. Every technician's method-level qualification, vision-exam date, practical and general exam records and on-the-job hours sit against a written practice, and any expiry blocks assignment to a job automatically. Equipment calibration works the same way — an out-of-calibration flaw detector, thickness gauge or reference block cannot be dispatched. That removes the two failure modes that most often cost inspection firms a client audit.

See it on your own workflow

Free 30-minute walkthrough using your actual job types, certification matrix and client reporting formats. Affordable, accessible, fully customizable — request a demo and tailored quote.

Related: Atlantis NDT ERP · NDT inspection software · inspection management software · Digital Twin in Rabigh · NDT reporting software.