NDT Inspection Management ERP in Jazan — Certification, Calibration and Work Orders in One System

Atlantis NDT ERP is inspection-management software for NDT service companies, inspection contractors and QA departments operating in Jazan, Saudi Arabia. It replaces the spreadsheet stack most inspection businesses run on: technician certification currency, equipment calibration control, inspection scheduling, multi-crew work orders, client asset registers, job costing and audit-ready document retention — on one Odoo-based platform with 30+ business apps behind it.

The Jazan market this is configured for

Jazan hosts Saudi Aramco's Jazan Refinery and Terminal within Jazan Economic City, paired with the Jazan IGCC — one of the world's largest integrated gasification combined-cycle plants, converting refinery residue into syngas for power generation. High-pressure gasifiers, cryogenic units, and dense piping racks at this remote Red Sea coastal site make 3D digital twin visualization essential to compress turnaround planning and reduce costly crew mobilization to the site. FFS assessments per API 579 on residue-upgrading units, combined with Aramco's SAEP-1112 NDE documentation requirements, drive demand for digital-twin-integrated inspection records that let engineers in Dhahran or Riyadh review Jazan asset condition remotely.

Industries served from Jazan

Modules inspection companies actually switch for

Integrations

Runs alongside SAP, Oracle, Maximo, NetSuite, Dynamics 365, QuickBooks and Xero, and connects to the Atlantis Digital Twin platform so inspection results feed the 3D asset model without re-keying.

Frequently Asked Questions

Does Atlantis NDT ERP suit an inspection company based in Jazan?

Yes. The platform ships pre-configured for inspection and testing businesses — ASNT SNT-TC-1A and ISO 9712 certification tracking with automatic lapse lockout, equipment calibration due-date control, API 510/570/653 inspection scheduling, work-order routing across multiple crews and sites, and client-ready reporting. Regional settings, currencies, tax treatment and language for Saudi Arabia are configured during onboarding rather than sold as an add-on module.

How long does implementation take for a mid-size Jazan inspection contractor?

A typical 20–60 technician inspection business goes live in 6–10 weeks: week 1–2 discovery and data migration mapping, week 3–5 configuration of certification, calibration and work-order modules, week 6–7 pilot with one crew and one client contract, week 8–10 rollout and training. Historic certification records, calibration certificates and client/asset registers are migrated from spreadsheets or the incumbent system as part of the implementation.

Can it replace the spreadsheets we use for technician certification and equipment calibration?

That is the most common reason inspection companies adopt it. Every technician's method-level qualification, vision-exam date, practical and general exam records and on-the-job hours sit against a written practice, and any expiry blocks assignment to a job automatically. Equipment calibration works the same way — an out-of-calibration flaw detector, thickness gauge or reference block cannot be dispatched. That removes the two failure modes that most often cost inspection firms a client audit.

See it on your own workflow

Free 30-minute walkthrough using your actual job types, certification matrix and client reporting formats. Affordable, accessible, fully customizable — request a demo and tailored quote.

Related: Atlantis NDT ERP · NDT inspection software · inspection management software · Digital Twin in Jazan · NDT reporting software.