Maritime inspection · Singapore

Thickness Gauging for Ships at Singapore's Anchorages and Yards

Singapore is the world's largest bunkering port, and its anchorages hold ships calling for fuel, crew changes, stores, surveys and repairs without working cargo. Add one of Asia's main ship-repair clusters and a dense community of ship managers, and it becomes a natural place to gauge a ship between voyages. The typical Singapore job is anchorage work during a stop the ship is making anyway, alongside yard dockings and berth calls; for each one, technicians fly in from India to the vessel.

Gauging during a bunker or crew stop

A ship already stopping at the Eastern or Western anchorages for fuel, crew or stores is out of cargo operations. A prioritised gauging list fitted to that stay collects condition data without adding a port call.

Scrubbers idle in port waters

Open-loop wash-water discharge is not permitted in Singapore port waters, so many scrubbers are shut down or on closed loop at anchor — the right moment to gauge wash-water lines and overboard penetrations.

Yard dockings and conversion work

Singapore's repair yards handle renewal surveys, major repairs and conversions. Gauging is timed to the yard's cleaning and staging, with readings released space by space for steel renewal decisions.

Inspection services for ships at Singapore

Each service has its own page with the method, the class requirements and what the report contains.

Ultrasonic Thickness Measurement (UTM)

Hull, tank, deck and bulkhead gauging recorded on the class thickness-measurement formats, with sketches and corrosion flagged against the allowable margins.

Explore

Special Survey Thickness Measurement

Gauging for the 5, 10, 15, 20 and 25-year special (renewal) surveys and intermediate surveys, plus pre-docking steel estimates.

Explore

CAS (Condition Assessment Scheme)

Thickness measurement and survey support for the IMO Condition Assessment Scheme, and what CAS asks of an older tanker today.

Explore

CAP Thickness Measurement

Gauging and close-up survey data for a Condition Assessment Programme, the voluntary class service charterers ask for on older tankers and bulk carriers.

Explore

ESP Gauging

Thickness measurement and close-up survey support for oil tankers, chemical tankers and bulk carriers under the ESP Code.

Explore

Hull Structural Integrity

Substantial and excessive corrosion, pitting, grooving, buckling and fatigue cracks, with magnetic particle and penetrant crack detection.

Explore

Ship Piping Inspection

Wall-thickness gauging of cargo, ballast, fuel, sea-water and fire-main piping, with minimum-wall checks and isometric sketches.

Explore

Scrubber Piping Inspection

EGCS wash-water and overboard discharge piping, the hull penetration area and scrubber welds, checked between dockings.

Explore

IHM (Inventory of Hazardous Materials)

IHM Part I surveys, sampling and maintenance for the EU Ship Recycling Regulation and the Hong Kong Convention.

Explore

Marine NDT Services

Every NDT method we use on ships, from visual inspection and MPI to PAUT and ACFM, chosen by the defect you are looking for.

Explore

Singapore: bunkering hub, anchorage and ship-repair centre

Most ships in Singapore waters are not there to load or discharge. They come for bunkers, crew changes, provisions, spare parts, surveys and repairs, and they spend that time at anchor in the Eastern, Western and other designated anchorages off the island. The container terminals, run by PSA and being consolidated at the new Tuas Port in the west, handle one of the world's largest transhipment flows, but the anchorages are where the inspection opportunity is greatest: a ship in ballast at anchor, outside cargo operations, has both time and access for gauging. Owners often time a Singapore stop so that a class survey item or a superintendent's attendance falls into the same anchorage period.

Ship repair is the second pillar. Seatrium, formed from the combination of the Keppel and Sembcorp Marine yards, carries out repair, upgrade and conversion work alongside its offshore business, and other repair yards in the Tuas, Benoi and Jurong areas take tankers, bulk carriers, container ships, gas carriers and cruise ships for docking. Large conversion projects — tankers turned into floating production units, for example — have long been part of the Singapore yards' business, and each one starts with a thorough assessment of hull condition. Jurong Island's oil and chemical terminals add a steady flow of product and chemical tankers alongside.

Singapore is also one of Asia's main ship-management centres, with technical managers, owners, charterers' vetting teams and class societies concentrated in a small city. Superintendents can attend a gauging at anchorage and be back at their desks the same day, which makes Singapore a practical place for pre-purchase inspections, on-hire and off-hire condition surveys and pre-docking gauging before a ship goes into a local yard or onward to China or the Middle East. The local bunker tanker fleet, working alongside ship after ship at the anchorages, is an inspection market in its own right.

Launch piers, anchorages and yards in Singapore

Singapore gauging starts at the anchorages. The team boards by launch from the city's launch piers — typically Marina South Pier for the eastern anchorages and West Coast Pier for the western ones — as arranged by the ship's agent. A ship at anchor for bunkers or crew change can open ballast tanks and, in ballast, cargo holds; tankers can make cargo tanks available if they are gas-free. Work during bunkering follows the master's restrictions on enclosed-space entry and deck access near the manifold.

In the yards, gauging supports renewal and intermediate surveys, steel renewal, conversions and repairs, working inside the yard's permit and safety system; each yard runs its own contractor registration, so names and documents go to the yard ahead of the team. At the container terminals and the oil terminals on Jurong Island and elsewhere, berth stays are short and gauging is limited to deck, piping and accessible spaces. Port limits also matter: a ship lying outside Singapore port limits may be in a neighbouring state's waters, where boarding is arranged differently and the agent has to confirm what is allowed before the team goes out.

  • Eastern and Western anchorages — pre-purchase, on-hire, off-hire and pre-docking gauging on ships calling for bunkers, crew change or stores, boarded by launch.
  • Seatrium yards — renewal survey, CAP and conversion-assessment gauging on tankers, bulk carriers and gas carriers in dock and at the repair quays.
  • Repair yards at Tuas and Benoi — dockings of tankers, gas carriers and container ships; docking-survey readings and pipe wall-thickness checks.
  • PSA container terminals, including Tuas Port — container ships on transhipment calls; hatch coamings, deck plating and the scrubber discharge line, measured while the cranes work.
  • Jurong Island oil and chemical terminals — chemical and product tankers alongside; deck structure and piping measured under the terminal's safety rules.
  • Harbour bunker tankers — hull, cargo tank and cargo piping gauging on the bunker tankers serving the anchorages, during planned maintenance stops.

Thickness measurement through the survey cycle at Singapore

Class rules set the survey cycle, and the cycle sets how much gauging a ship needs. A superintendent planning a call at Singapore usually knows which survey is due; the table shows what the thickness measurement for each one typically involves. The exact extent comes from the class rules for the ship type and the surveyor attending, so the thickness measurement programme is agreed with the class before work starts.

SurveyWhen it fallsWhat the thickness measurement usually covers
Annual surveyEvery year, within three months of the anniversary dateGeneral examination. Gauging where the surveyor finds suspect areas or where substantial corrosion was recorded at an earlier survey.
Intermediate surveyIn place of the second or third annual surveySuspect areas, and on older ships and ESP ships selected ballast and cargo spaces with close-up survey; the extent grows with age.
Renewal survey No. 1Around 5 yearsThe first full baseline: suspect areas and selected plating and stiffeners, usually with modest steel renewal.
Renewal survey No. 2Around 10 yearsWider gauging of deck, bottom and side plating, transverse sections across the cargo area on ESP ships, and more close-up survey.
Renewal survey No. 3Around 15 yearsExtensive gauging of cargo and ballast tank structure and more transverse sections. The survey most likely to turn up steel renewal.
Renewal survey No. 4 and laterAround 20 and 25 yearsGauging extended to most structural members in cargo and ballast spaces. Charterers often add a Condition Assessment Programme.
Docking surveyTwice in each five-year periodBottom and side shell, sea chests, rudder and stern area while the hull is dry; suspect bottom plating gauged.

MPA rules, Tokyo MoU and the Singapore market

Under the Tokyo MoU, the Maritime and Port Authority of Singapore (MPA) carries out port state control, and it also runs the Singapore Registry of Ships, one of the world's largest flag registers. MPA has not allowed open-loop scrubber wash-water discharge in Singapore port waters since 1 January 2020, so scrubber-fitted ships at anchor run closed-loop, use compliant fuel or shut the scrubber down — and an idle scrubber at anchor is the easiest time to gauge its wash-water and overboard piping and inspect the shell penetrations.

The bunkering trade adds its own inspection needs. The harbour bunker tankers serving the anchorages work hard, berthing alongside ship after ship in all weather, and their hulls, cargo tanks and piping deserve regular gauging. Beyond bunkering, Singapore's position on the route between Europe, the Middle East and East Asia means owners often use a Singapore call to gather condition data: CAP gauging on an older tanker, a pre-purchase survey, or a steel estimate before a docking in a Singapore yard or further afield. Managers based here also commission gauging for ships docking across Southeast Asia and China, where consistent reporting across the fleet matters.

Wherever a ship is outside a sulphur emission control area, the global 0.50% sulphur cap applies, and many of the ships calling at Singapore meet it with an exhaust gas cleaning system rather than compliant fuel. Scrubber wash-water piping, the overboard discharge and the hull penetration around it corrode quickly in service, especially on open-loop systems, and are worth adding to the gauging scope.

Typical thickness gauging jobs in Singapore

Ship inspection in Singapore is dominated by anchorage jobs on ships that are already stopping for other reasons, and yard jobs during dockings and conversions. We plan the scope with the superintendent around the ship's stay, book launches through the agent, and mobilise the team from India once the anchorage window or dock date is confirmed. Every report is laid out to the class TM formats.

  • Pre-purchase gauging of an Aframax tanker at the Eastern anchorage during a bunker and crew-change stop, covering ballast tanks and, after gas-freeing, selected cargo tanks.
  • Scrubber wash-water and overboard piping gauging on a bulk carrier at anchor while its scrubber is out of service in port waters, with crack detection at shell penetrations.
  • Renewal survey and CAP gauging on an ageing VLCC in a Seatrium dock, with readings issued daily for steel renewal planning.
  • Hull condition gauging of a tanker being assessed as a conversion candidate at a Singapore yard, giving the owner and its naval architects wide-coverage data.
  • Redelivery at the end of a period charter: a container ship at anchorage, with owner and charterer both needing a deck, coaming and ballast tank thickness record before it sails.

How a thickness measurement job runs at Singapore

Most of the work on a Singapore job happens before the team boards: scope, plan and access are settled first, so the time on board goes on measurement.

The team arrives through Singapore Changi Airport. Launches for the anchorages leave from Marina South Pier or West Coast Pier, depending on where the ship lies, and are booked by the agent; PSA terminals and the repair yards each issue their own passes, applied for through the agent or the yard. Indian passport holders need a visa for Singapore, and any work-pass requirement for an assignment is confirmed before travel, so the paperwork starts as soon as the anchorage window or dock date is known. Ships lying outside port limits may need different boarding arrangements, which the agent confirms.

  • Send the vessel name or IMO number, ship type, class society, the survey due (annual, intermediate, renewal survey number, CAP or owner's condition survey), the port and dates, and the scope you expect.
  • We confirm the scope against the class rules for that survey, prepare the thickness measurement plan with frame and section references, and say whether the measurement will be credited to a class survey.
  • Mobilisation is planned around visa lead times and the vessel's schedule; the ship's agent arranges port access, and the yard or ship arranges staging, lighting, ventilation and gas-free certificates.
  • Gauging with calibrated ultrasonic thickness gauges: through sound coatings only where the gauge's through-coating mode has been verified on a coated reference, otherwise on cleaned bare steel, with every reading tied to its frame, strake and location on the sketch.
  • Readings are compared with original thicknesses as work proceeds; substantial and excessive corrosion and any cracks are reported to the attending surveyor and the superintendent the same day.
  • The final report is issued on the class thickness-measurement formats with sketches, a summary of locations exceeding the allowable margins, piping tables where piping was in scope, and the gauge calibration and technician certificates.

Who does the work, and when class approval applies

The inspection team is mobilised from India for each job; nobody is stationed at the port, so mobilisation is planned against the vessel's schedule and visa lead times. Our founder and Responsible NDT Level III, who holds ASNT NDT Level III in UT, RT, MT, PT and VT and has over eleven years of international field experience, plans and supervises the work. Technicians are certified under the company's written practice to ASNT SNT-TC-1A, and the company holds ISO 9001 and ISO 14001 certification.

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Governing codes and standards

  • IACS UR Z7 hull classification surveys
  • IACS UR Z10.1 to Z10.5 (oil tankers, bulk carriers, chemical tankers, double-hull and double-skin ships)
  • IACS UR Z17 approval of service suppliers
  • SOLAS chapter XI-1 regulation 2 and the 2011 ESP Code
  • MARPOL Annex VI regulation 14 and the 2021 EGCS Guidelines (MEPC.340(77))
  • The rules of the vessel's classification society

What you receive

  • Thickness measurement report on the class formats, with sketches
  • Summary of substantial and excessive corrosion against allowable margins
  • Pitting and grooving records with depth and extent
  • Piping wall-thickness tables with isometric sketches
  • Magnetic particle or penetrant crack-detection reports
  • Gauge calibration records and technician certificates

Industries served

  • Crude and product tankers
  • Bulk carriers
  • Container ships
  • LNG and LPG carriers
  • Chemical tankers
  • Bunker tankers
  • Offshore vessels and floating production units

Frequently asked questions

Is a bunker stop at a Singapore anchorage long enough for useful gauging?

That depends on the length of the stay and the ship's condition. A short bunker and crew-change stop allows a focused scope — selected ballast tanks, deck structure, piping — while a longer stay for repairs or orders allows much more. We agree a prioritised list with the superintendent so the most important spaces are covered first, and any remainder can be completed at a later call or in the yard.

Can scrubber piping inspection be done at anchor in Singapore?

Yes, and anchor is a good time. Because open-loop discharge is not permitted in Singapore port waters, the scrubber is either running closed-loop or out of service, and when it is shut down, wash-water lines, overboard piping and the shell penetration can be gauged and crack-tested safely. Readings concentrate where flow changes direction or speed — elbows, reducers, the pipe just past each valve — and at the overboard connection itself.

Can the team stay with a ship through a Singapore yard period?

Yes. When a ship docks in Singapore for its renewal survey, intermediate survey or a repair period, we mobilise a team for the docking, work to the yard's permit and safety rules, and measure to the scope the superintendent and class surveyor set. Readings are issued as each space is completed, giving the yard time to renew steel before undocking.

What about ships waiting outside port limits?

Ships lying outside Singapore port limits are a common sight, particularly when trades are slow. They can be gauged, but they may be in the waters of a neighbouring state, launch services and boarding formalities differ, and the agent must confirm what is allowed. If the ship is coming into the Singapore anchorages anyway, thickness gauging at Singapore anchorage is usually the simpler option.

Does thickness measurement at Singapore need class approval?

Thickness measurement that a classification society credits to a class survey has to be carried out by a firm approved by that society under IACS UR Z17. Atlantis is in the process of obtaining UR Z17 approval from DNV, Lloyd's Register and ABS. Until a certificate is issued, the readings we take are for the owner's own decisions, not for credit to a class survey, so tell us the vessel's class and the survey due when you enquire and we set the scope for the right purpose. Owner's and charterer's condition gauging, pre-docking steel estimates, pre-purchase and on-hire or off-hire gauging, and scrubber and piping condition checks between surveys do not need class approval.

Planning a survey or a drydock?

Send the vessel name or IMO number, the class, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.

Request a Quote

Request a ship gauging quote

Send the vessel name or IMO number, the class society, the survey due and the port. We reply with the scope, the mobilisation plan and a quote for that vessel.








Speak to an ASNT NDT Level III

Atlantis NDT provides ASNT Level III consulting, NDT training to ASNT SNT-TC-1A, inspection management software and independent report validation. Request a free consultation and we will return a tailored quote — affordable, accessible and fully customizable to your programme.